# 782005205947
Unscheduled inspection
Start date: 2020-11-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782004414224
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-06-22, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po g SanktPeterburgu
Purpose of inspection: This inspection is carried out in order to control the elimination of violations of fire safety requirements specified in the regulation on the elimination of identified violations of fire safety requirements dated 05042019 22518011, the deadline for which has expired on 01042020the objectives of this inspection are to identify, suppress and prevent possible violations of fire safety requirements and carry out systematic monitoring of compliance with fire safety requirements 7 The subject of this inspection is compliance with fire safety requirements at the protection facility used and operated by the organization in the course of its activities
# 781903612174
Unscheduled inspection
Start date: 2019-09-30, end date: 2019-11-20, duration: —
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy SanktPeterburga
Purpose of inspection: determination of compliance of the constructed capital construction facility with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources compliance with the requirements of h2 h 3 h 31 Art 54 of the Urban Planning Code The objectives of this audit are to prevent as well as identify and suppress violations of compliance committed by the developer customer the person carrying out construction on the basis of a contract with the developer or the customer work performed during the construction and reconstruction of capital construction facilities to the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this audit is to verify that the completed construction of the capital construction facility meets the requirements of the project documentation, including the requirements of fire prevention measures to ensure the sanitary and epidemiological welfare of the population, environmental protection, energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for the energy used resources
# 781902562457
Unscheduled inspection
Start date: 2019-03-11, end date: 2019-04-05, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po g SanktPeterburgu
Purpose of inspection: This inspection is carried out in order to control the elimination of violations of fire safety requirements specified in the regulation on the elimination of identified violations of fire safety requirements dated 15.012018 22577511, the deadline for which expired before 15.012019. The objectives of this inspection are to identify, suppress and prevent possible violations of fire safety requirements and carry out systematic monitoring of compliance with fire safety requirements. The subject of this inspection is compliance with fire safety requirements. security at the protection facility used and operated by the organization in the course of its activities
# 78170802975925
Unscheduled inspection
Start date: 2017-12-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 78160701151569
Unscheduled inspection
Start date: 2016-11-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 78150601178375
Unscheduled inspection
Start date: 2015-09-23, end date: —, duration: —
Authority: —
Purpose of inspection: