Found 100 inspections:

# 002004251636
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-02-06, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu proverki vypolneniya ranee vydannogo predpisaniya ot 07102019 CH45331 srok dlya ispolneniya kotorogo istek Zadachami nastoyaschei proverki yavlyaetsya osuschestvlenie meropriyatii po kontrolyu za ustraneniem narushenii ukazannyh v punktah predpisaniya ot 07102019 CH45331Predmetom nastoyaschei proverki yavlyaetsyavypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora


# 001800171010
Unscheduled inspection
Start date: 2018-03-01, end date: 2018-03-02, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: S celyu vydachi razresheniya na dopusk v ekspluataciyu energoustanovok na osnovanii zayavlenii direktora OOO «Trest Magnitostroi» ish 020 ot 05022018 025 ot 08022018 vh CH 1596 ot 06022018 vh 1725 ot 09022018 Zadachami nastoyaschei proverki yavlyaetsya osuschestvlenie vneplanovoi vyezdnoi proverki tehnicheskogo sostoyaniya i bezopasnoi ekspluatacii elektroustanovki elektrooborudovaniya KL10 kV ot TP 2 do KTP3 KTP3 pos Zvezdnyi elektrooborudovanie KTP 23B pos Razdole g Magnitogorsk Predmet sootvetstvie svedenii soderzhaschihsya v zayavlenii i dokumentah yuridicheskogo lica


# 00170803018956
Unscheduled inspection
Start date: 2017-12-21, end date: 2017-12-21, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Zadachami nastoyaschei proverki yavlyaetsya osuschestvlenie meropriyatii po kontrolyu tehnicheskogo sostoyaniya i bezopasnoi ekspluatacii sistemy teplopotrebleniya v zdanii obschestvennogo naznacheniya po adresu g CHelyabinsk Kurchatovskii raion zhiloi raion 12 Krasnopolskoi ploschadki 1 mikroraion 52 teplotrassa ot TK160a do zhilogo doma 32


# 00170803023624
Unscheduled inspection
Start date: 2017-12-20, end date: 2017-12-20, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: s celyu vydachi razresheniya na dopusk v ekspluataciyu energoustanovok na osnovanii zayavleniya OOO «Trest Magnitostroi» ish 409 ot 04122017 vh CH17127 ot 04122017


# 00170802716962
Unscheduled inspection
Start date: 2017-10-11, end date: —, duration:
Authority:
Purpose of inspection:


# 00170802449115
Unscheduled inspection
Start date: 2017-09-28, end date: 2017-09-29, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: osuschestvlenie vneplanovoi vyezdnoi proverki tehnicheskogo sostoyaniya i bezopasnoi ekspluatacii elektroustanovki KL04 kV ot TP 66A do VRU zhd 6 ofisa 2 ofisa 1 zhd 6 KL10 kV ot TP 23A do KTP 23D elektrooborudovanie KTP23D po adresu CHelyabinskaya oblast g Magnitogorsk 147 mkr p «Razdole»


# 00160601469158
Unscheduled inspection
Start date: 2016-02-08, end date: 2016-02-11, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya OOO «Trest Magnitostroi» punktov ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii ot 21092015 CH1444 srok dlya ispolneniya kotoryh istek


# 742201533613
Unscheduled inspection
Start date: 2022-01-20, end date: 2022-01-26, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Proverka ispolneniya predpisaniya ot 12.11.2021 g. so srokom ispolneniya do 20.12.2021. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742201503807
Unscheduled inspection
Start date: 2022-01-12, end date: 2022-01-18, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po ustroistvu fundamentov (v processe proizvodstva rabot). i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742201515643
Unscheduled inspection
Start date: 2022-01-24, end date: 2022-01-28, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of the basement and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of the Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.


# 742201533698
Unscheduled inspection
Start date: 2022-01-18, end date: 2022-01-24, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po zemlyanym rabotam i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742101436521
Unscheduled inspection
Start date: 2021-12-10, end date: —, duration:
Authority:
Purpose of inspection:


# 742101395273
Unscheduled inspection
Start date: 2021-12-09, end date: 2021-12-15, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po podgotovitelnym rabotam, zabivke svai (po okonchaniyu proizvodstva rabot), ustroistvu fundamentov (po okonchaniyu proizvodstva rabot), vozvedeniyu konstrukcii nizhe 0,000 b/s 1-4 (v processe proizvodstva rabot), vozvedeniyu konstrukcii 1 etazh b/s 2,3 (v processe proizvodstva rabot), montazhu naruzhnyh setei vodosnabzheniya i vodootvedeniya (v processe proizvodstva rabot), montazhu naruzhnyh setei gazosnabzheniya (v processe proizvodstva rabot). i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742101436327
Unscheduled inspection
Start date: 2021-12-17, end date: —, duration:
Authority:
Purpose of inspection:


# 742101436268
Unscheduled inspection
Start date: 2021-12-15, end date: 2021-12-21, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po ustroistvu rostverka b/s 4-6 (v processe proizvodstva rabot), montazhU ZHBI nizhe otm. 0.000 b/s 4-6 (v processe proizvodstva rabot), montazhu nesuschih i ograzhdayuschih konstrukcii 1-6 etazh 3-1 b/s (v processe proizvodstva rabot). i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742101244150
Unscheduled inspection
Start date: 2021-11-10, end date: —, duration:
Authority:
Purpose of inspection:


# 742101245252
Unscheduled inspection
Start date: 2021-11-11, end date: 2021-11-17, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po ustanovke okon i vitrazhei (po okonchaniyu rabot), naruzhnoi otdelke (po okonchaniyu rabot), ustroistvu naruzhnyh i vnutrennih inzhenernyh setei (v processe rabot), elektrosnabzheniyu i elektroosvescheniyu (v processe rabot), ustroistvu naruzhnyh setei gazosnabzheniya (po okonchaniyu rabot), vnutrennei otdelke (v processe rabot), blagoustroistvu territorii (v processe rabot). i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742101375486
Unscheduled inspection
Start date: 2021-11-29, end date: —, duration:
Authority:
Purpose of inspection:


# 742101244179
Unscheduled inspection
Start date: 2021-11-29, end date: 2021-12-03, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po otdelochnym rabotam - po okonchaniyu proizvodstva rabot, elektromontazhnym rabotam - po okonchaniyu proizvodstva rabot, otopleniyu - po okonchaniyu proizvodstva rabot, blagoustroistvu - po okonchaniyu proizvodstva rabot, proverke soblyudeniya voprosov sanitarno-epidemiologicheskih trebovanii i pozharnoi bezopasnosti - po okonchaniyu rabot. i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742101244206
Unscheduled inspection
Start date: 2021-11-08, end date: 2021-11-12, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po podgotovitelnym rabotam, zabivke svai (v processe proizvodstva rabot), ustroistvu fundamentov (v processe proizvodstva rabot). i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742101358326
Unscheduled inspection
Start date: 2021-11-23, end date: —, duration:
Authority:
Purpose of inspection:


# 742101369567
Unscheduled inspection
Start date: 2021-11-24, end date: 2021-11-30, duration: 9
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po Proverka protivopozharnyh i sanitarno-epidemiologicheskih meropriyatii, meropriyatii po obespecheniyu dostupa malomobilnyh grupp naseleniya (posle fakticheskogo okonchaniya rabot). Blagoustroistvo territorii (posle zaversheniya rabot) i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742101338858
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration:
Authority:
Purpose of inspection:


# 742101338322
Unscheduled inspection
Start date: 2021-11-19, end date: 2021-12-02, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of foundations and building materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of the Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100678773
Unscheduled inspection
Start date: 2021-10-06, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742100678844
Unscheduled inspection
Start date: 2021-10-07, end date: 2021-10-13, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po ustroistvu fundamentov (v processe rabot). i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100678951
Unscheduled inspection
Start date: 2021-10-04, end date: 2021-10-08, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po montazhu nesuschih i ograzhdayuschih konstrukcii 1-2 b/s 9, 10 etazh -po okonchaniyu rabot, montazhu tehnicheskogo pomescheniya 1-2 b/s - po okonchaniyu rabot, naruzhnym i vnutrennim setyam - v processe proizvodstva rabot, otdelochnym rabotam - v processe proizvodstva rabot, elektromontazhnym rabotam - v processe proizvodstva rabot, otopleniyu - v processe proizvodstva rabot, blagoustroistvu - v processe proizvodstva rabot, ustroistvu krovli - v processe proizvodstva rabot. i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100678125
Unscheduled inspection
Start date: 2021-10-01, end date: —, duration:
Authority:
Purpose of inspection:


# 742100638409
Unscheduled inspection
Start date: 2021-09-15, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742100638220
Unscheduled inspection
Start date: 2021-09-13, end date: —, duration:
Authority:
Purpose of inspection:


# 742100554435
Unscheduled inspection
Start date: 2021-09-13, end date: —, duration:
Authority:
Purpose of inspection:


# 742100679151
Unscheduled inspection
Start date: 2021-09-30, end date: 2021-10-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the work on the construction of structures below 0.000 b/s 4 (at the end of the work), the construction of structures on the 1st floor of b/s 1-3 (at the end of the work), the construction of structures on the 1,2 floor of b/s 4 (in the process of work), the construction of structures on the 2nd floor of b/s 1,2,3 (in the process of work), construction of structures on the 3rd floor of second-hand buildings 1,2,3 (in the process of work), power supply and electric lighting (in the process of work), installation of outdoor gas supply networks (in the process of work). and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100928831
Unscheduled inspection
Start date: 2021-09-28, end date: 2021-10-04, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po montazhu cokolya, ustroistvu fundamenta posle zaversheniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100492459
Unscheduled inspection
Start date: 2021-09-06, end date: 2021-09-10, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Proverka ispolneniya predpisaniya ot 05.07.2021 g. so srokom ispolneniya do 16.08.2021 g. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100492401
Unscheduled inspection
Start date: 2021-09-06, end date: 2021-09-10, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Proverka ispolneniya predpisaniya ot 01.07.2021 g. so srokom ispolneniya do 13.08.2021 g. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100515067
Unscheduled inspection
Start date: 2021-09-07, end date: 2021-09-20, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po rabotam POS, razrabotke grunta i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100561241
Unscheduled inspection
Start date: 2021-09-02, end date: 2021-09-08, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Proverka ispolneniya predpisaniya ot 02.08.2021 g. so srokom ispolneniya do 23.08.2021 Proverka ispolneniya predpisaniya ot 02.08.2021 g. so srokom ispolneniya do 23.08.2021 Proverka ispolneniya predpisaniya ot 02.08.2021 g. so srokom ispolneniya do 23.08.2021 Proverka ispolneniya predpisaniya ot 02.08.2021 g. so srokom ispolneniya do 23.08.2021 Proverka ispolneniya predpisaniya ot 02.08.2021 g. so srokom ispolneniya do 23.08.2021 Proverka ispolneniya predpisaniya ot 02.08.2021 g. so srokom ispolneniya do 23.08.2021. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100488293
Unscheduled inspection
Start date: 2021-09-03, end date: 2021-09-09, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po ustroistvu svainogo polya, ustroistvu fundamenta v processe rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100435470
Unscheduled inspection
Start date: 2021-09-01, end date: 2021-09-07, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Proverka ispolneniya predpisaniya ot 20.07.2021 g. so srokom ispolneniya do 23.08.2021. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100638182
Unscheduled inspection
Start date: 2021-09-20, end date: —, duration:
Authority:
Purpose of inspection:


# 742100638116
Unscheduled inspection
Start date: 2021-09-20, end date: —, duration:
Authority:
Purpose of inspection:


# 742100435481
Unscheduled inspection
Start date: 2021-08-18, end date: —, duration:
Authority:
Purpose of inspection:


# 742100384566
Unscheduled inspection
Start date: 2021-08-16, end date: 2021-08-20, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Proverka ispolneniya predpisaniya ot 03.06.2021 g. so srokom ispolneniya do 02.08.2021. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100410262
Unscheduled inspection
Start date: 2021-08-13, end date: —, duration:
Authority:
Purpose of inspection:


# 742100451427
Unscheduled inspection
Start date: 2021-08-30, end date: —, duration:
Authority:
Purpose of inspection:


# 742100451443
Unscheduled inspection
Start date: 2021-08-30, end date: —, duration:
Authority:
Purpose of inspection:


# 742100384634
Unscheduled inspection
Start date: 2021-08-09, end date: 2021-08-13, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po montazhu nesuschih i ograzhdayuschih konstrukcii 2-go, 3-go etazha (po okonchaniyu rabot), ustroistvu krovli (po okonchaniyu rabot), ustanovke okon i vitrazhei (v processe rabot), vnutrennei i naruzhnoi otdelke (v processe rabot), montazhu inzhenernyh setei (po okonchaniyu rabot), elektrosnabzheniyu i elektroosvescheniyu (po okonchaniyu rabot), blagoustroistvu (v processe rabot) i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100384533
Unscheduled inspection
Start date: 2021-08-05, end date: 2021-08-11, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po montazhu tehnicheskogo etazha - po okonchaniyu rabot, montazhu nesuschih i ograzhdayuschih konstrukcii 1-2 b/s 6-10 etazh - po okonchaniyu rabot, montazhu tehnicheskogo pomescheniya 1-2 b/s - v processe proizvodstva rabot, naruzhnym i vnutrennim setyam - v processe proizvodstva rabot, livnevoi kanalizacii - v processe proizvodstva rabot, otdelochnym rabotam - v processe proizvodstva rabot, elektromontazhnym rabotam - v processe proizvodstva rabot, otopleniyu - v processe proizvodstva rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100377598
Unscheduled inspection
Start date: 2021-08-04, end date: —, duration:
Authority:
Purpose of inspection:


# 742100343459
Unscheduled inspection
Start date: 2021-07-19, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742100355903
Unscheduled inspection
Start date: 2021-07-19, end date: —, duration:
Authority:
Purpose of inspection:


# 742100328200
Unscheduled inspection
Start date: 2021-07-14, end date: —, duration:
Authority:
Purpose of inspection:


# 742100302888
Unscheduled inspection
Start date: 2021-07-14, end date: 2021-07-27, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po naruzhnoi otdelke, kondicionirovaniyu, montazhu slabotochnyh setei - v processe proizvodstva rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100392618
Unscheduled inspection
Start date: 2021-07-30, end date: —, duration:
Authority:
Purpose of inspection:


# 742100343478
Unscheduled inspection
Start date: 2021-07-28, end date: 2021-08-03, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Proverka ispolneniya p. 4 predpisaniya ot 21.05.2021 g. so srokom ispolneniya do 21.06.2021. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100345936
Unscheduled inspection
Start date: 2021-07-29, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742100365499
Unscheduled inspection
Start date: 2021-07-22, end date: 2021-07-28, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Proverka ispolneniya predpisaniya ot 03.06.2021 g. so srokom ispolneniya do 02.08.2021 g. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100345911
Unscheduled inspection
Start date: 2021-07-20, end date: 2021-07-26, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po montazhu nesuschih i ograzhdayuschih konstrukcii 2-go, 3-go etazha (v processe rabot), ustroistvu krovli (v processe rabot), ustanovke okon i vitrazhei (v processe rabot), vnutrennei i naruzhnoi otdelke (v processe rabot), montazhu inzhenernyh setei (v processe rabot), elektrosnabzheniyu i elektroosvescheniyu (v processe rabot), blagoustroistvu (v processe rabot). i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100261494
Unscheduled inspection
Start date: 2021-06-18, end date: 2021-06-24, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po proverke protivopozharnyh i sanitarno-epidemiologicheskih meropriyatii, meropriyatii po dostupu malomobilnyh grupp naseleniya, meropriyatii po energoeffektivnosti, blagoustroistvo, ustanovka MAF (po okonchaniyu vypolnennyh rabot) i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100282200
Unscheduled inspection
Start date: 2021-06-16, end date: 2021-06-22, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the installation of window blocks, finishing works, installation of internal and external engineering systems, landscaping, insulation of exterior walls using the Ceresit system with thin-walled plaster, verification of fire and sanitary-epidemiological measures, access measures for low-mobility groups of the population, energy efficiency measures, landscaping and applied building materials during the construction, reconstruction of a capital construction facility, as well as the results of such work, the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (in if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100261353
Unscheduled inspection
Start date: 2021-06-15, end date: 2021-06-21, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po ustroistvu krovli, ustanovke dverei, vnutrennei otdelke pomeschenii, montazhu naruzhnyh inzhenernyh setei - v processe proizvodstva rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100265488
Unscheduled inspection
Start date: 2021-06-11, end date: 2021-06-18, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Proverka ispolneniya predpisaniya ot 28.04.2021g., srok ispolneniya 24.05.2021. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100286016
Unscheduled inspection
Start date: 2021-06-30, end date: 2021-07-13, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Proverka ispolneniya predpisaniya ot 15.12.2020g., srok ispolneniya 01.06.2021. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100261485
Unscheduled inspection
Start date: 2021-06-09, end date: 2021-06-16, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Proverka ispolneniya predpisaniya ot 26.04.2021g., srok ispolneniya 24.05.2021. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100300001
Unscheduled inspection
Start date: 2021-06-29, end date: 2021-07-05, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the construction of structures below 0.000 b/s 3, b/s 4 (in the process of work), above 0.000 b/s 1, b/s 2 (in the process of work), installation of windows and stained glass windows (in the process of work), exterior decoration (in the process of work), installation of external water supply, sanitation, and gas supply networks (in progress) and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100300087
Unscheduled inspection
Start date: 2021-06-29, end date: 2021-07-05, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the installation of load-bearing and enclosing structures of the 2nd and 3rd floors (in the process of work), roofing (in the process of work), installation of windows and stained glass windows (in the process of work), interior and exterior decoration (in the process of work), installation of engineering networks (in the process of work), electricity supply and electric lighting (during work), landscaping (during work) and the construction materials used during construction, reconstruction of a capital construction facility, as well as the results of such work, according to the requirements of the design documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the design documentation documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100231933
Unscheduled inspection
Start date: 2021-06-07, end date: 2021-06-11, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Proverka ispolneniya predpisaniya ot 29.04.2021g., srok ispolneniya 24.05.2021. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100261349
Unscheduled inspection
Start date: 2021-06-07, end date: 2021-06-11, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Proverka ispolneniya p.1, p.2, p.3 predpisaniya ot 26.04.2021g., srok ispolneniya 24.05.2021. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100284053
Unscheduled inspection
Start date: 2021-06-25, end date: —, duration:
Authority:
Purpose of inspection:


# 742100300027
Unscheduled inspection
Start date: 2021-06-24, end date: 2021-06-30, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po montazhu nesuschih i ograzhdayuschih konstrukcii 3-4 b/s 7-10 etazh - v processe proizvodstva rabot, montazhu nesuschih i ograzhdayuschih konstrukcii 1-2 b/s 1-5 etazh - v processe proizvodstva rabot, naruzhnym i vnutrennim setyam - v processe proizvodstva rabot, livnevoi kanalizacii - v processe proizvodstva rabot, otdelochnym rabotam - v processe proizvodstva rabot, elektromontazhnym rabotam - v processe proizvodstva rabot, otopleniyu - v processe proizvodstva rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100261527
Unscheduled inspection
Start date: 2021-06-21, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 662100198346
Unscheduled inspection
Start date: 2021-05-17, end date: —, duration: 4
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya vneplanovaya vyezdnaya proverka provoditsya s celyu: proverki vypolneniya OOO «Trest Magnitostroi» punktov ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii ot 07.10.2019 № CH-4533/2, srok dlya ispolneniya kotoryh istek. Zadachami nastoyaschei vneplanovoi vyezdnoi proverki yavlyayutsya: osuschestvlenie meropriyatii po kontrolyu za ustraneniem narushenii, ukazannyh v predpisanii ot 07.10.2019 № CH-4533/2. Predmetom nastoyaschei proverki yavlyaetsya: vypolnenie predpisanii organov gosudarstvennogo kontrolya (nadzora).


# 742100207496
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-05-21, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po ustroistvu polov, montazhu vnutrennih sistem otopleniya i ventilyacii, montazhu vnutrennih sistem elektrosnabzheniya - v processe proizvodstva rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100231885
Unscheduled inspection
Start date: 2021-05-31, end date: —, duration:
Authority:
Purpose of inspection:


# 742100231908
Unscheduled inspection
Start date: 2021-05-28, end date: —, duration:
Authority:
Purpose of inspection:


# 742100231895
Unscheduled inspection
Start date: 2021-05-28, end date: —, duration:
Authority:
Purpose of inspection:


# 742100210399
Unscheduled inspection
Start date: 2021-05-27, end date: 2021-06-02, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po montazhu vnutrennih inzhenernyh setei (v processe proizvodstva rabot) i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100210436
Unscheduled inspection
Start date: 2021-05-25, end date: 2021-06-07, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po montazhu peregorodok, ustanovke okon, vnutrennih inzhenernyh setei, ustroistvu krovli, otdelochnym rabotam, blagoustroistvu territorii (v processe rabot) i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100207474
Unscheduled inspection
Start date: 2021-05-20, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742100158683
Unscheduled inspection
Start date: 2021-04-20, end date: 2021-04-26, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po montazhu okon i vitrazhei - v processe proizvodstva rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100158705
Unscheduled inspection
Start date: 2021-04-20, end date: 2021-04-26, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po ustroistvu krovli, montazhu dverei, vnutrennyaya otdelka pomeschenii, naruzhnaya otdelka zdaniya (ustroistvo navesnoi ventiliruemoi fasadnoi sistemy) (v processe proizvodstva rabot) i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100145554
Unscheduled inspection
Start date: 2021-04-15, end date: 2021-05-14, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po montazhu vnutrennih inzhenernyh sistem, ustroistvu vnutrennih otdelochnyh rabot, ustroistvo fasadov, blagoustroistvu, proverka protivopozharnyh, sanitarno-epidemiologicheskih meropriyatii (posle zaversheniya rabot) i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov; 2. Proverka zakonchennogo stroitelstvom obekta 3. Nalichie razresheniya na stroitelstvo. 4. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100132311
Unscheduled inspection
Start date: 2021-04-12, end date: 2021-05-11, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the performance of work on roofing, elevators, internal engineering networks, finishing work, facade installation, verification of fire protection, sanitary and epidemiological measures, verification of measures to ensure access for low-mobility groups of the population, landscaping (after completion of work) and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work, the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100162304
Unscheduled inspection
Start date: 2021-04-29, end date: 2021-05-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po montazhu nesuschih i ograzhdayuschih konstrukcii 1, 2 etazha - v processe proizvodstva rabot, ustroistvo naruzhnyh setei i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100065129
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-09, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po vnutrennim otdelochnym rabototam (v processe rabot) i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100162300
Unscheduled inspection
Start date: 2021-04-28, end date: 2021-05-05, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po ustroistvu krovli, ustanovke okon i vitrazhei, montazhu vnutrennih i naruzhnyh inzhenernyh sistem, elektrosnabzheniyu, elektroosvescheniyu i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 662100179032
Unscheduled inspection
Start date: 2021-04-26, end date: —, duration: 5
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 6. Ustanovit, chto: 6.1. Nastoyaschaya vneplanovaya vyezdnaya proverka provoditsya s celyu: proverki vypolneniya OOO «Trest Magnitostroi» punktov ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii ot 04.12.2019 № CH-5848, srok dlya ispolneniya kotoryh istek. 6.2. Zadachami nastoyaschei vneplanovoi vyezdnoi proverki yavlyayutsya: osuschestvlenie meropriyatii po kontrolyu za ustraneniem narushenii, ukazannyh v predpisanii ot 04.12.2019 № CH-5848. 7. Predmetom nastoyaschei proverki yavlyaetsya: - vypolnenie predpisanii organov gosudarstvennogo kontrolya (nadzora) ot 04.12.2019 № CH-5848, srok ispolneniya kotoryh istek.


# 742100158745
Unscheduled inspection
Start date: 2021-04-22, end date: 2021-05-06, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po montazhu peregorodok, ustanovke okon, vnutrennih inzhenernyh setei, ustroistvo krovli (v processe rabot) i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100049773
Unscheduled inspection
Start date: 2021-03-15, end date: 2021-03-19, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the foundations and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of the Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices used energy resources; 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100049649
Unscheduled inspection
Start date: 2021-03-12, end date: 2021-03-18, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the organization of the construction site, earthworks, works on the installation of a pile field (in the course of work) and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, on which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used; 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100094706
Unscheduled inspection
Start date: 2021-03-31, end date: 2021-04-13, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po montazhu nesuschih i ograzhdayuschih konstrukcii, ustroistvo naruzhnyh i vnutrennih inzhenernyh setei (v processe rabot) i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100065033
Unscheduled inspection
Start date: 2021-03-30, end date: 2021-04-05, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po po ustanovke okon, vitrazhei i dvernyh blokov, ustroistvo polov, naruzhnaya otdelka zdaniya (montazh karkasa navesnoi ventiliruemoi fasadnoi sistemy) (v processe proizvodstva rabot) i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100079230
Unscheduled inspection
Start date: 2021-03-30, end date: 2021-04-05, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po montazhu nesuschih i ograzhdayuschih konstrukcii 2-go etazha - v processe proizvodstva rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 662100040375
Unscheduled inspection
Start date: 2021-03-24, end date: 2021-03-26, duration: 3
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Cel: proverka vypolneniya OOO «Trest Magnitostroi» punktov ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii ot 23.01.2020 № CH-80, srok dlya ispolneniya kotorogo istek. Zadacha: osuschestvlenie meropriyatii po kontrolyu za ustraneniem narushenii, ukazannyh v predpisanii ot 23.01.2020 № CH-80. Predmet: vypolnenie predpisanii organov gosudarstvennogo kontrolya (nadzora).


# 742100084755
Unscheduled inspection
Start date: 2021-03-25, end date: 2021-03-31, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po ustroistvu sistem elektrosnabzheniya, otopleniya i ventilyacii, ustroistvo fasadov. Proverka meropriyatii po obespecheniyu pozharnoi bezopasnosti. V processe proizvodstva rabot. i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100025231
Unscheduled inspection
Start date: 2021-02-25, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742100027329
Unscheduled inspection
Start date: 2021-02-26, end date: —, duration:
Authority:
Purpose of inspection:


# 742105345735
Unscheduled inspection
Start date: 2021-02-15, end date: 2021-02-19, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po Montazh karkasa zdaniya (posle zaversheniya rabot) i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100022435
Unscheduled inspection
Start date: 2021-02-24, end date: —, duration:
Authority:
Purpose of inspection:


# 742100022347
Unscheduled inspection
Start date: 2021-02-24, end date: 2021-03-02, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po montazhu lestnic, vnutrennih peregorodok, krylec, kozyrkov, otmostki (v processe proizvodstva rabot) i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov; 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.