# 721800257943
Unscheduled inspection
Start date: 2018-03-19, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection:


# 72170701595108
Unscheduled inspection
Start date: 2017-05-02, end date: —, duration:
Authority:
Purpose of inspection:


# 72160701182433
Unscheduled inspection
Start date: 2016-11-28, end date: 2016-12-23, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of a notice dated 16112016 on the completion dates of works subject to verification during construction and reconstruction of a capital construction facility Verification of compliance of work performed and construction materials used during construction, as well as the results of such work with the requirements of technical regulations and other regulatory legal acts, project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices energy resources used in the construction of the capital construction facility "Multi-storey residential building with non-residential premises at 69 Malygina Street, Tyumen" located at 69 Malygina Street, Tyumen Region


# 72160701059967
Unscheduled inspection
Start date: 2016-11-01, end date: 2016-11-29, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the inspection program dated 31092016. Verification of compliance of the work performed and the building materials used during construction, as well as the results of such work, with the requirements of technical regulations and other regulatory legal acts of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used during the construction of the capital construction facility "Multi-storey Residential the house in Tyumen on Golysheva St." located at 24a Golysheva St. Tyumen, Tyumen Region, Russian Federation


# 72160701162448
Unscheduled inspection
Start date: 2016-11-25, end date: 2016-12-22, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Verification of the elimination of violations in accordance with the order dated 13102016 115716ts in accordance with the notice dated 16112016 bn on the elimination of violations during the construction of the reconstruction of the capital construction facility, verification of the compliance of the work and the construction materials used during the construction process, as well as the results of such work with the requirements of technical regulations and other regulatory legal acts of the project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used in the construction of the capital construction facility "Multi-apartment residential building in Tyumen on Golysheva Street" located at the address Tyumen region Tyumen ul. Golysheva


# 72160701064041
Unscheduled inspection
Start date: 2016-10-31, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection:


# 72160700768303
Unscheduled inspection
Start date: 2016-09-16, end date: —, duration:
Authority:
Purpose of inspection:


# 72160601769372
Unscheduled inspection
Start date: 2016-08-03, end date: 2016-08-12, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Verification of compliance with the instructions of the state construction supervision authority dated 10062016 57916L Verification of compliance of the work performed and the building materials used during construction, as well as the results of such work, with the requirements of technical regulations and other regulatory legal acts of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used during the construction of the capital construction facility "Apartment Building in Tyumen on Golysheva St."


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.