# 242101406194
Unscheduled inspection
Start date: 2021-12-06, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction No. 2385-ONS-3 previously issued to the person being checked on 04.10.2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 03.12.2021.
The objectives of this inspection are: to establish the fact of elimination of previously identified violations, to verify the work actually performed in accordance with the prescribed measures within the prescribed period the deadline.
7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.
# 242100926409
Unscheduled inspection
Start date: 2021-09-20, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 242100926280
Unscheduled inspection
Start date: 2021-09-20, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 242100930367
Unscheduled inspection
Start date: 2021-09-21, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 242100454270
Unscheduled inspection
Start date: 2021-08-10, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out for the purpose of: verifying the fulfillment of the previously issued to the person being checked instruction No. 90-DS dated 06/18/2021 on the elimination of identified violations, the deadline for which expired on 08/9/2021 (reasoned submission dated 08/9/2021 No. 144);
The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period.
7. The subject of this audit is: compliance with the mandatory
requirements established by Federal Law No. 214-FZ dated 12/30/2004 "On Participation in the Shared Construction of Apartment Buildings and Other Real Estate Objects and on Amendments to Certain Legislative Acts of the Russian Federation" and other regulatory legal acts of the Russian Federation adopted in accordance with it.
# 242100334921
Unscheduled inspection
Start date: 2021-07-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 242100211699
Unscheduled inspection
Start date: 2021-05-18, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that:
This inspection is carried out in order to verify the fulfillment of the instruction No. 556-ons-3 dated 04/05/2021 issued earlier to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 05/17/2021.
The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period.
7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.
# 242100243512
Unscheduled inspection
Start date: 2021-05-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 242005206700
Unscheduled inspection
Start date: 2020-11-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 242004370036
Unscheduled inspection
Start date: 2020-04-01, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 242004336028
Unscheduled inspection
Start date: 2020-03-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 242004338743
Unscheduled inspection
Start date: 2020-02-28, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 242004302283
Unscheduled inspection
Start date: 2020-02-28, end date: 2020-03-13, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that the present inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked dated 29112019 3308/2003 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 27022020the objectives of this inspection are to establish the elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period
# 242004161211
Unscheduled inspection
Start date: 2020-01-09, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 241903924671
Unscheduled inspection
Start date: 2019-11-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 241903651746
Unscheduled inspection
Start date: 2019-10-01, end date: 2019-10-28, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of works that are subject to inspection in accordance with the approved program dated 25/122018 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation
# 241903850130
Unscheduled inspection
Start date: 2019-10-16, end date: 2019-11-13, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out state control and supervision in the field of shared-equity construction of apartment buildings and or other real estate objects based on the identification during the analysis of the developer's quarterly reports on activities related to attracting funds from participants in shared-equity construction for the construction of apartment buildings and or other real estate objects of signs of violation of mandatory requirements motivated presentation based on the results preliminary inspection dated 30092018 286 The objectives of this inspection are to prevent identify and suppress violations of the requirements of legislation in the field of shared-equity construction of apartment buildings and or other real estate objects. The purpose of this inspection is to comply with mandatory requirements and or requirements established by municipal legal acts
# 24190803485271
Unscheduled inspection
Start date: 2019-09-02, end date: 2019-09-27, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the deadline for completion of work that is subject to verification in accordance with the approved program dated 25/122018 for inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction
# 24190803449349
Unscheduled inspection
Start date: 2019-07-03, end date: 2019-07-30, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the deadline for completion of work that is subject to verification in accordance with the approved program dated 25/122018 for inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction
# 241904275945
Unscheduled inspection
Start date: 2019-06-13, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 241904276010
Unscheduled inspection
Start date: 2019-06-14, end date: 2019-07-11, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out state control and supervision in the field of shared-equity construction of apartment buildings and or other real estate objects based on the identification during the analysis of the project declaration of signs of violation of mandatory requirements established by legislation on participation in shared-equity construction of apartment buildings and or other real estate objects motivated submission based on the results of the preliminary audit dated 06062019152the objectives of this audit are prevention detection and suppression of violations of the requirements of legislation in the field of shared-equity construction of apartment buildings and or other real estate objects the subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts
# 241904276078
Unscheduled inspection
Start date: 2019-06-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24190803424728
Unscheduled inspection
Start date: 2019-05-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24190803377928
Unscheduled inspection
Start date: 2019-04-01, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 24190803403781
Unscheduled inspection
Start date: 2019-04-26, end date: 2019-05-16, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being checked regulation No. 745OZHS dated 28032019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 25042019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision
# 24190803364952
Unscheduled inspection
Start date: 2019-03-15, end date: 2019-03-28, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being checked regulation 5197OZHS dated 09.012019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 14032.019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision
# 241802328703
Unscheduled inspection
Start date: 2018-12-25, end date: 2019-01-29, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 311 dated 17122018 on the start of construction of the capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation. 7 The subject of this audit is 71 Verification of compliance with works and construction materials used during the construction of a capital construction facility, as well as the results of such work, to the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and to the requirements for equipping a capital construction facility with metering devices for used energy resources 72 Meeting the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code Code of the Russian Federation 73 Checking the availability of a building permit