Found 65 inspections:

# 001902566960
Unscheduled inspection
Start date: 2019-03-11, end date: —, duration:
Authority:
Purpose of inspection:


# 742005187783
Unscheduled inspection
Start date: 2020-10-22, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742004452053
Unscheduled inspection
Start date: 2020-07-16, end date: —, duration:
Authority:
Purpose of inspection:


# 742004423512
Unscheduled inspection
Start date: 2020-06-09, end date: 2020-06-15, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po zavershennym etapam ustroistva naruzhnyh i vnutrennih kladochnyh rabot krovli okon i lodzhii vitrazhei zavershennym etapam ustroistva sistem EO OV ViK a takzhe lifta proverka vypolneniya norm pozharnoi i sanitarnoepidemiologicheskoi bezopasnosti obespechenie dostupa malomobilnyh grupp naseleniya i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 2 3 i 31 st52 Gradostroitelnogo kodeksa RF


# 742004434517
Unscheduled inspection
Start date: 2020-06-22, end date: 2020-06-26, duration: 4
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po montazhu zhelezobetonnyh sten peregorodok perekrytii s sedmogo po desyatyi etazh v processe vypolneniya rabot v osyah «123 AsGs» a takzhe sootvetstvie primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 Gradostroitelnogo Kodeksa RF Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 2 3 i 31 st52 Gradostroitelnogo kodeksa RF


# 742004415710
Unscheduled inspection
Start date: 2020-05-26, end date: 2020-05-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu vhodnyh grupp ustroistvu vnutrennih sten i peregorodok v osyah 14 ustroistvo svetoprozrachnyh konstrukcii v processe proizvodstva rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 742004374132
Unscheduled inspection
Start date: 2020-03-30, end date: —, duration:
Authority:
Purpose of inspection:


# 742004374077
Unscheduled inspection
Start date: 2020-03-30, end date: —, duration:
Authority:
Purpose of inspection:


# 742004343081
Unscheduled inspection
Start date: 2020-03-12, end date: 2020-03-18, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po montazhu zhelezobetonnyh sten peregorodok perekrytii s cokolnogo po chetvertogo po shestoi etazh v processe vypolneniya rabot v osyah «123 AsGs» a takzhe sootvetstvie primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 Gradostroitelnogo Kodeksa RF Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 2 3 i 31 st52 Gradostroitelnogo kodeksa RF


# 742004202772
Unscheduled inspection
Start date: 2020-01-27, end date: —, duration:
Authority:
Purpose of inspection:


# 742004188865
Unscheduled inspection
Start date: 2020-01-20, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741903924367
Unscheduled inspection
Start date: 2019-11-06, end date: 2019-11-12, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po montazhu nesuschih i ograzhdayuschih konstrukcii naruzhnyh i vnutrennih stenovyh panelei plit perekrytiya lestnichnoliftovyh shaht santehkabin ventblokov 810 etazhei konstrukcii tehnicheskogo etazha parapeta i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741903873721
Unscheduled inspection
Start date: 2019-10-23, end date: 2019-10-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of a monolithic reinforced concrete frame of a building in axes 13 brickwork in axes 710 during the production of works of building materials used during the construction reconstruction of a capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741903815225
Unscheduled inspection
Start date: 2019-10-17, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741903572708
Unscheduled inspection
Start date: 2019-09-20, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741902858012
Unscheduled inspection
Start date: 2019-07-12, end date: 2019-07-18, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of building structures from the overlap of the 3rd floor to the overlap of the 6th floor in axes 45 and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of design documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902855388
Unscheduled inspection
Start date: 2019-07-10, end date: 2019-07-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu monolitnyh konstrukcii v osyah 510 do otm +18920 na otm +18920 v processe proizvodstva rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 2 3 i 31 st52 Gradostroitelnogo kodeksa RF


# 741902873891
Unscheduled inspection
Start date: 2019-07-19, end date: 2019-07-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po montazhu konstrukcii zdaniya ot perekrytiya 6go etazha do perekrytiya 10go etazha v osyah 45 i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741902871305
Unscheduled inspection
Start date: 2019-07-23, end date: —, duration:
Authority:
Purpose of inspection:


# 741902822670
Unscheduled inspection
Start date: 2019-07-05, end date: 2019-07-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po montazhu konstrukcii zdaniya ot perekrytiya cokolya do perekrytiya 3go etazha v osyah 45 i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741902889913
Unscheduled inspection
Start date: 2019-07-26, end date: 2019-08-01, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of structures of the technical floor of the parapet in axes 45 and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902739073
Unscheduled inspection
Start date: 2019-05-31, end date: 2019-06-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po montazhu nesuschih i ograzhdayuschih konstrukcii naruzhnyh i vnutrennih stenovyh panelei plit perekrytiya lestnichnoliftovyh shaht santehkabin ventblokov 810 etazhei konstrukcii tehnicheskogo etazha parapeta ustroistvu naruzhnyh setei vodosnabzheniya i vodootvedeniya i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot proektnoi dokumentacii2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741902679602
Unscheduled inspection
Start date: 2019-04-30, end date: 2019-05-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po montazhu nesuschih i ograzhdayuschih konstrukcii naruzhnyh i vnutrennih stenovyh panelei plit perekrytiya lestnichnoliftovyh shaht santehkabin ventblokov 47 etazhei i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741902626840
Unscheduled inspection
Start date: 2019-04-10, end date: 2019-04-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu monolitnyh konstrukcii v osyah 56 na otm + 9920 ustroistvu plity perekrytiya do otm +6920 v osyah 78 ustroistvu diafragmy zhestkosti do otm 4120 v osyah 910 i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 2 3 i 31 st52 Gradostroitelnogo kodeksa RF


# 741902634327
Unscheduled inspection
Start date: 2019-04-16, end date: 2019-04-22, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po montazhu nesuschih i ograzhdayuschih konstrukcii naruzhnyh i vnutrennih stenovyh panelei plit perekrytiya lestnichnoliftovyh shaht santehkabin ventblokov 13 etazhei i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741902663637
Unscheduled inspection
Start date: 2019-04-25, end date: 2019-05-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu monolitnogo rostverka ustroistvu vnutrennih i naruzhnyh ograzhdayuschih konstrukcii pervogo i vtorogo etazha i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 2 3 i 31 st52 Gradostroitelnogo kodeksa RF


# 001902566960
Unscheduled inspection
Start date: 2019-03-11, end date: 2019-03-13, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu proverki vypolneniya ranee vydannogo predpisaniya ot 07122018 CH6478rpP srok dlya ispolneniya kotorogo istek Zadachami nastoyaschei proverki yavlyaetsya osuschestvlenie meropriyatii po kontrolyu za ustraneniem narushenii ukazannyh v punktah predpisaniya ot 07122018 CH6478rpP Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora


# 741902590152
Unscheduled inspection
Start date: 2019-03-26, end date: 2019-03-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya zavershennogo etapa ustroistva nesuschih konstrukcii 1214 etazhei a takzhe primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva rezultatov takih rabot trebovaniyam proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 2 3 i 31 st52 Gradostroitelnogo kodeksa RF


# 741902603811
Unscheduled inspection
Start date: 2019-03-29, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 001802163502
Unscheduled inspection
Start date: 2018-12-04, end date: 2018-12-07, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out as part of the control and supervision of compliance with industrial safety requirements in the design, construction, operation, conservation and liquidation of hazardous production facilities, manufacture, installation, commissioning, maintenance and repair of technical devices used at hazardous production facilities for compliance with the requirements of the technical regulations of the Customs Union "On the Safety of Machinery and Equipment" approved by the Decision of the Customs Union Commission of October 18, 2011 823 TR CU 0102011


# 741802343648
Unscheduled inspection
Start date: 2018-12-28, end date: 2019-01-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya zavershennogo etapa ustroistva nesuschih konstrukcii odinnadcatogo etazha a takzhe primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a tak zhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741802292065
Unscheduled inspection
Start date: 2018-12-14, end date: 2018-12-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu monolitnogo rostverka vnutrennih i naruzhnyh ograzhdayuschih konstrukcii pervogo i vtorogo etazha i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a tak zhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741802292041
Unscheduled inspection
Start date: 2018-12-14, end date: 2018-12-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu cokolnogo etazha v osyah 910 ustroistvu svainogo osnovaniya v osyah 16 v processe proizvodstva rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a tak zhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741802018484
Unscheduled inspection
Start date: 2018-10-30, end date: —, duration:
Authority:
Purpose of inspection:


# 741800949947
Unscheduled inspection
Start date: 2018-09-11, end date: 2018-09-17, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya ustroistva nesuschih konstrukcii vosmogo etazha a takzhe kladochnyh rabot vnutrennih sten a takzhe primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741800645289
Unscheduled inspection
Start date: 2018-08-21, end date: 2018-08-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu monolitnogo rostverka vnutrennih i naruzhnyh ograzhdayuschih konstrukcii pervogo i vtorogo etazha i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a tak zhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 2 3 i 31 st52 Gradostroitelnogo kodeksa RF


# 741800609000
Unscheduled inspection
Start date: 2018-08-23, end date: 2018-08-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya zavershennyh etapov ustroistva nesuschih konstrukcii sedmogo etazha a takzhe primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741800435446
Unscheduled inspection
Start date: 2018-06-08, end date: 2018-06-15, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu monolitnyh konstrukcii vnutrennih i naruzhnyh sten i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a tak zhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 2 3 i 31 st52 Gradostroitelnogo kodeksa RF


# 741800381026
Unscheduled inspection
Start date: 2018-05-24, end date: 2018-05-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the device of the load-bearing structures of the fourth floor of masonry work of external walls as well as the construction materials used in the construction of a capital construction facility with the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800312770
Unscheduled inspection
Start date: 2018-04-26, end date: 2018-05-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya zavershennogo etapa ustroistva nesuschih konstrukcii tretego etazha a takzhe primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741800187016
Unscheduled inspection
Start date: 2018-03-27, end date: —, duration:
Authority:
Purpose of inspection:


# 741800042122
Unscheduled inspection
Start date: 2018-02-08, end date: —, duration:
Authority:
Purpose of inspection:


# 741800008748
Unscheduled inspection
Start date: 2018-01-26, end date: 2018-02-01, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the waterproofing of the roof in the 67AsGs axes after the actual completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802909185
Unscheduled inspection
Start date: 2017-12-07, end date: 2017-12-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of building structures from the overlap of the 8th floor to the end of the installation of the technical floor in the axes 67AsGs for the installation of similar groups compliance with fire and sanitary epidemiological measures and building materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2 The presence of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802159404
Unscheduled inspection
Start date: 2017-09-11, end date: 2017-09-15, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya montazha 810 etazha tehetazha i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 74170801917192
Unscheduled inspection
Start date: 2017-08-28, end date: 2017-09-01, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of the basement of the 37th floor and the construction materials used in the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170701858905
Unscheduled inspection
Start date: 2017-08-07, end date: 2017-08-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya montazha podvala 1 2 etazha i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 74170701741414
Unscheduled inspection
Start date: 2017-07-10, end date: 2017-07-14, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu kolonn perekrytii lestnichnoliftovyh uzlov 68go etazhei sten peregorodok 56go etazhei teplotrassa okonchanie i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF4 Proverka vypolneniya predpisaniya ot 09062017 g


# 74170701685483
Unscheduled inspection
Start date: 2017-06-19, end date: 2017-06-23, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the monolithic grillage device and the construction materials used in the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701676449
Unscheduled inspection
Start date: 2017-06-09, end date: 2017-06-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po montazhu konstrukcii zdaniya ot perekrytiya 6go etazha do perekrytiya 8go etazha v osyah 67AsGs i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF


# 74170701669005
Unscheduled inspection
Start date: 2017-06-05, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701647402
Unscheduled inspection
Start date: 2017-05-31, end date: 2017-06-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po montazhu korobki zdaniya ustroistvo vtorogo etazha i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF


# 74170701623143
Unscheduled inspection
Start date: 2017-05-23, end date: 2017-05-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of building structures from the overlap of the 4th floor to the overlap of the 6th floor in the axes 67AsGs and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701513972
Unscheduled inspection
Start date: 2017-04-12, end date: 2017-04-18, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of building structures from the overlap of the 2nd floor to the overlap of the 4th floor in the axes 67AsGs and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701567963
Unscheduled inspection
Start date: 2017-04-28, end date: 2017-05-05, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po montazhu korobki zdaniya ustroistvo kirpichnoi kladki ustroistvo monolitnogo perekrytiya vtorogo etazha i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF


# 74170701500657
Unscheduled inspection
Start date: 2017-04-04, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74170701550148
Unscheduled inspection
Start date: 2017-04-20, end date: 2017-04-26, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of columns of floors of stairlift units of the 2nd and 3rd floors of walls of partitions of the basement of the 1st floor of external heat supply networks and building materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701437136
Unscheduled inspection
Start date: 2017-03-15, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74170701419716
Unscheduled inspection
Start date: 2017-03-03, end date: 2017-03-10, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po montazhu korobki zdaniya ustroistvo vtorogo etazha i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF


# 74170701450128
Unscheduled inspection
Start date: 2017-03-20, end date: 2017-03-23, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po montazhu konstrukcii zdaniya ot perekrytiya cokolya do perekrytiya 3go etazha i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF


# 74170701350696
Unscheduled inspection
Start date: 2017-02-27, end date: —, duration:
Authority:
Purpose of inspection:


# 74160701076753
Unscheduled inspection
Start date: 2016-11-07, end date: 2016-11-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu kolonn perekrytii lestnichnoliftovyh uzlov 1go etazha i primenyaemyh stroitelnyh materialov v processe stroitelstva obektov kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanie chch 23 st 52 Gradostroitelnogo kodeksa RF


# 74160701057456
Unscheduled inspection
Start date: 2016-11-01, end date: —, duration:
Authority:
Purpose of inspection:


# 74160700936859
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-10-14, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of foundations of columns of floors of stairlift units of the 1st floor external engineering power supply networks and building materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160700112107
Unscheduled inspection
Start date: 2016-09-12, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.