# 661903981944
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-27, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291307771P1 dated September 04, 2019 The task is to implement the regional state construction supervision to ensure the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291307771P1 dated September 04, 2019
# 661903929222
Unscheduled inspection
Start date: 2019-11-05, end date: 2019-12-02, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: the inspection is carried out in order to implement the inspection program correction 29160114718 dated June 17, 2019. The objectives of this inspection are to carry out regional state construction supervision. The purpose of this inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "32-storey single-section residential building 1 with built-in public premises 1 according to ROM and built-in underground underground parking 3 according to ROM 1 stage of construction" located at Yekaterinburg Nikolay Ostrovsky str. d 2 as well as the results of such work approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation of the project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or information models if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements established by parts 2 3 and 31 Articles 52 of the Urban Planning Code of the Russian Federation
# 661902946185
Unscheduled inspection
Start date: 2019-08-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902920669
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-16, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program 29170112316 ed. 4 dated November 28, 2018. The objectives of this inspection are the implementation of regional state construction supervision. The purpose of this inspection is to verify the compliance of the work and applicable building materials during the construction of a capital construction facility "Stage 1 construction completion of the building in axes 200 280A1A11 from the structure of the facility completion of construction of part of the facility unfinished construction for the placement of commercial premises and parking in the basement" located at the address Yekaterinburg Oktyabrsky district Kuibyshev St. house 36 the results of such work meet the requirements of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 The Urban Planning Code of the Russian Federation
# 661902848232
Unscheduled inspection
Start date: 2019-07-08, end date: 2019-07-19, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose control of the execution of the previously issued instruction on the elimination of the identified violation of mandatory requirements 291707127 P dated March 01, 2019 Task implementation of state construction supervision Subject to the implementation of the previously issued instruction on the elimination of the identified violation of mandatory requirements 291707127 P dated March 01, 2019
# 661902722998
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-07-08, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: the inspection is carried out in order to implement the inspection program 291601147181 dated January 17, 2019. The objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "32-storey single-section residential building 1 with built-in public premises 1 according to ROM and built-in underground underground parking 3 according to ROM 1 stage of construction" located at Yekaterinburg Nikolay Ostrovsky str. d 2 the results of such work meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661902723063
Unscheduled inspection
Start date: 2019-05-21, end date: 2019-05-31, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: the inspection is carried out in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607159P1 dated March 19, 2019. The objectives of this audit are the implementation of regional state construction supervision. The purpose of this audit is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607159P1 dated March 19, 2019
# 661902486302
Unscheduled inspection
Start date: 2019-02-11, end date: 2019-03-11, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose implementation of the inspection program 29160152418 dated 14122018 Task implementation of regional state construction supervision Subject verification of compliance of work and construction materials used in the construction of the capital construction facility "Residential development in the area of Krasnoarmeyskaya Ordzhonikidze streets in Verkhnyaya Pyshma, Sverdlovsk region, House 2" located at the address Sverdlovsk region, Verkhnyaya Pyshma, the results of such work with the requirements of design documentation in including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661902486264
Unscheduled inspection
Start date: 2019-02-11, end date: 2019-03-11, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose implementation of the inspection program 29160153718 dated 18122018 Task implementation of regional state construction supervision Subject verification of compliance of work and construction materials used in the construction of the capital construction facility "Residential development in the area of Krasnoarmeyskaya Ordzhonikidze streets in Verkhnyaya Pyshma, Sverdlovsk region, House 1" located at the address Sverdlovsk region, Verkhnyaya Pyshma city of the results of such work with the requirements of design documentation in including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661902495805
Unscheduled inspection
Start date: 2019-02-18, end date: 2019-03-15, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program 29170112316 of November 28, 2018 Tasks implementation of regional state construction supervision Subject to verification of compliance of work and construction materials used in the construction of a capital construction facility with the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used as well as the availability of a construction permit and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661902507036
Unscheduled inspection
Start date: 2019-02-20, end date: 2019-03-20, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: the inspection is carried out in order to implement the inspection program 291601147181 dated January 17, 2019. The objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "32-storey single-section residential building 1 with built-in public premises 1 according to ROM and built-in underground underground parking 3 according to ROM 1 stage of construction" located at Yekaterinburg Nikolay Ostrovsky str. d 2 the results of such work meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661801911454
Unscheduled inspection
Start date: 2018-10-09, end date: 2018-11-06, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to implement the inspection program 29160114718 dated April 28, 2018. The objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "32-storey single-section residential building 1 with built-in public premises 1 according to ROM and built-in underground parking lot 3 according to ROM 1 stage of construction" located at Yekaterinburg Nikolay Ostrovsky str. d 2 the results of such work meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation Federations
# 661801070013
Unscheduled inspection
Start date: 2018-09-10, end date: 2018-10-05, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to implement the inspection program 29160134018 dated August 09, 2018. The objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of the work and construction materials used in the construction of the capital construction facility "Reconstruction of the hotel building into a residential building at 6a Mashinostroiteley str. in Verkhnyaya Pyshma, Sverdlovsk region" located at the address Sverdlovsk region, Verkhnyaya Pyshma, Mashinostroiteley Street 6a, the results of such work meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661801213655
Unscheduled inspection
Start date: 2018-09-12, end date: 2018-09-24, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to control the execution of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607457 P1 dated July 23, 2018 The objectives of this inspection are the implementation of regional state construction supervision The subject of this inspection is the fulfillment of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607457 P1 dated July 23, 2018
# 661800484800
Unscheduled inspection
Start date: 2018-07-02, end date: 2018-06-27, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to implement the inspection program 29160114718 dated April 28, 2018. The objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of the work and construction materials used in the construction of the capital construction facility "32-storey single-section residential building 1 with built-in public premises 1 according to ROM and built-in underground parking lot 3 according to ROM 1 stage of construction" located at Yekaterinburg Nikolay Ostrovsky str. d 2 the results of such work meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code the Code of the Russian Federation
# 661800378059
Unscheduled inspection
Start date: 2018-05-17, end date: 2018-06-13, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program 29170112316 of February 02, 2018 Tasks implementation of regional state construction supervision Subject to verification of compliance of work and construction materials used in the construction of a capital construction facility with the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipment of a capital construction facility with metering devices for energy resources used as well as the availability of a permit for the construction and fulfillment of the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661800387004
Unscheduled inspection
Start date: 2018-05-24, end date: 2018-06-21, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: the inspection is carried out in order to implement the inspection program 29160150416 dated December 28, 2016. The objectives of this inspection are the implementation of regional state construction supervision. The subject of this inspection is to verify the compliance of the work and construction materials used in the construction of the capital construction facility "Stage 2 of the construction of section 12345 of the Residential development facility at the address Sverdlovsk region, Verkhnyaya Pyshma, Uspensky Ave 113b 1 and 2 stages of construction" located at the address Sverdlovsk region, Verkhnyaya Pyshma, Uspensky Prospekt house 113 b the results of such work meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation
# 661800201497
Unscheduled inspection
Start date: 2018-04-12, end date: 2018-05-09, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of the previously issued order on the elimination of the identified violation of mandatory requirements 29170772P dated February 16, 2018 Tasks implementation of regional state construction supervision Subject to the implementation of the previously issued order on the elimination of the identified violation of mandatory requirements 29170772P dated February 16, 2018
# 661800221612
Unscheduled inspection
Start date: 2018-03-26, end date: 2018-04-06, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: the inspection is carried out in order to implement the inspection program 29160150416 dated December 28, 2016. The objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Stage 2 of the construction of section 12345 of the Residential development facility at the address Sverdlovsk region, Verkhnyaya Pyshma, Uspensky Ave 113b 1 and 2 stages of construction" located at the address Sverdlovsk region, Verkhnyaya Pyshma, Uspensky Ave. house 113 b the results of such work meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation
# 661800035694
Unscheduled inspection
Start date: 2018-02-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661800001110
Unscheduled inspection
Start date: 2018-01-22, end date: 2018-02-16, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the inspection program 29160150416 dated December 28, 2016. The objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of the work and the construction materials used in the construction of the capital construction facility "Stage 2 of the construction of section 12345 of the Residential development facility at the address Sverdlovsk region, Verkhnyaya Pyshma, Uspensky Ave 113b 1 and 2 stages of construction" located at the address Sverdlovsk region, Verkhnyaya Pyshma, Uspensky Prospekt house 113 b the results of such work meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation
# 66170802567641
Unscheduled inspection
Start date: 2017-10-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66170802572116
Unscheduled inspection
Start date: 2017-09-25, end date: 2017-10-20, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: the inspection is carried out in order to implement the inspection program 29160150416 dated December 28, 2016. The objectives of this inspection are the implementation of regional state construction supervision. The subject of this inspection is to verify the compliance of the work and the construction materials used in the construction of a capital construction facility
# 66170701870921
Unscheduled inspection
Start date: 2017-08-10, end date: 2017-08-25, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program dated December 28, 2016 29160150416 the objectives of this inspection are the implementation of regional state construction supervision. The purpose of this inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Stage 2 of the construction of section 12345 of the Residential development facility at the address Sverdlovsk region, Verkhnyaya Pyshma, Uspensky Ave 113b 1 and 2 stages of construction" located at the address Sverdlovsk region Verkhnyaya Pyshma, Uspensky Ave. 113b the results of such work meet the requirements of technical regulations sanitary and epidemiological rules and regulations safety rules and state standards of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources as well as the availability of a construction permit and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 66170701829957
Unscheduled inspection
Start date: 2017-07-31, end date: 2017-08-11, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: the inspection is carried out in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291605387P1 dated June 20, 2017. The objectives of this audit are the implementation of regional state construction supervision The subject of this audit is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291605387P1 dated June 20, 2017
# 66170701683050
Unscheduled inspection
Start date: 2017-06-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66170701648197
Unscheduled inspection
Start date: 2017-05-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66170701579812
Unscheduled inspection
Start date: 2017-05-05, end date: 2017-06-05, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The subject of this audit is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Stage 1 construction completion of the building in axes 200 280A1A11 from the structure of the facility completion of the construction of a part of the facility under construction to accommodate commercial premises and parking in the basement" located at the address Yekaterinburg Oktyabrsky district Kuibyshev St. house 36 results of such work the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 66170701580105
Unscheduled inspection
Start date: 2017-05-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66170701546863
Unscheduled inspection
Start date: 2017-04-17, end date: 2017-04-28, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program 29170112316 ed. 1 dated October 10, 2016. The objectives of this inspection are the implementation of regional state construction supervision. The purpose of this inspection is to verify the compliance of work and applicable building materials during the construction of a capital construction facility "Stage 1 construction completion of a building in axes 200 280A1A11 from the structure of the facility completion of construction of part of the facility unfinished construction for the placement of commercial office premises and parking in the basement" located at the address Yekaterinburg Oktyabrsky district Kuibyshev St. house 36 the results of such work meet the requirements of technical regulations fire safety requirements safety rules and state standards of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used as well as the availability of a permit for construction and fulfillment of the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 66170701461403
Unscheduled inspection
Start date: 2017-04-03, end date: 2017-04-14, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 6 To establish that this inspection is carried out in order to implement the inspection program dated October 10, 2016 29170112316 ed 1 the objectives of this inspection are the implementation of regional state construction supervision
# 66170701505138
Unscheduled inspection
Start date: 2017-04-24, end date: 2017-05-22, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program 29160119116 dated June 21, 2016. The objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of the work and applicable building materials during the construction of a capital construction facility
# 66170701430953
Unscheduled inspection
Start date: 2017-03-13, end date: 2017-03-24, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program 29160119116 of 17062016. The purpose of this inspection is to carry out regional state construction supervision. The purpose of this inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Residential development within the boundaries of Kirovsky Zagvozkina Teatralnaya Vostochnaya Streets in Berezovsky, Sverdlovsk region, 1st stage of construction of Section 4 5" located at Berezovsky, Sverdlovsk Region, Within the boundaries of Kirovsky Zagvozkina Teatralnaya Vostochnaya Streets, the results of such work meet the requirements of technical regulations, fire safety requirements, safety rules and state standards of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of Parts 2 and 3 Articles 52 of the Urban Planning Code of the Russian Federation
# 66170701464023
Unscheduled inspection
Start date: 2017-03-27, end date: 2017-04-07, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: this audit is conducted in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291605015P1 dated February 22, 2017. The objectives of this audit are the implementation of regional state construction supervision The subject of this audit is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291605015P1 dated February 22, 2017
# 66170701378888
Unscheduled inspection
Start date: 2017-02-13, end date: 2017-03-13, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to implement the notification of the developer about the start of construction of the capital construction facility, the objectives of this inspection are to carry out regional state construction supervision. The purpose of this inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Stage 1 construction completion of the building in axes 200 280A1A11 from the structure of the facility completion of the construction of a part of the unfinished object construction for the placement of commercial premises and parking in the basement" located at the address Yekaterinburg Oktyabrsky district Kuibyshev St. house 36 the results of such work meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of the article 52 of the Urban Planning Code of the Russian Federation
# 66170701333455
Unscheduled inspection
Start date: 2017-02-01, end date: 2017-03-02, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the inspection program 29160150416 dated December 28, 2016, the tasks of which are to carry out state construction supervision. The subject of this inspection is to verify the compliance of the work and applicable building materials during the construction of a capital construction facility
# 66170701300779
Unscheduled inspection
Start date: 2017-01-30, end date: 2017-02-24, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program 29160119116 of 17062016, the tasks of which are to carry out state construction supervision. The purpose of this inspection is to verify the compliance of the work and applicable building materials during the construction of a capital construction facility
# 66160701214238
Unscheduled inspection
Start date: 2016-12-12, end date: 2016-12-23, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is carried out in order to monitor the implementation of the previously issued order on the elimination of identified violations of mandatory requirements 291604723P1 dated November 11, 2016
# 66160700156313
Unscheduled inspection
Start date: 2016-09-07, end date: 2016-09-16, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The subject of this audit is to verify the compliance of the performance of works and applicable building materials during the construction of a capital construction facility with the results of such work with building codes and rules safety rules and state standards as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities to establish that this audit is carried out in order to implementation of the inspection program, the tasks of which are the implementation of state construction supervision