Found 1 inspection:

# 24190803427920
Unscheduled inspection
Start date: 2019-06-03, end date: 2019-07-01, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to carry out regional state construction supervision during the reconstruction of the specified capital construction facility on the basis of the received notification 85 dated 28052019 on the beginning of the reconstruction of the capital construction facility The tasks of the audit are to prevent identify and suppress violations of legislation on urban development activities, including technical regulations and project documentation The subject of the audit is to verify the compliance of the work and the construction materials used during the reconstruction of the facility capital construction, as well as the results of such work, the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, verification of the availability of a permit for reconstruction


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.