# 242100224985
Unscheduled inspection
Start date: 2021-05-18, end date: —, duration: 20
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Krasnoyarskomu krayu
Purpose of inspection: To establish that this inspection is carried out in order to verify information about the occurrence of a threat of harm to plants, the environment, specified in the motivated submission dated 05/11/2021 No. 582-060 of the head of the Plant Quarantine Supervision Department of the Rosselkhoznadzor Administration for the Krasnoyarsk Territory, Filimokhin Valentin Sergeevich, upon violation of the rules of storage infected with a quarantine object: big black spruce barbel (Monochamus urussovi (Fisch.) sawn timber of edged coniferous species (scots pine, Siberian spruce, Siberian fir), which is confirmed by the conclusion of the quarantine examination of the Krasnoyarsk branch of the Federal State Budgetary Institution "VNIIKR" dated 30.04.2021 No. 9-6, identified by the results of a planned (raid) inspection, inspection of land plots, storage sites (premises) used for storage and processing quarantined products (timber) located within the boundaries of the cadastral quarter 24:07:0501001 (Krasnoyarsk Territory, Boguchansky district, Oktyabrsky settlement, 1-3 km west of the station Chunoyar).
The purpose of this audit is to carry out control and supervisory measures aimed at preventing, detecting and suppressing violations of mandatory requirements of the legislation of the Russian Federation in the field of federal state quarantine phytosanitary supervision.
# 242005196355
Unscheduled inspection
Start date: 2020-10-22, end date: 2020-11-19, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this audit is carried out in order to carry out regional state construction supervision during the reconstruction of the specified capital construction facility on the basis of received notification 163 dated 15102020 on the completion of the reconstruction of the capital construction facility, the objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities, including project documentation7 The subject of this audit is71 Verification of compliance with the performance of works and applied construction materials in the process of reconstruction of a capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of an information model they are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including the requirements of energy efficiency, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used, all acts of prescriptions notices on the elimination of violations of deficiencies identified during the implementation of regional state construction supervision72 Compliance with the requirements established by parts 2 are subject to verification 3 and 31 Articles 52 of the Urban Planning Code of the Russian Federation73 Verification of the availability of a permit for reconstruction
# 24190803473595
Unscheduled inspection
Start date: 2019-08-06, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: