Found 115 inspections:

# 002004429106
Unscheduled inspection
Start date: 2020-07-06, end date: —, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001903606053
Unscheduled inspection
Start date: 2019-09-30, end date: 2019-10-25, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out within the framework of state construction supervision during the construction reconstruction and major repairs of facilities specified in paragraph 51 of Article 6 of the Urban Planning Code of the Russian Federation, with the exception of facilities for which state construction supervision is entrusted by decrees of the President of the Russian Federation to other federal executive authorities registry 10001515438 in connection with the notification received from 10092019 bn vx 78236 dated 10092019 from the developer on the completion of the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of urban planning legislation by the developer, including technical regulations and project documentationthe subject of this audit is 1 to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources


# 001902773147
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-07-08, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the law on urban development, including technical regulations and project documentation committed by the person carrying out the construction. The subject of this audit is The purpose of this work is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used.


# 001902507651
Unscheduled inspection
Start date: 2019-02-14, end date: —, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001902507661
Unscheduled inspection
Start date: 2019-02-14, end date: 2019-03-14, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the person carrying out construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001902217983
Unscheduled inspection
Start date: 2019-01-14, end date: 2019-02-08, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the person carrying out construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001802032081
Unscheduled inspection
Start date: 2018-11-12, end date: 2018-12-07, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out within the framework of state construction supervision during the construction reconstruction and major repairs of facilities specified in paragraph 51 of Article 6 of the Urban Planning Code of the Russian Federation, with the exception of facilities for which state construction supervision is entrusted by decrees of the President of the Russian Federation to other federal executive authorities registry 10001515438 in connection with the notification received from 22102018 bn vx 77776 dated 23102018 The objectives of this audit are to prevent identify and suppress violations of the legislation on urban planning activities by the developer, including technical regulations and project documentation. The subject of this audit is 1 to verify that the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, comply with the requirements of technical regulations and project documentation This includes energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources.


# 001801338573
Unscheduled inspection
Start date: 2018-10-01, end date: —, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001800582167
Unscheduled inspection
Start date: 2018-08-06, end date: —, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001800467145
Unscheduled inspection
Start date: 2018-07-02, end date: —, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001800467142
Unscheduled inspection
Start date: 2018-07-02, end date: 2018-07-27, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the person carrying out construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 00160700060285
Unscheduled inspection
Start date: 2016-07-19, end date: —, duration:
Authority: Upravlenie gosudarstvennogo aviacionnogo nadzora i nadzora za obespecheniem transportnoi bezopasnosti po Sibirskomu federalnomu okrugu Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: Implementation of state control and supervision over compliance with the requirements of the legislation of the Russian Federation on ensuring transport safety on the basis of p1h2 art. 10 of the Federal Law of 26122008 294FZ and municipal control in connection with the expiration of the previously issued regulation 91192P47 of 04082014 the deadline for execution expired on June 01, 2016The task is to carry out supervision measures regarding the fulfillment of the mandatory requirements of the Federal State Budgetary Institution Baikalpravavtodor legislation of the Russian Federation on ensuring transport security


# 00150601400090
Unscheduled inspection
Start date: 2015-11-23, end date: —, duration:
Authority: Eniseiskoe territorialnoe upravlenie Federalnogo agentstva po rybolovstvu
Purpose of inspection:


# 00150600093881
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093876
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093950
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093874
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093872
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093863
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093946
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093941
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093938
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093857
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093832
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093890
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093888
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093908
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093906
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093897
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093921
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093911
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093893
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 242100073188
Unscheduled inspection
Start date: 2021-03-17, end date: 2021-03-30, duration: 10
Authority: Sibirskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: To establish that this inspection is carried out with the aim of: fulfilling the instructions issued by the territorial Department of State Highway Supervision in the Republic of Tyva of the Siberian Interregional Directorate of State Highway Supervision No. 10 dated 02.26.2021 on the elimination of identified violations of regulatory legal and regulatory technical requirements governing the activities of the road industry. The deadline for the execution of regulations is 03/15/2021. The objectives of this audit are: the implementation of federal state transport supervision over the compliance of a legal entity with regulatory legal and regulatory technical acts regulating activities in the field of road management. 7. The subject of this audit is: measures taken by a legal entity to comply with the requirements of the regulations on the elimination of identified violations of the requirements of normative legal and regulatory technical acts regulating activities in the field of road management.


# 242100092508
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-23, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out for the purpose of carrying out state construction supervision during the reconstruction of the specified capital construction facility, in connection with the timing of completion of works that are subject to verification in accordance with the approved program of inspections during the reconstruction of the capital construction facility. The purpose of this audit is to prevent and suppress violations of legislation on urban planning activities and the requirements of project documentation. The subject of this review is: Verification of compliance of the work performed and the construction materials used during the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; Checking for a building permit; Verification of compliance with the requirements established by Parts 2, 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002005223553
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-12-11, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted for the purpose of state construction supervision during the reconstruction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of inspections during the reconstruction of the capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development and project documentation by the developer. The purpose of this audit is to verify compliance with the implementation of works and construction materials used during the reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the availability of a construction permit, verification of compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation dated 29122004 190FZ


# 002005237229
Unscheduled inspection
Start date: 2020-11-23, end date: 2020-12-18, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out for the purpose of 1 Carrying out state construction supervision during the construction of the specified capital construction facility in connection with the notification received bn dated 10112020 bx 36141267 dated 10112020 from the developer on the completion of the construction of the capital construction facility 2 The purpose of this inspection is to prevent and suppress violations of legislation on urban development and the requirements of project documentation. The purpose of this inspection is 1 To verify the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with energy metering devices.2 Verification of the availability of a construction permit.3 Verification of compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 242004470153
Unscheduled inspection
Start date: 2020-07-28, end date: 2020-08-07, duration: 9
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted for the purpose of state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility. The purpose of this audit is to prevent and suppress violations of legislation on urban development activities, as well as the requirements of project documentation. The purpose of this audit is to verify the compliance of work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, Verification of the availability of a construction permit, Verification of compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation dated 29122004 190FZ


# 002004429106
Unscheduled inspection
Start date: 2020-07-06, end date: 2020-07-31, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted for the purpose of state construction supervision during the reconstruction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of inspections during the reconstruction of the capital construction facility.The purpose of this audit is to verify the compliance of the work and the construction materials used during the reconstruction of the capital construction facility, as well as the results of such work with the requirements project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources Verification of a construction permit Verification of compliance with the requirements set out in Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation dated 29122004 190FZ


# 002004435535
Unscheduled inspection
Start date: 2020-06-17, end date: 2020-07-10, duration: 16
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out in order to carry out state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility, the subject of this inspection is to verify the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such inspections the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, Verification of the availability of a construction permit, verification of compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation dated 29122004 190 FZ


# 002004354287
Unscheduled inspection
Start date: 2020-03-12, end date: 2020-04-08, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the person carrying out the construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used


# 001904003352
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-27, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out within the framework of state construction supervision during the construction reconstruction and major repairs of facilities specified in paragraph 51 of Article 6 of the Urban Planning Code of the Russian Federation, with the exception of facilities for which state construction supervision is entrusted by decrees of the President of the Russian Federation to other federal executive authorities registry 10001515438 in connection with the notification received from 13112019 035378 bx 100983 dated 13112019 from the developer on the completion of the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development by the developer, including technical regulations and project documentationthe subject of this audit is 1 to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources


# 001903921458
Unscheduled inspection
Start date: 2019-11-05, end date: 2019-11-29, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates, which are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility, the objectives of this audit are to prevent identify and suppress violations of the legislation of fencing activities by the person carrying out construction, including technical regulations and design documentation. The subject of this audit is to verify the compliance of work and applicable building materials during the construction of the capital construction facility as well as the results of such work, the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used


# 001903606053
Unscheduled inspection
Start date: 2019-09-30, end date: 2019-10-25, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out within the framework of state construction supervision during the construction reconstruction and major repairs of facilities specified in paragraph 51 of Article 6 of the Urban Planning Code of the Russian Federation, with the exception of facilities for which state construction supervision is entrusted by decrees of the President of the Russian Federation to other federal executive authorities registry 10001515438 in connection with the notification received from 10092019 bn vx 78236 dated 10092019 from the developer on the completion of the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of urban planning legislation by the developer, including technical regulations and project documentationthe subject of this audit is 1 to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources


# 001903222016
Unscheduled inspection
Start date: 2019-08-26, end date: 2019-09-06, duration: 10
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the implementation of the measures provided for in paragraphs of the previously issued to the person being audited order dated 18012019 09005C on the elimination of identified violations of mandatory requirements, the deadline for which expired on 310-52019the purpose of this audit is to establish the elimination of previously identified violations within the time period established by the order dated 18012019 09005C6THE subject of this audit is to verify the implementation of the order of the state construction supervision authority dated 18012019 09005C


# 191902854143
Unscheduled inspection
Start date: 2019-07-15, end date: 2019-07-17, duration:
Authority: Sibirskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: Checking the fulfillment of the prescription


# 171902937124
Unscheduled inspection
Start date: 2019-07-25, end date: —, duration:
Authority:
Purpose of inspection:


# 001902842795
Unscheduled inspection
Start date: 2019-07-08, end date: 2019-08-02, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the law on urban development, including technical regulations and project documentation committed by the person carrying out the construction. The subject of this audit is The purpose of this work is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used.


# 001902842786
Unscheduled inspection
Start date: 2019-07-08, end date: 2019-08-02, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the law on urban development, including technical regulations and project documentation committed by the person carrying out the construction. The subject of this audit is The purpose of this work is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used.


# 001902773047
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-07-08, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the law on urban development, including technical regulations and project documentation committed by the person carrying out the construction. The subject of this audit is The purpose of this work is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used.


# 001902773147
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-07-08, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the law on urban development, including technical regulations and project documentation committed by the person carrying out the construction. The subject of this audit is The purpose of this work is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used.


# 241902823352
Unscheduled inspection
Start date: 2019-06-24, end date: 2019-07-12, duration:
Authority: Sibirskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: The audit is carried out in order to verify the fulfillment by a legal entity of the order issued by the Siberian Interregional Directorate of State Highway Supervision of the Federal Service for Supervision of Transport dated 29052019 72DH on the elimination of identified violations of regulatory legal and regulatory technical requirements governing the activities of the road industry The deadline for the execution of the order is 17062019the objectives of this audit are the implementation of federal state transport supervision over the legal entity's compliance with regulatory legal and regulatory requirements. regulatory technical acts regulating activities in the field of road management The subject of this audit is the measures taken by a legal entity to comply with the requirements of regulations on the elimination of identified violations of the requirements of regulatory legal and regulatory technical acts regulating activities in the field of road management


# 001902507651
Unscheduled inspection
Start date: 2019-02-14, end date: 2019-03-14, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the person carrying out construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001902507661
Unscheduled inspection
Start date: 2019-02-14, end date: 2019-03-14, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the person carrying out construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001902217983
Unscheduled inspection
Start date: 2019-01-14, end date: 2019-02-08, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the person carrying out construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 241902435886
Unscheduled inspection
Start date: 2019-01-16, end date: 2019-02-12, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Krasnoyarskomu krayu
Purpose of inspection: control over the execution of a previously issued prescription


# 001802032081
Unscheduled inspection
Start date: 2018-11-12, end date: 2018-12-07, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out within the framework of state construction supervision during the construction reconstruction and major repairs of facilities specified in paragraph 51 of Article 6 of the Urban Planning Code of the Russian Federation, with the exception of facilities for which state construction supervision is entrusted by decrees of the President of the Russian Federation to other federal executive authorities registry 10001515438 in connection with the notification received from 22102018 bn vx 77776 dated 23102018 The objectives of this audit are to prevent identify and suppress violations of the legislation on urban planning activities by the developer, including technical regulations and project documentation. The subject of this audit is 1 to verify that the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, comply with the requirements of technical regulations and project documentation This includes energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources.


# 241802010797
Unscheduled inspection
Start date: 2018-10-22, end date: 2018-11-19, duration:
Authority: Sibirskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: Verification of the execution of the regulation dated 29062018 209 Tasks of the verificationthe implementation of the federal state transport supervision in the field of automobile and urban land electric transport for compliance by legal entities and individual entrepreneurs with the requirements of regulatory legal and regulatory technical acts regulating the activities of the transport complex Subject of the verificationthe information contained in the documents on the measures taken to comply with the regulations on the elimination of identified violations of mandatory requirements


# 001801338573
Unscheduled inspection
Start date: 2018-10-01, end date: 2018-10-12, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the fulfillment of the instruction previously issued to the person being checked dated 31082018 095251C on the elimination of previously identified violations, the deadline for which expires on 28092018 The task of the audit is to establish the fact of elimination of previously identified violations specified in the instruction dated 31082018 095251C The subject of this audit is the fulfillment of the instruction of the state construction supervision authority dated 31082018 095251C


# 191801780913
Unscheduled inspection
Start date: 2018-10-02, end date: 2018-10-08, duration:
Authority: Sibirskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: Checking the fulfillment of the prescription


# 001801930896
Unscheduled inspection
Start date: 2018-10-29, end date: 2018-11-26, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision during the construction of a capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program for inspections during the construction of capital construction facilities The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer, including technical regulations and project documentation


# 241801911149
Unscheduled inspection
Start date: 2018-10-15, end date: 2018-11-09, duration:
Authority: Sibirskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: Verification of the fulfillment of the regulation dated 04092018 240 Tasks of verification of the federal state transport supervision in the field of automobile and urban land electric transport for compliance by legal entities and individual entrepreneurs with the requirements of regulatory legal and regulatory technical acts regulating the activities of the transport complex Subject of verification information contained in the documents on the measures taken to comply with the regulations on the elimination of identified violations of mandatory requirements


# 241801541219
Unscheduled inspection
Start date: 2018-09-10, end date: 2018-10-05, duration:
Authority: Sibirskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: The objectives of verifying the fulfillment by a legal entity of Regulation 229 issued on 16082018 by the Siberian MUGADN on the elimination of identified violations of regulatory legal and regulatory technical requirements governing the activities of the transport complex The deadline for the fulfillment of the regulation paragraph 1 to 06092018 paragraph 2 to 21082018 paragraphs 3 and 4 to 26082018 The objectives of this audit is the implementation of federal state transport supervision over the legal entity's compliance with regulatory legal acts The subject of this audit is the measures taken by a legal entity to comply with the requirements of the regulation on the elimination of identified violations of the requirements of regulatory legal and regulatory technical acts regulating activities in the field of road management


# 171802137874
Unscheduled inspection
Start date: 2018-09-24, end date: 2018-09-28, duration:
Authority: Sibirskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: To establish that this inspection is carried out in order for a legal entity to comply with the order issued by the territorial Department of State Highway Supervision in the Republic of Tyva of the Siberian Interregional Directorate of State Highway Supervision No. 31072018 22 on the elimination of identified violations of regulatory legal and regulatory technical requirements governing the activities of the road industry Deadline for the execution of the order 07092018 The objectives of this inspection are to carry out federal state transport supervision of compliance by the legal entity regulatory legal and regulatory technical acts regulating activities in the field of road management The subject of this audit is the measures taken by a legal entity to comply with the requirements of regulations on the elimination of identified violations of the requirements of regulatory legal and regulatory technical acts regulating activities in the field of road management


# 241800954513
Unscheduled inspection
Start date: 2018-08-27, end date: —, duration:
Authority:
Purpose of inspection:


# 001800582167
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-31, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the person carrying out construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 241800612459
Unscheduled inspection
Start date: 2018-08-09, end date: 2018-09-05, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 101 dated 02082018 on the completion dates of works subject to inspection during the construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation. 7 The subject of this inspection is 71 Checking the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used 72 Meeting the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking for a building permit


# 241800660254
Unscheduled inspection
Start date: 2018-08-24, end date: 2018-09-20, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 134 dated 15082018 on the completion of the construction of the capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities, including technical regulations and project documentation. 7 The subject of this audit is 71 Verification of compliance with all acts prescriptions notices on the elimination of violations deficiencies identified during the implementation of regional state construction supervision 72 are subject to verification in accordance with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Verification of the availability of a building permit


# 241800545120
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-08-03, duration:
Authority: Sibirskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: Verification of the fulfillment of the instruction from 260218 61 Tasks of the audit implementation of federal state transport supervision in the field of automobile and urban land electric transport for compliance by legal entities and individual entrepreneurs with the requirements of regulatory legal and regulatory technical acts regulating the activities of the transport complex Subject of verification information contained in the documents on the measures taken to comply with the regulations and taken by the legal entity as an individual entrepreneur in the course of its activities measures to comply with the requirements of the regulations on the elimination of identified violations of mandatory requirements established by international treaties of the Russian Federation and the legislation of the Russian Federation in the field of transport


# 171800571574
Unscheduled inspection
Start date: 2018-07-23, end date: 2018-07-31, duration:
Authority: Sibirskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: To establish that this inspection is carried out in order for a legal entity to comply with the order issued by the territorial Department of State Highway Supervision in the Republic of Tyva of the Siberian Interregional Directorate of State Highway Supervision dated 14052018 15 on the elimination of identified violations of regulatory legal and regulatory technical requirements governing the activities of the road industry Deadline for the execution of the order 14062018 The objectives of this inspection are to carry out federal state transport supervision of compliance by the legal entity regulatory legal and regulatory technical acts regulating activities in the field of road management The subject of this audit is the measures taken by a legal entity to comply with the requirements of regulations to eliminate identified violations of the requirements of regulatory legal and regulatory technical acts regulating activities in the field of road management


# 241800499699
Unscheduled inspection
Start date: 2018-07-02, end date: 2018-07-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 26072017 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 001800467145
Unscheduled inspection
Start date: 2018-07-02, end date: 2018-07-27, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the person carrying out construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001800467142
Unscheduled inspection
Start date: 2018-07-02, end date: 2018-07-27, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the person carrying out construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 241800490601
Unscheduled inspection
Start date: 2018-06-21, end date: 2018-07-10, duration:
Authority: Sibirskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: This inspection is carried out in order to verify the fulfillment by a legal entity of the order 45 issued by the Eastern Department of the Siberian Interregional State Highway Supervision Administration of the Federal Service for Supervision of Transport on 29052018 on the elimination of identified violations of regulatory legal and regulatory technical requirements governing the activities of the road industry The deadline for the execution of the order is 15062018


# 001800467149
Unscheduled inspection
Start date: 2018-06-25, end date: 2018-07-20, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the person carrying out construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 241800325572
Unscheduled inspection
Start date: 2018-05-18, end date: 2018-05-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: implementation of regional state construction supervision during the construction of the specified capital construction facility based on the received notification 47 dated 23042018 on the completion dates of works subject to verification during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of compliance with works and construction materials used during the construction of a capital construction facility, as well as the results of such work, requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with energy metering devices 72 Meeting the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a construction permit


# 241800227550
Unscheduled inspection
Start date: 2018-03-20, end date: 2018-03-30, duration:
Authority: Sibirskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: Verification of the execution of the regulation dated 21112017 334 Objectives of the audit implementation of federal state transport supervision over the compliance of a legal entity with regulatory legal and regulatory technical acts regulating activities in the field of road management Subject of verification measures taken by a legal entity to comply with the requirements of the regulation on the elimination of identified violations of the requirements of regulatory legal and regulatory technical acts regulating activities in the field of road management


# 24170802902975
Unscheduled inspection
Start date: 2017-12-01, end date: 2017-12-14, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the previously issued to the person being audited order dated 19102017 4185DPO on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 30112017. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is to comply with the instructions of the authority responsible for Regional State construction supervision


# 24170802840927
Unscheduled inspection
Start date: 2017-11-13, end date: 2017-11-24, duration:
Authority: Sibirskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: It is carried out within the framework of the functions of control and supervision in the field of automobile and urban land electric transport, in addition to road safety issues, the registration number of the function in the FRSU system is 100017628246 To establish that this inspection is carried out in order to verify the fulfillment by a legal entity of Regulation 85 issued by the Eastern Department of the Siberian MUGADN of the Federal Service for Supervision of Transport on the elimination of identified violations of regulatory legal acts The objectives of this audit are the implementation of federal state transport supervision over compliance by a legal entity with regulatory legal and regulatory technical acts regulating activities in the field of road management. The subject of this audit is the measures taken by a legal entity to comply with the requirements of the regulation on the elimination of identified violations of the requirements of regulatory legal and regulatory technical acts regulating activities in the field of road management


# 24170802720641
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-10-20, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: This audit is conducted in order to verify the fulfillment by a legal entity of Regulation 105 issued on 13092017 by the Eastern Department of the Siberian Federal District Administration of the Federal Service for Supervision of Transport on the elimination of identified violations of regulatory legal and regulatory technical requirements governing the activities of the road industry The deadline for the execution of the regulation is 02102017the objectives of this audit are the implementation of federal state transport supervision over the legal entity's compliance with regulatory legal and regulatory technical requirements The subject of this audit is the measures taken by a legal entity to comply with the requirements of the regulation on the elimination of identified violations of the requirements of regulatory legal and regulatory technical acts regulating activities in the field of road management


# 24170802658193
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-10-20, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction dated 21092017 4029DPO on the elimination of identified violations at the specified capital construction facility, which expires on 06102017. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 00170802640359
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-11-03, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of state construction supervision during the construction of the specified capital construction facility in connection with the received notification dated 14092017 bx 64094 dated 14092017 on the completion of the construction of the capital construction facility


# 24170802592480
Unscheduled inspection
Start date: 2017-10-02, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170802720209
Unscheduled inspection
Start date: 2017-10-11, end date: 2017-10-24, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: verification of the prescription from 26092017 19p


# 24170802317851
Unscheduled inspection
Start date: 2017-09-18, end date: 2017-09-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 22082017 3278DPO on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 15092017. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170701815757
Unscheduled inspection
Start date: 2017-07-31, end date: 2017-08-18, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Krasnoyarskomu krayu
Purpose of inspection: Control over the execution of previously issued prescriptions


# 24170701820304
Unscheduled inspection
Start date: 2017-07-26, end date: 2017-08-22, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification dated 18072017 bx 161 on the start of construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development activities, including technical regulations and project documentation7 The subject of this inspection is71 Verification of the conformity of work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used72 Verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the capital construction facility


# 00170701585944
Unscheduled inspection
Start date: 2017-05-15, end date: 2017-05-17, duration:
Authority: Upravlenie gosudarstvennogo aviacionnogo nadzora i nadzora za obespecheniem transportnoi bezopasnosti po Sibirskomu federalnomu okrugu Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: This audit is conducted for the purpose of state control and supervision of compliance with the requirements of the legislation of the Russian Federation on ensuring transport safety on the basis of paragraphs 1 part 2 of Article 10 of the Federal Law of 26122008 294 FZ "On the Protection of the Rights of Legal Entities and Individual Entrepreneurs in the implementation of state control supervision and municipal control" in connection with the expiration of the deadline for the execution of the instruction of the CA 20160610286DH of 20122016 issued FCU "Baikalupravtodor", the deadline for which expired on April 20, 2017, the purpose of this audit is to carry out surveillance measures regarding the implementation of FCU "Baikalupravtodor" requirements of the legislation of the Russian Federation on ensuring transport safety. The subject of this audit is the fulfillment of the instruction of the CA 20160610286DH dated 20122016


# 24160700087781
Unscheduled inspection
Start date: 2016-09-13, end date: 2016-10-10, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Krasnoyarskomu krayu
Purpose of inspection: control over the execution of regulations 201311 2013116 201311819 201312329 dated 28082015 previously issued by the Department of Supervisory Activities in Krasnoyarsk


# 24160601724822
Unscheduled inspection
Start date: 2016-08-22, end date: —, duration:
Authority:
Purpose of inspection:


# 00160700060285
Unscheduled inspection
Start date: 2016-07-19, end date: —, duration:
Authority: Upravlenie gosudarstvennogo aviacionnogo nadzora i nadzora za obespecheniem transportnoi bezopasnosti po Sibirskomu federalnomu okrugu Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: Implementation of state control and supervision over compliance with the requirements of the legislation of the Russian Federation on ensuring transport safety on the basis of p1h2 art. 10 of the Federal Law of 26122008 294FZ and municipal control in connection with the expiration of the previously issued regulation 91192P47 of 04082014 the deadline for execution expired on June 01, 2016The task is to carry out supervision measures regarding the fulfillment of the mandatory requirements of the Federal State Budgetary Institution Baikalpravavtodor legislation of the Russian Federation on ensuring transport security


# 00160601733583
Unscheduled inspection
Start date: 2016-07-19, end date: 2016-07-27, duration:
Authority: Upravlenie gosudarstvennogo aviacionnogo nadzora i nadzora za obespecheniem transportnoi bezopasnosti po Sibirskomu federalnomu okrugu Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: for the purpose of state control over supervision of compliance with the requirements of the legislation of the Russian Federation on ensuring transport safety on the basis of paragraphs 1 part 2 of Article 10 of the Federal Law of 26122008 294 FZ "On the Protection of the Rights of Legal Entities and Individual Entrepreneurs in the implementation of state control supervision and municipal control" in connection with the expiration of the order 91192P47 of 04082014 issued by FCU Baikalupravtodor the deadline is June 01, 2016


# 24160601545777
Unscheduled inspection
Start date: 2016-04-25, end date: 2016-05-20, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Krasnoyarskomu krayu
Purpose of inspection: control of the execution of the 75TH regulation of 17082015


# 24150601383525
Unscheduled inspection
Start date: 2015-12-03, end date: 2015-12-30, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Krasnoyarskomu krayu
Purpose of inspection: control over the execution of previously issued regulations 2013/1215 2013117 201312022 dated 28082015


# 00150601400090
Unscheduled inspection
Start date: 2015-11-23, end date: 2015-12-18, duration:
Authority: Eniseiskoe territorialnoe upravlenie Federalnogo agentstva po rybolovstvu
Purpose of inspection: State control and supervision of compliance with the legislation of the Russian Federation in the field of fisheries and conservation of Aquatic Biological Resources Federal Law No. 10012002 7 FZ On Environmental Protection Federal Law No. 20122004 166 FZ On Fisheries and Conservation of Aquatic Biological Resources Water Code of the Russian Federation No. 030606 74


# 00150600093881
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093876
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093950
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093874
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093872
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093863
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093946
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093941
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093938
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093857
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093835
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093832
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093890
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093888
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093908
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093906
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093925
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093897
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093921
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093911
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


# 00150600093893
Unscheduled inspection
Start date: 2015-07-09, end date: —, duration:
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
Purpose of inspection: execution of the prescription


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.