# 74170701810812
Unscheduled inspection
Start date: 2017-07-20, end date: 2017-07-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the base of the gas pipeline to the laying of the gas pipeline pipe from PK0 to PK 2+185 average pressure to the installation of the gas pipeline by the NNB method from PK2+155 to PK7+365 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The availability of a construction permit 3 The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation