# 342101422237
Unscheduled inspection
Start date: 2021-12-08, end date: —, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the conformity of the Facility with the requirements of the approved project documentation ;
b) the objective of this audit is to ensure that the Facility meets the requirements of the approved design documentation.
7. The subject of this audit is compliance with mandatory requirements regarding the compliance of construction works, their results and the construction materials used with the requirements of the approved design documentation.
# 342101275584
Unscheduled inspection
Start date: 2021-11-10, end date: 2021-11-23, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the conformity of the Facility with the requirements of the approved design documentation, b) the objective of this audit is to ensure that the Facility meets the requirements of the approved design documentation, the subject of this audit is compliance with mandatory requirements regarding the compliance of construction works, their results and applied building materials with the requirements of the approved design documentation.
# 662100573559
Unscheduled inspection
Start date: 2021-09-02, end date: 2021-09-15, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-16-17/342-20-1 dated 2020-11-11; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility.: Residential section with built-in public facilities (No. C1 according to ROM) and above-ground parking (in axes 12'-28'/A'-E'; 1'-12'/M'-E') – 1st stage of construction; residential section with built-in public facilities (No. C2 according to ROM) and an above-ground-underground parking lot (in axes 1/2'-12'/A'-D) – Stage 2 of construction, located at 11 Danila Zvereva St., Yekaterinburg, the results of such work meet the requirements approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation project documentation, including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; and compliance with the requirements established by parts 2, 3, and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 342005218472
Unscheduled inspection
Start date: 2020-11-11, end date: 2020-11-24, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of the Facility with the requirements of the design documentation, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation, the objective of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including project documentation7 The subject of this audit is compliance with mandatory requirements regarding the compliance of construction works with their results and the construction materials used to meet the requirements of the approved design documentation 8 The inspection period is 10 working days. The inspection should begin on 11/12020. The inspection should be completed no later than 24/120209. The legal grounds for conducting the inspection are h 152 153st 48 h 1 38310 st 49 h 1 2 st 51 h 1 2 3 6 7 st 52 h 1 2 4 pp a n 3 i n 6 h 5 h 6 and 8 art 54 h 2 Art 5524 of the Urban Planning Code of the Russian Federation
# 662004495913
Unscheduled inspection
Start date: 2020-08-24, end date: 2020-09-18, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 2916.0142019 dated 2019/1205 Tasks implementation of regional state construction supervision Subject is to verify the compliance of the work and applicable building materials during the construction of a capital construction facility Five residential sections 913 according to the ROM of a 13-section residential building of variable storeys stage 2 construction located at Yekaterinburg the results of such work with the requirements approved in accordance with parts 15 152 and 153 article 48 of the Urban Planning Code of the Russian Federation, project documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 342004490000
Unscheduled inspection
Start date: 2020-08-14, end date: 2020-09-10, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the conformity of the Facility with the requirements of the design documentation, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation, the objective of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including project documentation7 The subject of this audit is compliance with mandatory requirements regarding the conformity of construction work with its results and the construction materials used to meet the requirements of the approved design documentation 8 The inspection period is 20 working days. The inspection should begin on 14082020 and the inspection should be completed no later than 100920209. The legal grounds for conducting the inspection are 152 152 153 st 48 h 1 38310 st 49 h 1 2 st 51 h 1 2 3 6 7 st 52 h 1 2 4 pp a n 3 i n 6 h 5 h 6 and 8 art 54 h 2 Art 5524 of the Urban Planning Code of the Russian Federation of the Russian Federation 1 2 pp a n 4 pp 42 5 7 10 13 16 24 Regulations on the implementation of state construction supervision in the Russian Federation approved by Decree of the Government of the Russian Federation dated February 1, 2006 g 54 "On State Construction Supervision in the Russian Federation"Paragraphs 11 and 21 of the Regulations on Inspection approved by the Decree of the Government of the Volgograd region dated July 10, 2012 211p
# 662004414448
Unscheduled inspection
Start date: 2020-05-26, end date: 2020-06-23, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 29160142618 dated 20181005 Tasks implementation of regional state construction supervision Subject to verification of compliance with the performance of work and applicable building materials during the construction of a capital construction facility Multi-storey two-section residential building 1 on ROM with built-in non-residential public premises on the ground floor of a roof-mounted gas boiler built-in underground Parking 2 on ROM GRPS 5 on ROM instead of demolished facilities located at the address Danila Zvereva Bekhtereva St., Yekaterinburg, Sverdlovsk Region, the results of such work meet the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for the energy used resources for obtaining a building permit and meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 342004381692
Unscheduled inspection
Start date: 2020-03-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662004215134
Unscheduled inspection
Start date: 2020-01-27, end date: 2020-02-21, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to implement the inspection program 29160142618 dated 05102018. The purpose of this inspection is to carry out regional state construction supervision.7 The subject of this inspection is to verify the compliance of work performed and building materials used during the construction of the capital construction facility "Multi-storey two-section residential building 1 on ROM with built-in non-residential public premises on the first floor of the roof gas the boiler room has a built-in underground parking lot 2 on ROM GRPSh 5 on ROM instead of demolished facilities" as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements set out in Parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661904044752
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-27, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 6 The subject of this audit is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility "Two-section multi-storey residential building with built-in public facilities 3 on ROM" located at Krasnolesya Street, Yekaterinburg, as well as the results of such work approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation Of the Russian Federation project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements are met. The efficiency requirements do not apply to the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by parts 2, 3, and 31 of Article 52 of the Urban Planning Code of the Russian Federation. The objectives of this audit are to carry out regional state construction supervision.
# 341904013949
Unscheduled inspection
Start date: 2019-11-27, end date: 2019-12-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: This inspection is carried out in connection with the receipt by 2111/2019 of the inspection notice dated 21102019 1 bx 849 dated 2111/2019 on the completion of the construction of the Facility in order to assess the compliance of the Facility with the requirements of the design documentation, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation. The purpose of this inspection is to ensure that the Facility meets the requirements of the design documentation in accordance with including taking into account the changes made to the project documentation 7 The subject of this audit is compliance with the mandatory requirements regarding the compliance of construction works, their results and the building materials used with the requirements of the project documentation, including taking into account the changes made to the project documentation
# 661903079990
Unscheduled inspection
Start date: 2019-10-01, end date: 2019-10-28, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 6 to Establish what the real test is aimed at the implementation of the programme of inspections 291601390181 of January 15, 2019 the purpose of this check are the implementation of the regional state building majorproblem of this review is to verify compliance of work and applicable building materials during the construction of capital construction object to the outcome of such works project documentation including requirements for energy efficiency, with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resources used as well as the availability of building permits and the requirements of parts 2 and 3 of article 31 of 52 of the town planning code of the Russian Federation of the results of such work the requirements adopted in accordance with paragraphs 152 and 153 of 15 of article 48 of the town planning code of the Russian Federation project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of the town planning code of the Russian Federation or of the information model in the case of the formation and maintenance of information models are required in accordance with the requirements of the town planning code of the Russian Federation including the energy efficiency standards with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resources to the presence of a building permit requirements established in parts 2 and 3 31 of article 52 of the town planning code of the Russian Federation
# 661903819996
Unscheduled inspection
Start date: 2019-10-21, end date: 2019-11-18, duration: —
Authority: Upravlenie gosudarstvennoi ohrany obektov kulturnogo naslediya Sverdlovskoi oblasti
Purpose of inspection: For the purpose of 1 establishing the presence or absence in the activities of a legal entity of violations of the mandatory requirements of legislation in the field of conservation, use, promotion and state protection of cultural heritage objects 2 taking measures aimed at ensuring the safety of the above-mentioned cultural heritage objects and preventing the threat of harm to them1 identifying and suppressing violations of the mandatory requirements for cultural heritage objects "Residential House" and "Rear administrative building" as well as the identified cultural heritage site "Residential building"2 prevention of the facts of the threat of harm to the objects of cultural heritage "Residential house" and "Rear administrative" as well as the identified object of cultural heritage "Residential House"3 taking measures in case of detection of violations of the mandatory requirements for cultural heritage objects "Residential house" and "Rear administrative building" as well as the identified cultural heritage object "Residential House"
# 341903897241
Unscheduled inspection
Start date: 2019-10-28, end date: 2019-11-11, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the conformity of the Facility with the requirements of the design documentation, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation, the objective of this audit is to ensure that the Facility meets the requirements of the design documentation, including taking into account the changes made to the design documentation. 7 The subject of this audit is compliance with mandatory requirements regarding compliance with construction works their results and the construction materials used meet the requirements of the design documentation, including taking into account the changes made to the design documentation
# 661903079899
Unscheduled inspection
Start date: 2019-09-30, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661902954751
Unscheduled inspection
Start date: 2019-08-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 341902853100
Unscheduled inspection
Start date: 2019-07-01, end date: 2019-07-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose of this audit is to assess the implementation of the order dated January 18, 2019 0407 issued by the Inspection of Specialized Developer SinaraDevelopment LLC. The purpose of this audit is to identify and prevent violations of the law on participation in shared-equity construction. The subject of this audit is the implementation of the Inspection order dated January 18, 2019 0407
# 661902594733
Unscheduled inspection
Start date: 2019-04-30, end date: 2019-06-03, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 6 To establish that this audit is being conducted in order to implement the inspection program 29160142618 dated October 05, 2018. The objectives of this audit are to carry out regional state construction supervision. 7 The subject of this audit is to verify the compliance of work performed and applicable building materials during the construction of the capital construction facility "Multi-storey two-section residential building 1 on ROM with built-in non-residential public premises on on the ground floor of the roof-mounted gas boiler house, an underground parking lot is built-in 2 according to ROM GRPSh 5 according to ROM instead of demolished facilities" located at Yekaterinburg Danila Zvereva Bekhtereva St. the results of such work meet the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices the energy resources used , as well as the availability of a building permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661902499841
Unscheduled inspection
Start date: 2019-02-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902419867
Unscheduled inspection
Start date: 2019-01-11, end date: —, duration: —
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Sverdlovskoi oblasti
Purpose of inspection:
# 661902441039
Unscheduled inspection
Start date: 2019-01-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 341802326327
Unscheduled inspection
Start date: 2018-12-14, end date: 2019-01-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Objectives assessment of compliance with the mandatory requirements established by Part 1 of Article 19, paragraphs 3 and 31 of Part 1 of Article 20 of the Federal Law of 30122004 214 FZ the purpose of this audit is to identify and prevent violations of legislation on participation in shared-equity construction subject matter compliance with the requirements for the content of the project declaration provided for in part 1 of Article 19, paragraphs 3 and 31 of Part 1 of Article 20 of the Federal Law 214FZ
# 341802191359
Unscheduled inspection
Start date: 2018-11-27, end date: 2018-12-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In order to assess the compliance of the Object with the project documentation, the task of this audit is to ensure that the Object meets the requirements of the project documentation
# 341802162227
Unscheduled inspection
Start date: 2018-11-27, end date: 2018-12-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In order to assess the compliance of the Object with the project documentation, the task of this audit is to ensure that the Object meets the requirements of the project documentation.
# 661802049881
Unscheduled inspection
Start date: 2018-11-06, end date: 2018-12-03, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is being conducted in order to implement the inspection program 29160139018 dated 06092018. The objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of work performed and building materials used in the construction of the capital construction facility "Two-section multi-storey residential building with built-in public facilities 3 on ROM" located at the address Sverdlovsk region Yekaterinburg, Krasnolesya Street, the results of such work meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 34170802948696
Unscheduled inspection
Start date: 2017-12-07, end date: 2017-12-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe purpose of this audit is to comply with mandatory requirements regarding the compliance of construction works, their results and the construction materials used with the requirements of technical regulations other regulatory legal acts and project documentation
# 66170802578032
Unscheduled inspection
Start date: 2017-09-26, end date: 2017-10-09, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The subject of the audit is monitoring the implementation of the previously issued regulation 291605527P1 dated July 28, 2017. The objectives of this audit are to carry out regional state construction supervision
# 66170701681877
Unscheduled inspection
Start date: 2017-06-07, end date: 2017-06-21, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the inspection program 29160130916 1 dated September 16, 2016. The objectives of this inspection are to carry out regional state construction supervision. The purpose of this inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "11-section residential building of variable storeys with built-in premises 31 on ROM" located at the address Sverdlovsk region Yekaterinburg Chkalovsky PH high voltage line corridor extension of Novosibirsk street projected section of the Yekaterinburg ring highway Residential area Solnechny 3 quarter Residential block 31 results of such work requirements of technical regulations requirements of fire safety safety rules and state standards of design documentation including requirements of energy efficiency and requirements of equipment of the capital construction facility metering devices used energy resources as well as the availability of a construction permit and meeting the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 66170701614026
Unscheduled inspection
Start date: 2017-05-22, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 66170701308103
Unscheduled inspection
Start date: 2017-01-19, end date: 2017-02-14, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the inspection program 29160130916 1 dated September 16, 2016, the objectives of which are to carry out state construction supervision
# 34160701247523
Unscheduled inspection
Start date: 2016-12-20, end date: 2016-12-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of an Object with the requirements of technical regulations of other regulatory legal acts and project documentation, the task of this audit is to ensure that the Object meets the requirements of technical regulations of other regulatory legal acts and project documentationthe subject of this audit is compliance with mandatory requirements regarding the compliance of construction works with their results and applied building materials with the requirements of technical regulations of other regulatory legal acts and project documentation
# 66160701127775
Unscheduled inspection
Start date: 2016-11-16, end date: 2016-11-25, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program 29160114616 dated May 06, 2016, the objectives of which are to carry out state construction supervision. The purpose of this inspection is to verify the compliance of the work and applicable building materials during the construction of a capital construction facility "Multi-storey residential building with built-in public facilities and underground parking 1 on ROM instead of the demolished building" located at Yekaterinburg Oktyabrsky district Butorina St. house 1 of the results of such work to building codes and regulations, fire safety requirements, safety rules and state standards, as well as to the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities
# 34160701097352
Unscheduled inspection
Start date: 2016-11-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66160700071575
Unscheduled inspection
Start date: 2016-09-05, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 66160700729360
Unscheduled inspection
Start date: 2016-09-16, end date: —, duration: —
Authority: —
Purpose of inspection: