# 002101367248
Unscheduled inspection
Start date: 2021-12-01, end date: 2021-12-14, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: Purpose: assessment of the conformity of the capital construction facility (A group of mixed residential buildings along Kutuzov Street in Petropavlovsk-Kamchatsky city district. I stage of construction. 9-storey 45-sq.m. a monolithic apartment building. Item 3,) and related construction (reconstruction) processes to safety requirements. Tasks: prevention, detection and suppression of violations of the legislation of the Russian Federation on urban development, including technical regulations (norms and rules), and design documentation during the construction (reconstruction) of a capital construction facility. Subject of verification: compliance with the requirements of Parts 2, 3, 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; verification of compliance of the work and the construction materials used in the construction (reconstruction) of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with the provisions of the Urban Planning Code of the Russian Federation (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation; compliance with the mandatory requirements of the legislation of the Russian Federation on urban development, compliance of the work performed, the construction materials used and the results of such work with the requirements of design documentation during the construction (reconstruction) of the facility;
# 002101157529
Unscheduled inspection
Start date: 2021-10-25, end date: 2021-11-01, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: Purpose: to assess the compliance of the capital construction facility (an apartment building located at the address: Kamchatka Territory, Milkovo village, Sovetskaya str.) and related construction (reconstruction) processes with safety requirements. Tasks: prevention, detection and suppression of violations of the legislation of the Russian Federation on urban development, including technical regulations (norms and rules), and design documentation during the construction (reconstruction) of a capital construction facility. Subject of verification: compliance with the requirements of Parts 2, 3, 3.1 of Article 52 of the Urban Planning Code of the Russian Federation
# 002100361844
Unscheduled inspection
Start date: 2021-07-15, end date: 2021-07-19, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: Purpose: assessment of the conformity of the capital construction facility (A group of mixed residential buildings along Kutuzov Street in Petropavlovsk-Kamchatsky city district. I stage of construction. 9-storey 45-sq.m. a monolithic apartment building. Pos. 3) and related construction (reconstruction) processes to safety requirements. Tasks: prevention, detection and suppression of violations of the legislation of the Russian Federation on urban development, including technical regulations (norms and rules), and design documentation during the construction (reconstruction) of a capital construction facility. Subject of inspection: compliance with the requirements of the Inspection regulations
# 001903900807
Unscheduled inspection
Start date: 2019-11-05, end date: 2019-11-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: Objective Assessment of the compliance of the capital construction facility "Group of mixed residential buildings along Kutuzov Street in Petropavlovsk-Kamchatsky city district I stage of construction 9-storey 45sq monolithic residential building Pos 2" hereinafter the facility and related construction processes with safety requirements The objectives of this audit are to prevent identify and suppress violations of the legislation of the Russian Federation on urban development, including technical regulations and design documentation when The subject of this inspection is compliance with the mandatory requirements of the legislation of the Russian Federation on urban planning activities, compliance of the work performed with the construction materials used and the results of such work with the requirements of design documentation during the construction of the facility
# 001903900594
Unscheduled inspection
Start date: 2019-11-05, end date: 2019-11-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: The purpose of assessing the compliance of the capital construction facility "Group of mixed residential buildings along Kutuzov Street in Petropavlovsk-Kamchatsky city district I stage of construction 9-storey 45sq monolithic residential building Pos 1" hereinafter the object and related construction processes with safety requirements The objectives of this audit are to prevent identify and suppress violations of the legislation of the Russian Federation on urban development, including technical regulations and design documentation when The subject of this inspection is compliance with the mandatory requirements of the legislation of the Russian Federation on urban planning activities, compliance of the work performed with the construction materials used and the results of such work with the requirements of design documentation during the construction of the facility
# 001902450365
Unscheduled inspection
Start date: 2019-02-04, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection:
# 001902446777
Unscheduled inspection
Start date: 2019-02-04, end date: 2019-02-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: The purpose is to assess the compliance of the capital construction facility "Group of mixed residential buildings along Kutuzov Street in Petropavlovsk-Kamchatsky city district I stage of construction 9-storey 45sq monolithic residential building Pos 1" and related construction processes with safety requirements The objectives of this audit are to prevent identify and suppress violations of the legislation of the Russian Federation on urban development, including technical regulations and other regulatory legal acts The subject of this audit is 1 compliance with the mandatory requirements of the legislation of the Russian Federation on urban planning activities compliance of the work performed, the construction materials used and the results of such work with the requirements of project documentation during the construction of the facility 2 compliance with the requirements of parts 2 3 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 002101367248
Unscheduled inspection
Start date: 2021-12-01, end date: 2021-12-14, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: Purpose: assessment of the conformity of the capital construction facility (A group of mixed residential buildings along Kutuzov Street in Petropavlovsk-Kamchatsky city district. I stage of construction. 9-storey 45-sq.m. a monolithic apartment building. Item 3,) and related construction (reconstruction) processes to safety requirements. Tasks: prevention, detection and suppression of violations of the legislation of the Russian Federation on urban development, including technical regulations (norms and rules), and design documentation during the construction (reconstruction) of a capital construction facility. Subject of verification: compliance with the requirements of Parts 2, 3, 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; verification of compliance of the work and the construction materials used in the construction (reconstruction) of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with the provisions of the Urban Planning Code of the Russian Federation (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation; compliance with the mandatory requirements of the legislation of the Russian Federation on urban development, compliance of the work performed, the construction materials used and the results of such work with the requirements of design documentation during the construction (reconstruction) of the facility;
# 002101157529
Unscheduled inspection
Start date: 2021-10-25, end date: 2021-11-01, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: Purpose: to assess the compliance of the capital construction facility (an apartment building located at the address: Kamchatka Territory, Milkovo village, Sovetskaya str.) and related construction (reconstruction) processes with safety requirements. Tasks: prevention, detection and suppression of violations of the legislation of the Russian Federation on urban development, including technical regulations (norms and rules), and design documentation during the construction (reconstruction) of a capital construction facility. Subject of verification: compliance with the requirements of Parts 2, 3, 3.1 of Article 52 of the Urban Planning Code of the Russian Federation
# 002100361844
Unscheduled inspection
Start date: 2021-07-15, end date: 2021-07-19, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: Purpose: assessment of the conformity of the capital construction facility (A group of mixed residential buildings along Kutuzov Street in Petropavlovsk-Kamchatsky city district. I stage of construction. 9-storey 45-sq.m. a monolithic apartment building. Pos. 3) and related construction (reconstruction) processes to safety requirements. Tasks: prevention, detection and suppression of violations of the legislation of the Russian Federation on urban development, including technical regulations (norms and rules), and design documentation during the construction (reconstruction) of a capital construction facility. Subject of inspection: compliance with the requirements of the Inspection regulations
# 002100346173
Unscheduled inspection
Start date: 2021-06-30, end date: 2021-07-09, duration: 8
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: Purpose: assessment of the conformity of the capital construction object (40-apartment residential building on the street Sovetskaya in the village of Milkovo, Kamchatka Territory, position No. 3) and related construction (reconstruction) processes to safety requirements. Tasks: prevention, detection and suppression of violations of the legislation of the Russian Federation on urban development, including technical regulations (norms and rules), and design documentation during the construction (reconstruction) of a capital construction facility. The subject of verification: compliance with the mandatory requirements of the legislation of the Russian Federation on urban development, compliance of the work performed, the construction materials used and the results of such work with the requirements of design documentation during the construction (reconstruction) of the facility;
# 002100236282
Unscheduled inspection
Start date: 2021-05-11, end date: 2021-05-20, duration: 8
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: Purpose: assessment of the conformity of the capital construction facility (A group of mixed residential buildings along Kutuzov Street in Petropavlovsk-Kamchatsky city district. I stage of construction. 9-storey 45-sq.m. a monolithic apartment building. Pos. 3) and related construction (reconstruction) processes to safety requirements. Tasks: prevention, detection and suppression of violations of the legislation of the Russian Federation on urban development, including technical regulations (norms and rules), and design documentation during the construction (reconstruction) of a capital construction facility. Subject of verification: ; compliance with the requirements of Parts 2, 3, 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; verification of compliance of the work and construction materials used in the construction (reconstruction) of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with the provisions of the Urban Planning Code of the Russian Federation (taking into account the changes made to the design documentation documentation in accordance with Parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation
# 412105327612
Unscheduled inspection
Start date: 2021-02-01, end date: 2021-02-19, duration: 15
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: Purpose: assessment of the conformity of the capital construction facility (A group of mixed residential buildings along Kutuzov Street in Petropavlovsk-Kamchatsky city district. I stage of construction. 9-storey 45-sq.m. a monolithic apartment building. Pos. 3) and related construction (reconstruction) processes to safety requirements. Tasks: prevention, detection and suppression of violations of the legislation of the Russian Federation on urban development, including technical regulations (norms and rules), and design documentation during the construction (reconstruction) of a capital construction facility. The subject of the audit: compliance with the requirements of Parts 2, 3, 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; compliance with the mandatory requirements of the legislation of the Russian Federation on urban planning activities, compliance of the work performed, the construction materials used and the results of such work with the requirements of project documentation
# 412005215688
Unscheduled inspection
Start date: 2020-11-23, end date: 2020-12-18, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: The purpose of the assessment of compliance of the capital construction facility and related construction processes with safety requirements The objectives of this audit are to prevent identify and suppress violations of the legislation of the Russian Federation on urban development activities including technical regulations other regulatory legal acts and design documentation during the construction of the object The subject of this audit is 1 compliance with mandatory requirements of the legislation of the Russian Federation on urban development activities compliance of the work performed with the construction materials used and the results of such work to the requirements of the design documentation during the construction of the facility 2 compliance with the requirements of parts 2 3 31 of Article 52 of the Urban Planning Code of the Russian Federation 3 availability of a construction permit
# 412005296067
Unscheduled inspection
Start date: 2020-11-27, end date: 2020-12-09, duration: 9
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: purpose assessment of compliance of the facility and related construction processes with safety requirements objectives of this audit prevention detection and suppression of violations of the legislation of the Russian Federation on urban development and design documentation during the construction of the facility the subject of this audit compliance with the legislation of the Russian Federation on urban development compliance of the work performed, applied building materials and the results of such work with the requirements of design documentation during the construction of the facility
# 412005286824
Unscheduled inspection
Start date: 2020-11-30, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection:
# 412005199544
Unscheduled inspection
Start date: 2020-10-15, end date: 2020-10-23, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: this audit is carried out in order to assess the compliance of the capital construction facility and related construction processes with safety requirements. The objectives of this audit are to prevent identify and suppress violations of the legislation of the Russian Federation on urban development activities, including design documentation during the construction of the facility. The subject of this audit is the fulfillment of the requirements of the Regulation from 13072020 g 10460133282019
# 412005160229
Unscheduled inspection
Start date: 2020-08-27, end date: 2020-08-31, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: the purpose is to assess the compliance of the facility and related construction processes with safety requirements the objectives of this audit are to prevent identify and suppress violations of the legislation of the Russian Federation on urban development activities including technical regulations norms and rules and design documentation during the construction of the facility the subject of this audit is compliance with the requirements of the order of the Inspection of the State Tax Service of the Kamchatka Territory 5000133322016 from 30032020
# 412004459751
Unscheduled inspection
Start date: 2020-07-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 412004511829
Unscheduled inspection
Start date: 2020-07-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 412004425412
Unscheduled inspection
Start date: 2020-06-18, end date: 2020-06-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: Purpose assessment of compliance of the capital construction facility and related construction processes with safety requirements The objectives of this audit are to prevent identify and suppress violations of the legislation of the Russian Federation on urban development, including technical regulations, other regulatory legal acts and design documentation during construction of the facility The subject of this audit is to comply with the requirements of the order of the Inspection of the State Tax Service of the Kamchatka Territory from 27052020 g 7210133292019
# 412004402154
Unscheduled inspection
Start date: 2020-05-14, end date: 2020-05-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: This audit is carried out in order to assess the compliance of the capital construction facility and related construction processes with safety requirements. The objectives of this audit are to prevent identify and suppress violations of the legislation of the Russian Federation on urban development activities, including design documentation during the construction of the facility. The subject of this audit is to comply with the requirements of the Inspection order of 12022020 g 2230133282019
# 412004407353
Unscheduled inspection
Start date: 2020-05-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 412004307974
Unscheduled inspection
Start date: 2020-03-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 412004338850
Unscheduled inspection
Start date: 2020-03-16, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya truda v Kamchatskom krae
Purpose of inspection:
# 412004400251
Unscheduled inspection
Start date: 2020-03-18, end date: 2020-03-30, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: the purpose is to assess the compliance of the facility and related construction processes with safety requirements the objectives of this audit are to prevent identify and suppress violations of the legislation of the Russian Federation on urban development activities including technical regulations norms and rules and design documentation during the construction of the facility the subject of this audit is compliance with the legislation of the Russian Federation on urban development activities compliance of the work performed with the construction materials used and the results of such work the requirements of the project documentation during the construction of the facility
# 412004229161
Unscheduled inspection
Start date: 2020-02-04, end date: 2020-02-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: This audit is carried out in order to assess the compliance of the capital construction facility and related construction processes with safety requirements. The objectives of this audit are to prevent identify and suppress violations of the legislation of the Russian Federation on urban development activities, including design documentation during construction of the facility. The subject of this audit is the compliance of the work and construction materials used during the construction of the capital construction facility as well as the results of such works according to the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the used energy resources of the facility
# 001903900807
Unscheduled inspection
Start date: 2019-11-05, end date: 2019-11-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: Objective Assessment of the compliance of the capital construction facility "Group of mixed residential buildings along Kutuzov Street in Petropavlovsk-Kamchatsky city district I stage of construction 9-storey 45sq monolithic residential building Pos 2" hereinafter the facility and related construction processes with safety requirements The objectives of this audit are to prevent identify and suppress violations of the legislation of the Russian Federation on urban development, including technical regulations and design documentation when The subject of this inspection is compliance with the mandatory requirements of the legislation of the Russian Federation on urban planning activities, compliance of the work performed with the construction materials used and the results of such work with the requirements of design documentation during the construction of the facility
# 001903900594
Unscheduled inspection
Start date: 2019-11-05, end date: 2019-11-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: The purpose of assessing the compliance of the capital construction facility "Group of mixed residential buildings along Kutuzov Street in Petropavlovsk-Kamchatsky city district I stage of construction 9-storey 45sq monolithic residential building Pos 1" hereinafter the object and related construction processes with safety requirements The objectives of this audit are to prevent identify and suppress violations of the legislation of the Russian Federation on urban development, including technical regulations and design documentation when The subject of this inspection is compliance with the mandatory requirements of the legislation of the Russian Federation on urban planning activities, compliance of the work performed with the construction materials used and the results of such work with the requirements of design documentation during the construction of the facility
# 001902899119
Unscheduled inspection
Start date: 2019-10-01, end date: 2019-10-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: Objective Assessment of the compliance of the capital construction facility "Group of mixed residential buildings along Kutuzov Street in Petropavlovsk-Kamchatsky city district I stage of construction 9-storey 45sq monolithic residential building Pos 2" hereinafter the facility and related construction processes with safety requirements The objectives of this audit are to prevent identify and suppress violations of the legislation of the Russian Federation on urban development, including technical regulations and other regulatory legal acts and design documentation during the construction of the facility, the subject of this inspection is to comply with the requirements of Inspection Regulation 14720133352018 of 19072019
# 001902899116
Unscheduled inspection
Start date: 2019-10-01, end date: 2019-10-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: Objective Assessment of the compliance of the capital construction facility "Group of mixed residential buildings along Kutuzov Street in Petropavlovsk-Kamchatsky city district I stage of construction 9-storey 45sq monolithic residential building Pos 1" hereinafter the object and related construction processes with safety requirements The objectives of this audit are the prevention detection and suppression of violations of the legislation of the Russian Federation on urban development, including technical regulations and other regulatory legal acts and design documentation during the construction of the facility, the subject of this inspection is to comply with the requirements of Inspection Regulation 14690133342018 of 19072019
# 001902846349
Unscheduled inspection
Start date: 2019-07-01, end date: 2019-07-05, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: The purpose is to assess the compliance of the object "Complex of apartment buildings in the Primorsky residential area of Vilyuchinsk, Kamchatka Territory" and related construction processes with safety requirements. The tasks are to prevent, identify and suppress violations of the legislation of the Russian Federation on urban development, including technical regulations, norms and rules and design documentation during the construction of the above-mentioned object. The subject is compliance with the legislation of the Russian Federation on urban development. urban planning activities compliance of the works performed, the construction materials used and the results of such work with the requirements of the design documentation for the construction of the above-mentioned object
# 001902707188
Unscheduled inspection
Start date: 2019-07-03, end date: 2019-07-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: Objective Assessment of the compliance of the capital construction facility "Group of mixed residential buildings along Kutuzov Street in Petropavlovsk-Kamchatsky city district I stage of construction 9-storey 45sq monolithic residential building Pos 2" hereinafter the facility and related construction processes with safety requirements The objectives of this audit are to prevent identify and suppress violations of the legislation of the Russian Federation on urban development, including technical regulations and design documentation when The object of this inspection is to comply with the mandatory requirements of the legislation of the Russian Federation on urban planning activities, compliance of the work performed with the construction materials used and the results of such work with the requirements of design documentation during the construction of the facility
# 001902707160
Unscheduled inspection
Start date: 2019-07-03, end date: 2019-07-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: Objective Assessment of the compliance of the capital construction facility "Group of mixed residential buildings along Kutuzov Street in Petropavlovsk-Kamchatsky city district I stage of construction 9-storey 45sq monolithic residential building Pos 1" hereinafter the object and related construction processes with safety requirements The objectives of this audit are to prevent identify and suppress violations of the legislation of the Russian Federation on urban development, including technical regulations and design documentation when The subject of this inspection is compliance with the mandatory requirements of the legislation of the Russian Federation on urban planning activities compliance of the work performed with the construction materials used and the results of such work with the requirements of design documentation during the construction of the facility
# 001902450365
Unscheduled inspection
Start date: 2019-02-04, end date: 2019-02-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: the purpose of assessing the compliance of the capital construction facility "Group of mixed residential buildings along Kutuzov Street in Petropavlovsk-Kamchatsky city district I stage of construction 9-storey 45sq monolithic residential building Pos 2" and related construction processes with safety requirements The objectives of this audit are to prevent identify and suppress violations of the legislation of the Russian Federation on urban development, including technical regulations and other regulatory legal acts The subject of this audit is 1 compliance with the mandatory requirements of the legislation of the Russian Federation on urban planning activities compliance of the work performed, the construction materials used and the results of such work with the requirements of project documentation during the construction of the facility 2 compliance with the requirements of parts 2 3 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001902446777
Unscheduled inspection
Start date: 2019-02-04, end date: 2019-02-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: The purpose is to assess the compliance of the capital construction facility "Group of mixed residential buildings along Kutuzov Street in Petropavlovsk-Kamchatsky city district I stage of construction 9-storey 45sq monolithic residential building Pos 1" and related construction processes with safety requirements The objectives of this audit are to prevent identify and suppress violations of the legislation of the Russian Federation on urban development, including technical regulations and other regulatory legal acts The subject of this audit is 1 compliance with the mandatory requirements of the legislation of the Russian Federation on urban planning activities compliance of the work performed, the construction materials used and the results of such work with the requirements of project documentation during the construction of the facility 2 compliance with the requirements of parts 2 3 31 of Article 52 of the Urban Planning Code of the Russian Federation