Found 1 inspection:

# 771903619998
Unscheduled inspection
Start date: 2019-09-18, end date: 2019-09-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notice from the developer to the customer. The objectives of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the person being audited. The subject of the audit is to ensure that the developer fulfills the requirements of part 31 of Article 52 of the Urban Planning Code. The conformity of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.