# 001800396665
Unscheduled inspection
Start date: 2018-03-19, end date: 2018-03-23, duration: —
Authority: VostochnoSibirskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the regulation dated 29.012018 787TH The objectives of the audit are to identify and prevent violations of regulatory legal acts standards and norms governing the activities of the motor transport complex The subject of the audit is to comply with the regulations of the state control and supervision authorities
# 142100859770
Unscheduled inspection
Start date: 2021-09-29, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection:
# 142100519727
Unscheduled inspection
Start date: 2021-08-27, end date: 2021-09-09, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: inspections in accordance with the inspection program approved by the head of the Department of State Construction and Housing Supervision of the Republic of Sakha (Yakutia), on June 22, 2021, compliance with the construction of a capital construction facility by the developer, technical customer, and the person carrying out the construction, mandatory requirements in the field of construction and the construction materials (products) used, the established procedure for the construction and reconstruction of the facility capital construction;, prevention, detection and suppression of violations of legislation on urban planning activities, including project documentation, compliance with mandatory requirements and (or) requirements established by municipal legal acts, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (hereinafter referred to as the contractor).
# 142101206773
Unscheduled inspection
Start date: 2021-08-23, end date: 2021-09-17, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: verification of the actual elimination of previously identified violations prescribed for elimination by the instruction of the Office of Gosstroizhilnadzor RS(Ya) No. 08-02-645-21 dated 06/25/2021. .prevention, detection and suppression of violations of mandatory requirements of housing legislation. .Compliance with the regulations of state control (supervision) bodies and municipal control bodies
# 142100386975
Unscheduled inspection
Start date: 2021-06-10, end date: 2021-06-25, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: verification of the facts of non-placement of information, incomplete placement of information or placement of false information in the state information system of housing and communal services, set out in the joint appeal of the Ministry of Labor and Social Protection of the Russian Federation and the Ministry of Construction and Housing and Communal Services of the Russian Federation No. A1-10418 dated 03.12.2020, order of the Deputy Minister of Construction and Housing and Communal Services Ministry of Agriculture of the Russian Federation - Chief State Housing Inspector of the Russian Federation Egorov M.B. No. 193/pr dated 30.03.202, based on a submission dated 05/10/2021. .prevention, detection and suppression of violations of mandatory requirements of housing legislation. .Compliance with mandatory requirements for the placement of information in the state information system of housing and communal services
# 142005285701
Unscheduled inspection
Start date: 2020-12-25, end date: 2020-12-31, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: 1 compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation According to the inspection program
# 142005303019
Unscheduled inspection
Start date: 2020-12-25, end date: 2021-01-18, duration: 11
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: inspections in connection with the notification exx 2017 dated December 09, 2020 bx 9306 dated December 09, 2020 and the request for inspection bx9394 dated December 14, 2020 received by the Department of State Construction and Housing Supervision of the Republic of Sakha Yakutia and the request for inspection bx9394 dated December 14, 2020 for the actual elimination of previously identified violations during the construction of the capital construction facility prescribed for elimination by regulation 040862520 dated September 28, 2020 year
# 142005303003
Unscheduled inspection
Start date: 2020-12-10, end date: 2020-12-30, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: inspections in connection with notification 1962 received by the Department of State Construction and Housing Supervision of the Republic of Sakha Yakutia dated November 30, 2020 bx 8963 dated November 30, 2020 a compliance of the constructed capital construction facility with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used b elimination by the developer technical customer the person carrying out the construction identified during the construction control and state construction supervision of all violations of the compliance of the work performed with the requirements of regulatory legal acts and project documentation in the execution of executive documentation related to the performance of all construction work as well as the use of building materials and products
# 142005234297
Unscheduled inspection
Start date: 2020-11-20, end date: 2020-12-03, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 142005209267
Unscheduled inspection
Start date: 2020-10-19, end date: 2020-10-30, duration: 10
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Respublike Saha YAkutiya
Purpose of inspection: conducting an inspection on the execution of the order dated 15072019 144 at the request of JSC Domostroitelny Kombinat
# 142005160259
Unscheduled inspection
Start date: 2020-10-08, end date: 2020-10-21, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: 1 compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation, including including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 the availability of a construction permit 3 the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation as prescribed
# 142005160255
Unscheduled inspection
Start date: 2020-10-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 142004514271
Unscheduled inspection
Start date: 2020-08-26, end date: 2020-09-22, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 142004472626
Unscheduled inspection
Start date: 2020-08-04, end date: 2020-08-13, duration: 1
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 142004478872
Unscheduled inspection
Start date: 2020-08-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 142004498786
Unscheduled inspection
Start date: 2020-08-20, end date: 2020-09-16, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Respublike Saha YAkutiya
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms
# 142004705784
Unscheduled inspection
Start date: 2020-08-31, end date: 2020-09-26, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 142004443206
Unscheduled inspection
Start date: 2020-07-06, end date: 2020-07-17, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 142004469884
Unscheduled inspection
Start date: 2020-07-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 142004454618
Unscheduled inspection
Start date: 2020-07-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 142004469889
Unscheduled inspection
Start date: 2020-07-30, end date: 2020-08-10, duration: 8
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 142004469887
Unscheduled inspection
Start date: 2020-07-30, end date: 2020-08-10, duration: 8
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 142004429223
Unscheduled inspection
Start date: 2020-06-09, end date: 2020-07-10, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The subject of the inspection is an inspection in accordance with the inspection program approved by the head of the State Construction and Housing Supervision Department of the Republic of Sakha Yakutia on October 29, 2019. During the construction of a capital construction facility, the developer, the technical customer, the person carrying out the construction, meets the mandatory requirements in the field of construction and the applied building materials and products of the established procedure for the construction and reconstruction of a capital construction facility 1 compliance with the performance of work and the applied building materials during the construction of the reconstruction of the capital construction facility as well as the results of such work, the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of the requirements of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 142004423652
Unscheduled inspection
Start date: 2020-06-01, end date: 2020-06-10, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: redemptionthe detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, The subject of this audit is1 compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit3compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction and reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or the technical customer on the basis of a contract of an individual or a legal entity
# 142004419265
Unscheduled inspection
Start date: 2020-05-29, end date: 2020-06-11, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 142004385894
Unscheduled inspection
Start date: 2020-03-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 142004331444
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-03-16, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: inspections in connection with notification 283 received by the Department of State Construction and Housing Supervision of the Republic of Sakha Yakutia dated February 14, 2020 bx 1570 dated 26022020 of the actual elimination of previously identified violations during the construction of the capital construction facility, prescribed for elimination by instruction 0408126819 dated December 27, 2019 1 compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility construction as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of the information model are mandatory in accordance with with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 142004357791
Unscheduled inspection
Start date: 2020-03-17, end date: 2020-03-19, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: inspections in accordance with the inspection program approved by the head of the Department of State Construction and Housing Supervision of the Republic of Sakha Yakutia on January 09, 2020, during the construction of a capital construction facility, the developer, the technical customer, the person carrying out the construction, meets the mandatory requirements in the field of construction and the applied building materials and products of the established procedure for the construction and reconstruction of a capital construction facility. The objectives of this audit are to prevent, identify and prevent violations committed by the developer the technical customer as well as the person carrying out construction on the basis of a contract with the developer or the customer hereinafter referred to as the contractor for violations of legislation on urban planning activities, including project documentation, the purpose of this audit is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 142004254126
Unscheduled inspection
Start date: 2020-02-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 141904073573
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-27, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 141904106311
Unscheduled inspection
Start date: 2019-12-18, end date: 2019-12-27, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: inspections in accordance with the inspection program approved by the head of the Department of State Construction and Housing Supervision of the Republic of Sakha Yakutia on October 29, 2019, during the construction of a capital construction facility, the developer, the technical customer, the person carrying out the construction, meets the mandatory requirements in the field of construction and the applied building materials and products of the established procedure for the construction and reconstruction of a capital construction facility. The objectives of this inspection are to prevent, identify and prevent technical violations committed by the developer. by the customer as well as by the person carrying out construction on the basis of a contract with the developer or the customer hereinafter referred to as the contractor for violations of legislation on urban planning activities, including project documentation
# 141903940325
Unscheduled inspection
Start date: 2019-11-06, end date: 2019-12-03, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Saha YAkutiya
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms
# 141904030578
Unscheduled inspection
Start date: 2019-11-29, end date: 2019-12-26, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this audit is 1. the conformity of the work and the construction materials used during the construction and reconstruction of the capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, 2 the availability of a construction permit, 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation, the availability of a certificate of admission to construction and reconstruction works that affect the safety of capital construction facilities, including certificates on admission to work on the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or a legal entity
# 141904164831
Unscheduled inspection
Start date: 2019-11-19, end date: 2019-11-25, duration: —
Authority: Lenskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: fulfillment of a previously issued prescription
# 141903955097
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-12-13, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this audit is 1. the conformity of the work and the construction materials used during the construction and reconstruction of the capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, 2 the availability of a construction permit, 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation, the availability of a certificate of admission to construction and reconstruction works that affect the safety of capital construction facilities, including certificates on admission to work on the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or a legal entity
# 141903871109
Unscheduled inspection
Start date: 2019-10-24, end date: 2019-11-04, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: inspections in accordance with the inspection program approved by the head of the Department of State Construction and Housing Supervision of the Republic of Sakha Yakutia on July 10, 2019, during the construction of a capital construction facility, the developer, the technical customer, the person carrying out the construction, meets the mandatory requirements in the field of construction and the applied building materials and products of the established procedure for the construction and reconstruction of a capital construction facility. The objectives of this inspection are to prevent, identify and prevent violations committed by the developer the technical customer as well as the person carrying out construction on the basis of a contract with the developer or the customer hereinafter referred to as the contractor for violations of legislation on urban planning activities, including project documentation, the purpose of this audit is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 141903871098
Unscheduled inspection
Start date: 2019-10-24, end date: 2019-11-04, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: inspections in accordance with the inspection program approved by the head of the Department of State Construction and Housing Supervision of the Republic of Sakha Yakutia on July 10, 2019, during the construction of a capital construction facility, the developer, the technical customer, the person carrying out the construction, meets the mandatory requirements in the field of construction and the applied building materials and products of the established procedure for the construction and reconstruction of a capital construction facility. The objectives of this inspection are to prevent, identify and prevent violations committed by the developer the technical customer as well as the person carrying out construction on the basis of a contract with the developer or the customer hereinafter referred to as the contractor for violations of legislation on urban planning activities, including project documentation, the purpose of this audit is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 141903821767
Unscheduled inspection
Start date: 2019-10-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 141903168017
Unscheduled inspection
Start date: 2019-09-10, end date: 2019-09-18, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this audit is 1. the conformity of the work and the construction materials used during the construction and reconstruction of the capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, 2 the availability of a construction permit, 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation, the availability of a certificate of admission to construction and reconstruction works that affect the safety of capital construction facilities, including certificates on admission to work on the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or a legal entity
# 141904175691
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-09-27, duration: —
Authority: Lenskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with regulation P447 of 29072019
# 141903694352
Unscheduled inspection
Start date: 2019-09-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 141903395382
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-10-07, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Saha YAkutiya
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms
# 141902937490
Unscheduled inspection
Start date: 2019-08-12, end date: 2019-08-21, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 141902937897
Unscheduled inspection
Start date: 2019-08-13, end date: 2019-08-22, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this audit is 1. the conformity of the work and the construction materials used during the construction and reconstruction of the capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, 2 the availability of a construction permit, 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation, the availability of a certificate of admission to construction and reconstruction works that affect the safety of capital construction facilities, including certificates on admission to work on the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or a legal entity
# 141902963763
Unscheduled inspection
Start date: 2019-08-22, end date: 2019-09-02, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: inspections in accordance with the inspection program approved by the head of the Department of State Construction and Housing Supervision of the Republic of Sakha Yakutia on July 10, 2019, during the construction of a capital construction facility, the developer, the technical customer, the person carrying out the construction, meets the mandatory requirements in the field of construction and the applied building materials and products of the established procedure for the construction and reconstruction of a capital construction facility. The objectives of this inspection are to prevent, identify and prevent violations committed by the developer the technical customer as well as the person carrying out construction on the basis of a contract with the developer or the customer hereinafter referred to as the contractor for violations of legislation on urban planning activities, including project documentation, the purpose of this audit is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 141902963752
Unscheduled inspection
Start date: 2019-08-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 141902966952
Unscheduled inspection
Start date: 2019-08-20, end date: 2019-08-26, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 141902867175
Unscheduled inspection
Start date: 2019-07-12, end date: 2019-07-19, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this audit is 1. the conformity of the work and the construction materials used during the construction and reconstruction of the capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, 2 the availability of a construction permit, 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation, the availability of a certificate of admission to construction and reconstruction works that affect the safety of capital construction facilities, including certificates on admission to work on the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or a legal entity
# 141902843951
Unscheduled inspection
Start date: 2019-07-10, end date: 2019-07-19, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 31 6 of Article 52 of the Urban Planning Code of the Russian Federation
# 141902877106
Unscheduled inspection
Start date: 2019-07-11, end date: 2019-08-08, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Saha YAkutiya
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms
# 141902870797
Unscheduled inspection
Start date: 2019-07-16, end date: 2019-07-24, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 141902870974
Unscheduled inspection
Start date: 2019-07-01, end date: 2019-07-10, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 31 6 of Article 52 of the Urban Planning Code of the Russian Federation
# 141903905400
Unscheduled inspection
Start date: 2019-07-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 141902823309
Unscheduled inspection
Start date: 2019-06-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 141902823385
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-06-20, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 the compliance of the work and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction and reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in the case of involvement by the developer or the technical customer on the basis of a contract of an individual or a legal entity.
# 141902765399
Unscheduled inspection
Start date: 2019-06-18, end date: 2019-06-28, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: verification of the completed facility 1 Compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources 2 availability of a construction permit
# 141902765432
Unscheduled inspection
Start date: 2019-06-18, end date: 2019-06-28, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: 1 compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements of equipping the capital construction facility with metering devices for energy resources used 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 31 6 of Article 52 of the Urban Planning Code of the Russian Federation
# 141902799339
Unscheduled inspection
Start date: 2019-06-20, end date: 2019-06-28, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this audit is 1. the conformity of the work and the construction materials used during the construction and reconstruction of the capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, 2 the availability of a construction permit, 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation, the availability of a certificate of admission to construction and reconstruction works that affect the safety of capital construction facilities, including certificates on admission to work on the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or a legal entity
# 141902763130
Unscheduled inspection
Start date: 2019-06-05, end date: 2019-06-17, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: inspections in accordance with the inspection program approved by the head of the Department of State Construction and Housing Supervision of the Republic of Sakha Yakutia on May 24, 2019. compliance with the mandatory requirements in the field of construction and applied building materials and products of the established procedure for the construction and reconstruction of the capital construction facility during the construction of the developer, the technical customer, the person carrying out the construction, the established procedure for the construction and reconstruction of the capital construction facility. The objectives of this inspection are to prevent, identify and prevent violations committed by the developer the technical customer as well as the person carrying out construction on the basis of a contract with the developer or the customer hereinafter referred to as the contractor for violations of legislation on urban planning activities, including project documentation, the purpose of this audit is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 141902672102
Unscheduled inspection
Start date: 2019-05-13, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:
# 141902765423
Unscheduled inspection
Start date: 2019-05-23, end date: 2019-06-20, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: verification of the completed facility 1 Compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources 2 availability of a construction permit
# 141902723489
Unscheduled inspection
Start date: 2019-05-23, end date: 2019-05-31, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: This inspection is carried out in order to verify in accordance with the inspection program approved by the head of the Department of State Construction and Housing Supervision of the Republic of Sakha Yakutia on September 20, 2018, compliance with the mandatory requirements in the field of construction and applied building materials and products of the established procedure for construction and reconstruction of the capital construction facility during the construction of the developer, the technical customer, the person carrying out the construction, the established procedure for the construction and reconstruction of the capital construction facility. The objectives of this inspection are to prevent identification and suppression of violations of the legislation on urban planning activities, including project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, the purpose of this audit is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 141902713042
Unscheduled inspection
Start date: 2019-05-23, end date: 2019-06-03, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this audit is 1. the conformity of the work and the construction materials used during the construction and reconstruction of the capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, 2 the availability of a construction permit, 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation, the availability of a certificate of admission to construction and reconstruction works that affect the safety of capital construction facilities, including certificates on admission to work on the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or a legal entity
# 141902678511
Unscheduled inspection
Start date: 2019-04-30, end date: 2019-05-16, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: inspections in connection with Notification 720 received by the Department of State Construction and Housing Supervision of the Republic of Sakha Yakutia dated April 10, 2019, bx3326 dated April 11, 2019, of the actual elimination of previously identified violations during the construction of a capital construction facility, prescribed for elimination by regulation 04088619 dated March 12, 2019, the objectives of this audit are to prevent identify and suppress violations committed by the developer and technical customer as well as by a person carrying out construction on the basis of a contract with a developer or customer hereinafter referred to as the contractor for violations of legislation on urban planning activities, including project documentation, the subject of this audit is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts.
# 141902645978
Unscheduled inspection
Start date: 2019-04-18, end date: 2019-04-26, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 the compliance of the work and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction and reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in the case of involvement by the developer or the technical customer on the basis of a contract of an individual or a legal entity.
# 141902681826
Unscheduled inspection
Start date: 2019-04-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 141902675438
Unscheduled inspection
Start date: 2019-04-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 141902560686
Unscheduled inspection
Start date: 2019-03-11, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:
# 141902560586
Unscheduled inspection
Start date: 2019-03-11, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:
# 141902560560
Unscheduled inspection
Start date: 2019-03-11, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:
# 141902540582
Unscheduled inspection
Start date: 2019-03-01, end date: 2019-03-12, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: inspections in accordance with the inspection program approved by the head of the Department of State Construction and Housing Supervision of the Republic of Sakha Yakutia on September 20, 2018. compliance with the mandatory requirements in the field of construction and applied building materials and products of the established procedure for the construction and reconstruction of the capital construction facility during the construction of the developer, the technical customer, the person carrying out the construction, the established procedure for the construction and reconstruction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations committed by the developer the technical customer as well as the person carrying out construction on the basis of a contract with the developer or the customer hereinafter referred to as the contractor for violations of legislation on urban planning activities, including project documentation, the subject of this audit is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 141902713038
Unscheduled inspection
Start date: 2019-02-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 141902511559
Unscheduled inspection
Start date: 2019-02-18, end date: 2019-02-25, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: the objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process of reconstruction of the capital construction facility and the results of such work meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including certificates on admission to work on the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 141903923289
Unscheduled inspection
Start date: 2019-01-23, end date: 2019-01-24, duration: —
Authority: Lenskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with requirements in the field of industrial safety and verification of compliance with regulations of state control and supervision bodies
# 141802209901
Unscheduled inspection
Start date: 2018-12-12, end date: 2018-12-20, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities, including technical regulations and design documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements technical regulations of project documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 141802307229
Unscheduled inspection
Start date: 2018-12-19, end date: 2018-12-27, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: the objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process of reconstruction of the capital construction facility and the results of such work meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including certificates on admission to work on the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 141802144431
Unscheduled inspection
Start date: 2018-11-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 141802151916
Unscheduled inspection
Start date: 2018-11-28, end date: 2018-12-25, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities, including technical regulations and design documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements technical regulations of project documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 141802156593
Unscheduled inspection
Start date: 2018-11-29, end date: 2018-12-12, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities, including technical regulations and design documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements technical regulations of project documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 141802085127
Unscheduled inspection
Start date: 2018-11-16, end date: 2018-11-27, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: the objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process of reconstruction of the capital construction facility and the results of such work meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including certificates on admission to work on the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 141802085186
Unscheduled inspection
Start date: 2018-11-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 141802085166
Unscheduled inspection
Start date: 2018-11-16, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:
# 141801923225
Unscheduled inspection
Start date: 2018-10-24, end date: 2018-11-02, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 31 6 of Article 52 of the Urban Planning Code of the Russian Federation
# 141802022625
Unscheduled inspection
Start date: 2018-10-30, end date: 2018-11-07, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities, including technical regulations and design documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements technical regulations of project documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 141802141154
Unscheduled inspection
Start date: 2018-10-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 141801904009
Unscheduled inspection
Start date: 2018-10-11, end date: 2018-10-16, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities, including technical regulations and design documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements technical regulations of project documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 141801923219
Unscheduled inspection
Start date: 2018-10-18, end date: 2018-10-29, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 31 6 of Article 52 of the Urban Planning Code of the Russian Federation
# 141801602316
Unscheduled inspection
Start date: 2018-09-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 141801655269
Unscheduled inspection
Start date: 2018-09-27, end date: 2018-10-04, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 the compliance of the work and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction and reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in the case of involvement by the developer or the technical customer on the basis of a contract of an individual or a legal entity.
# 141801502731
Unscheduled inspection
Start date: 2018-09-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 141800615189
Unscheduled inspection
Start date: 2018-08-10, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:
# 141800600098
Unscheduled inspection
Start date: 2018-08-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 141801279883
Unscheduled inspection
Start date: 2018-08-09, end date: 2018-09-06, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Saha YAkutiya
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing norms of labor law
# 141800651601
Unscheduled inspection
Start date: 2018-08-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 141800683934
Unscheduled inspection
Start date: 2018-08-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 141800683931
Unscheduled inspection
Start date: 2018-08-23, end date: 2018-09-01, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 31 6 of Article 52 of the Urban Planning Code of the Russian Federation
# 141800683924
Unscheduled inspection
Start date: 2018-08-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 141800683940
Unscheduled inspection
Start date: 2018-08-23, end date: 2018-09-01, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 31 6 of Article 52 of the Urban Planning Code of the Russian Federation
# 141800506850
Unscheduled inspection
Start date: 2018-07-06, end date: 2018-07-13, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities, including technical regulations and design documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements technical regulations of project documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 141800506841
Unscheduled inspection
Start date: 2018-07-06, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: