# 742101305445
Unscheduled inspection
Start date: 2021-11-10, end date: 2021-11-23, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the work on laying the power cable, laying the control cable, and installing the fence. commissioning and construction materials used during the construction, reconstruction of a capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.
# 742101193030
Unscheduled inspection
Start date: 2021-10-19, end date: 2021-11-01, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the installation of secondary equipment, laying of power cable and laying of control cable and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100695331
Unscheduled inspection
Start date: 2021-09-14, end date: 2021-09-27, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the installation of 110 kV power transformers, installation of 110 kV power equipment, installation of cable ducts and installation of secondary equipment. and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100427267
Unscheduled inspection
Start date: 2021-08-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100512985
Unscheduled inspection
Start date: 2021-08-31, end date: 2021-09-13, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of the OPU building, the installation of the ZRU building, the installation of 110 kV power transformers and the installation of 110 kV power equipment. and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100358642
Unscheduled inspection
Start date: 2021-07-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742005222743
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-11-20, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the work on the installation of supports for the 10 kV overhead line and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model in the event that the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 911902862842
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-07-26, duration: —
Authority: Gosudarstvennyi komitet po gosudarstvennoi registracii i kadastru Respubliki Krym
Purpose of inspection: Execution of state functions for the implementation of state land supervision on the basis of an administrative survey act containing information on the presence of signs of violations of the requirements of the legislation of the Russian Federation for which the legislation of the Russian Federation provides for administrative and other responsibility Verification of compliance with the requirements of land legislation when using a land plot located at the address Republic of Crimea Simferopol district sUkrainka Ulbratiev Golubevsobservance of mandatory requirements and or requirements established by municipal legal acts part 3 of Article 71 of the Land Code of the Russian Federation compliance of the information contained in the notification of the commencement of certain types of entrepreneurial activity with mandatory requirements compliance of the information contained in the application and documents of a legal entity or individual entrepreneur on granting the legal status of a special permit license for the right to carry out certain types of activities or authorization approval for other legally significant actions if the relevant unscheduled verification of a legal entity of an individual entrepreneur is provided for by the rules for granting the legal status of a special permit license issuance of a permit approval of mandatory requirements as well as data on these legal entities and individual entrepreneurs contained in the unified state register of legal entities the unified state register of individual entrepreneurs and other federal information resources compliance with the instructions of state control bodies supervision bodies of municipal control
# 741801652219
Unscheduled inspection
Start date: 2018-10-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741801893147
Unscheduled inspection
Start date: 2018-10-10, end date: 2018-10-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on connecting transformer substation equipment and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741801967348
Unscheduled inspection
Start date: 2018-10-18, end date: 2018-11-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Completed object 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741801460880
Unscheduled inspection
Start date: 2018-09-19, end date: 2018-09-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of foundations for transformer substations BKTP 27 28 29 1 2 3 4 5 6 RP 1 2 and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741801119272
Unscheduled inspection
Start date: 2018-09-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800430490
Unscheduled inspection
Start date: 2018-06-13, end date: 2018-06-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the work on the installation of foundations for transformer substations BKTP 18 17 16 15 14 13 12 11 10 9 8 7 RP 3 4 and the construction materials used during the construction of the capital construction facility as well as the results of such work to the requirements of the technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of HH 23 and 31 ct52 Urban Planning the Code of the Russian Federation
# 741800338338
Unscheduled inspection
Start date: 2018-05-07, end date: 2018-05-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of foundations for transformer substations BKTP 19 20 21 22 23 24 25 26 RP 5 6 and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800216361
Unscheduled inspection
Start date: 2018-03-26, end date: 2018-03-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the interior finishing works and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hr 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation
# 72170802964208
Unscheduled inspection
Start date: 2017-12-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160700806963
Unscheduled inspection
Start date: 2016-09-23, end date: 2016-09-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of window blocks, the installation of facades and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700111282
Unscheduled inspection
Start date: 2016-09-08, end date: 2016-09-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of columns of exterior walls and staircases above m 9600 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation