# 302101453866
Unscheduled inspection
Start date: 2021-12-08, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora Astrahanskoi oblasti
Purpose of inspection: THE PURPOSE IS TO CHECK THE INSTALLATION OF A HOT WATER STORAGE TANK - 3000 M3, BASED ON A NOTICE ON THE COMPLETION DATES OF THE WORKS TO BE CHECKED DURING THE CONSTRUCTION OF THE OKC - Greenhouse complex "Cedar" (stage 1, stage 2).Construction of 110kV Borzaya PS and 110kV Barricade KVL-Borzaya;
THE TASK IS TO CHECK THE COMPLIANCE OF THE COMPLETED WORKS WITH THE REQUIREMENTS OF THE DESIGN DOCUMENTATION DURING THE CONSTRUCTION OF THE ACS;
THE SUBJECT OF THE KNM IS COMPLIANCE WITH MANDATORY REQUIREMENTS.
# 302101522638
Unscheduled inspection
Start date: 2021-12-27, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora Astrahanskoi oblasti
Purpose of inspection: THE PURPOSE IS TO CHECK THE WORK, BASED ON THE NOTIFICATION OF THE COMPLETION DATES OF THE WORK TO BE CHECKED DURING THE CONSTRUCTION OF THE OKC - Greenhouse complex "Cedar" (stage 1, stage 2).Construction of 110kV Borzaya substation and 110kV Barricade-Borzaya KVL;
THE TASK IS TO CHECK THE COMPLIANCE OF THE COMPLETED WORKS WITH THE REQUIREMENTS OF THE DESIGN DOCUMENTATION DURING THE CONSTRUCTION OF THE ACS;
THE SUBJECT OF THE KNM IS COMPLIANCE WITH MANDATORY REQUIREMENTS.
# 302101343983
Unscheduled inspection
Start date: 2021-11-10, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora Astrahanskoi oblasti
Purpose of inspection: THE PURPOSE IS TO CHECK THE COMPLETED WORK ON THE INSTALLATION OF THE FOUNDATIONS OF THE KTP, DSU, ON THE BASIS OF A NOTICE ON THE COMPLETION DATES OF THE WORK TO BE CHECKED DURING THE CONSTRUCTION OF THE ACS - Greenhouse complex "Cedar" (stage 1, stage 2)- A BLOCK OF WINTER MULTI-SPAN GREENHOUSES, THE ABC BUILDING .Construction of 110kV Borzaya substation and 110kV Barricade-Borzaya KVL. ON-SITE ELECTRICAL NETWORKS (STAGE 2)
THE TASK IS TO VERIFY THE COMPLIANCE OF THE COMPLETED WORK ON THE INSTALLATION OF THE FOUNDATIONS OF THE KTP, DGU, WITH THE REQUIREMENTS OF THE DESIGN DOCUMENTATION
THE SUBJECT OF THE KNM IS COMPLIANCE WITH MANDATORY REQUIREMENTS
# 302101376894
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora Astrahanskoi oblasti
Purpose of inspection: THE PURPOSE IS TO CHECK THE INSTALLATION OF THE ABOVEGROUND PART OF BUILDINGS (CHECKPOINT NO. 1, CHECKPOINT NO. 2), BASED ON THE NOTIFICATION OF THE COMPLETION DATES OF THE WORKS TO BE CHECKED DURING THE CONSTRUCTION OF THE OKC - Greenhouse complex "Cedar" (stage 1, stage 2).Construction of 110kV Borzaya substation and 110kV Barricade-Borzaya KVL;
THE TASK IS TO CHECK THE COMPLIANCE OF THE COMPLETED WORKS ON THE INSTALLATION OF THE ABOVEGROUND PART OF BUILDINGS (CHECKPOINT NO. 1, CHECKPOINT NO. 2) WITH THE REQUIREMENTS OF THE DESIGN DOCUMENTATION FOR THE CONSTRUCTION OF THE ACS;
THE SUBJECT OF THE KNM IS COMPLIANCE WITH MANDATORY REQUIREMENTS.
# 302101349235
Unscheduled inspection
Start date: 2021-11-19, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora Astrahanskoi oblasti
Purpose of inspection: THE PURPOSE IS TO CHECK THE COMPLETED WORK ON THE INSTALLATION OF CABLE LINES OF KTP, DSU, ON THE BASIS OF A NOTICE ON THE COMPLETION DATES OF WORK TO BE CHECKED DURING THE CONSTRUCTION OF THE ACS - Greenhouse complex "Cedar" (stage 1, stage 2) - A BLOCK OF WINTER MULTIDISCIPLINARY GREENHOUSES, THE ABC BUILDING. Construction of 110kV Borzaya substation and 110kV Barricade-Borzaya KVL. ON-SITE ELECTRICAL NETWORKS (STAGE 2).
THE TASK IS TO VERIFY THE COMPLIANCE OF THE COMPLETED WORK ON THE INSTALLATION OF KTP, DGU CABLE LINES WITH THE REQUIREMENTS OF THE PROJECT DOCUMENTATION
THE SUBJECT OF THE KNM IS COMPLIANCE WITH MANDATORY REQUIREMENTS
# 302101349236
Unscheduled inspection
Start date: 2021-11-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 302101240235
Unscheduled inspection
Start date: 2021-10-14, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora Astrahanskoi oblasti
Purpose of inspection: NOTIFICATION OF THE COMPLETION DATES OF THE OKS Greenhouse complex "Cedar" (stage 1, stage 2).Construction of 110kV Borzaya substation and 110kV Barricade-Borzaya KVL. ON-SITE WATER SUPPLY AND SANITATION NETWORKS (STAGE 2) (INSTALLATION OF ON-SITE NETWORKS AND WATER SUPPLY AND SANITATION EQUIPMENT)
# 302101240194
Unscheduled inspection
Start date: 2021-10-14, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora Astrahanskoi oblasti
Purpose of inspection:
# 302101240210
Unscheduled inspection
Start date: 2021-10-14, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora Astrahanskoi oblasti
Purpose of inspection: NOTIFICATION OF THE COMPLETION DATES OF THE OKS Greenhouse complex "Cedar" (stage 1, stage 2).Construction of 110kV Borzaya substation and 110kV Barricade-Borzaya KVL. OFF-SITE WATER SUPPLY AND SANITATION NETWORKS (STAGE 2) (INSTALLATION OF OFF-SITE NETWORKS AND WATER SUPPLY AND SANITATION EQUIPMENT)
# 302101240177
Unscheduled inspection
Start date: 2021-10-14, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora Astrahanskoi oblasti
Purpose of inspection: NOTIFICATION OF THE COMPLETION DATES OF the ACS - Greenhouse complex "Cedar" (stage 1, stage 2).Construction of 110kV Borzaya substation and 110kV Barricade-Borzaya KVL. COMMUNICATION NETWORKS (STAGE 2) (INSTALLATION OF COMMUNICATION NETWORKS)
# 302101212786
Unscheduled inspection
Start date: 2021-09-13, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora Astrahanskoi oblasti
Purpose of inspection: NOTICE OF COMPLETION OF THE CONSTRUCTION OF THE ACS - Greenhouse complex "Cedar" (stage 1, stage 2).Construction of 110kV Borzaya substation and 110kV Barricade-Borzaya substation (110KV BORZAYA substation)
# 302101212735
Unscheduled inspection
Start date: 2021-09-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 302101209439
Unscheduled inspection
Start date: 2021-08-30, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora Astrahanskoi oblasti
Purpose of inspection: NOTIFICATION OF THE COMPLETION DATES OF the ACS - Greenhouse complex "Cedar" (stage 1, stage 2).Construction of 110kV Borzaya substation and 110kV Barricade-Borzaya KVL (INSTALLATION OF FOUNDATIONS FOR EMERGENCY DIESEL FUEL STORAGE CAPACITY)
# 302101209415
Unscheduled inspection
Start date: 2021-08-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 302101209446
Unscheduled inspection
Start date: 2021-08-30, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora Astrahanskoi oblasti
Purpose of inspection: NOTIFICATION OF THE COMPLETION DATES OF THE OKS Greenhouse complex "Cedar" (stage 1, stage 2).Construction of 110kV Borzaya substation and 110kV Barricade-Borzaya KVL (INSTALLATION OF FOUNDATIONS OF THERMAL STORAGE CAPACITY)
# 302101209424
Unscheduled inspection
Start date: 2021-08-30, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora Astrahanskoi oblasti
Purpose of inspection:
# 302101209402
Unscheduled inspection
Start date: 2021-08-30, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora Astrahanskoi oblasti
Purpose of inspection:
# 302004424200
Unscheduled inspection
Start date: 2020-06-08, end date: 2020-06-18, duration: —
Authority: Gosudarstvennaya inspekciya truda v Astrahanskoi oblasti
Purpose of inspection: Conducting a check on the request
# 30160601752465
Unscheduled inspection
Start date: 2016-07-29, end date: 2016-08-25, duration: —
Authority: Sluzhba stroitelnogo nadzora Astrahanskoi oblasti
Purpose of inspection: purpose notification of the completion of the construction of a capital construction facility Construction of a gas pipeline from the point of embedding with Yangoasker to the Turkeyhouse farm at Astrakhan Regionikryaninsky district 10 km west of Ilyinkayuzhny Ilmen Coin hill Mukhaytasking Verification of compliance of completed works with design documentation building codes rules and technical regulations