# 00170701809368
Unscheduled inspection
Start date: 2017-07-13, end date: 2017-07-13, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 111 Visual inspection of objects of technical devices and the adjacent territory with the use, if necessary, of photographs and videotapes112 Examination of documents the presentation of which is provided for in paragraph 13 of this order 113 Assessment of the reliability of information previously submitted to the Ural Department of Rostechnadzor with the actual data 114 Application of measures to prevent identify and suppress violations of mandatory requirements 115 In case of detection of violations of mandatory requirements or unjustified obstacles to the holding of events to take measures provided for by law to bring persons who have committed violations to administrative responsibility in accordance with the Administrative Code of the Russian Federation 116 Sending materials to law enforcement and other bodies on violations of mandatory requirements to resolve the issue of initiating criminal and administrative cases in accordance with their powers
# 742101384787
Unscheduled inspection
Start date: 2021-11-29, end date: 2021-12-24, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742101358457
Unscheduled inspection
Start date: 2021-11-24, end date: 2021-12-21, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742101224746
Unscheduled inspection
Start date: 2021-10-29, end date: 2021-11-08, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on the installation of internal power supply systems, finishing works, installation of elevator equipment (notify after completion of work) and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (with taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects for which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100642215
Unscheduled inspection
Start date: 2021-09-10, end date: 2021-10-07, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100365569
Unscheduled inspection
Start date: 2021-07-23, end date: 2021-07-29, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of load-bearing structures of those floors (after the actual completion of work), the roof (during the production of work), the device of translucent structures (during the production of work) and the construction materials used in the process of construction, reconstruction of the capital construction facility, as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100265077
Unscheduled inspection
Start date: 2021-06-30, end date: 2021-07-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of load-bearing structures from the 15th to the 18th floor (external and internal walls, ceilings) before the installation of external and internal wall panels. floors, the installation of internal partitions (in the course of work). Installation of translucent structures (in the course of work) and the construction materials used in the process of construction, reconstruction of the capital construction facility, as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100191476
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-05-21, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of load-bearing structures from the 7th to the 10th floor (external and internal walls, ceilings) before the installation of external and internal wall panels of the 11th floor, the device of internal partitions (during the work) and the building materials used during construction, reconstruction of the capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100119777
Unscheduled inspection
Start date: 2021-04-16, end date: 2021-04-22, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of load-bearing structures of the basement and first floor, 2nd floor (exterior and interior walls, ceilings) before the installation of exterior and interior wall panels of the 3rd floor, the installation of internal partitions (in the course of work) and the construction materials used during construction, reconstruction of the capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742005275112
Unscheduled inspection
Start date: 2020-12-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742005272520
Unscheduled inspection
Start date: 2020-12-21, end date: 2020-12-25, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed to verify the actual condition of the facility and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742005272516
Unscheduled inspection
Start date: 2020-12-21, end date: 2020-12-25, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed to verify the actual condition of the facility and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004311601
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-03-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: It is carried out in order to monitor compliance with the requirements of Federal Law No. 214 FZ dated December 30, 2004 "On Participation in the Shared Construction of Apartment Buildings and Other Real Estate Objects and on Amendments to Certain Legislative Acts of the Russian Federation" hereinafter Federal Law No. 30122004g 214 FZ as well as normative legal acts adopted in accordance with it The Russian Federation and the Chelyabinsk Region during the construction of facilities, the developer's compliance with the mandatory requirements of Article 31 19 of the Federal Law of 30122004g 214F of the Decree of the Government of the Russian Federation of 26032019 319 "On the unified information system of housing construction" hereinafter Resolution 319, the developer's compliance with the mandatory legal requirements for free access to information discloses information by placing it in the unified information system of housing construction
# 741800062685
Unscheduled inspection
Start date: 2018-02-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 00170701809368
Unscheduled inspection
Start date: 2017-07-13, end date: 2017-07-13, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 111 Visual inspection of objects of technical devices and the adjacent territory with the use, if necessary, of photographs and videotapes112 Examination of documents the presentation of which is provided for in paragraph 13 of this order 113 Assessment of the reliability of information previously submitted to the Ural Department of Rostechnadzor with the actual data 114 Application of measures to prevent identify and suppress violations of mandatory requirements 115 In case of detection of violations of mandatory requirements or unjustified obstacles to the holding of events to take measures provided for by law to bring persons who have committed violations to administrative responsibility in accordance with the Administrative Code of the Russian Federation 116 Sending materials to law enforcement and other bodies on violations of mandatory requirements to resolve the issue of initiating criminal and administrative cases in accordance with their powers
# 74170701707504
Unscheduled inspection
Start date: 2017-06-16, end date: 2017-06-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of internal engineering systems of power supply smoke removal ventilation fire alarm after commissioning installation of elevators and elevator equipment after commissioning interior finishing work balcony glazing in full fire-fighting sanitary and epidemiological measures and building materials used in the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation2 Availability of a permit on construction3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701729496
Unscheduled inspection
Start date: 2017-06-23, end date: 2017-07-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of a capital construction facility completed 2The receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701642136
Unscheduled inspection
Start date: 2017-05-31, end date: 2017-06-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the performance of internal finishing works in the course of work with the installation of internal engineering systems of water supply sewerage heating and building materials used in construction, as well as the results of such work, with the requirements of technical regulations and design documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701548771
Unscheduled inspection
Start date: 2017-04-20, end date: 2017-04-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1filling of window openings in full installation of aluminum structures on balconies in the course of work installation of engineering networks of water supply sewerage heat supply and construction materials used in construction as well as the results of such work to the requirements of technical regulations and design documentation2 Obtaining a construction permit 3fulfilling the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701469456
Unscheduled inspection
Start date: 2017-03-22, end date: 2017-03-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of the 1618th floors with the installation of internal engineering systems for water supply sewerage heating electricity smoke removal ventilation during the production process before commissioning and construction materials used in the construction of a residential building 16 str. Yaroslavskaya 11a in the Sovetsky district of Chelyabinsk, as well as the results of such work with the requirements of technical regulations and design documentation2the presence of a construction permit 3The fulfillment of the requirements of the hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701386059
Unscheduled inspection
Start date: 2017-02-16, end date: 2017-02-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed on the installation of the 1115th floor with the filling of window openings in the course of work and the construction materials used in the construction of a residential building 16 str. Yaroslavskaya 11a in the Sovetsky district of Chelyabinsk, as well as the results of such work with the requirements of technical regulations and design documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 st 52 of the Urban Planning Code of the Russian Federation
# 74170701331291
Unscheduled inspection
Start date: 2017-02-01, end date: 2017-03-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701322268
Unscheduled inspection
Start date: 2017-01-31, end date: 2017-02-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the completed work on the installation of the 510th floor and the construction materials used in the construction of a residential building 16 str. Yaroslavskaya 11a in the Sovetsky district of Chelyabinsk, as well as the results of such work with the requirements of technical regulations and design documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 st 52 of the Urban Planning Code of the Russian Federation
# 74160701259764
Unscheduled inspection
Start date: 2016-12-26, end date: 2016-12-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the completed work on the installation of the 14th floor and the construction materials used in the construction of a residential building 16 str. Yaroslavskaya 11a in the Sovetsky district of Chelyabinsk, as well as the results of such work with the requirements of technical regulations and design documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 st 52 of the Urban Planning Code of the Russian Federation
# 74160701070164
Unscheduled inspection
Start date: 2016-11-08, end date: 2016-11-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The conformity of the device of a monolithic foundation plate for the installation of foundation blocks of the FBS in the course of work of the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701086492
Unscheduled inspection
Start date: 2016-11-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160601720881
Unscheduled inspection
Start date: 2016-07-26, end date: 2016-08-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the excavation work of the foundation pit of the construction materials used in the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation