Found 30 inspections:

# 001800187456
Unscheduled inspection
Start date: 2018-03-19, end date: —, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001800067058
Unscheduled inspection
Start date: 2018-02-12, end date: 2018-02-13, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu vydachi razresheniya na dopusk v ekspluataciyu energoustanovki Zadachami nastoyaschei proverki yavlyaetsya osuschestvlenie meropriyatii po kontrolyu tehnicheskogo sostoyaniya i bezopasnoi ekspluatacii komplektnoi transformatornoi podstancii i kabelnoi linii 04 kV po adresu CHelyabinskaya oblast g Miass ul Ilmenskaya d 81 Predmetom nastoyaschei proverki yavlyaetsyasootvetstvie svedenii soderzhaschihsya v zayavlenii i dokumentah yuridicheskogo lica ili individualnogo predprinimatelya o predostavlenii pravovogo statusa specialnogo razresheniya licenzii na pravo osuschestvleniya otdelnyh vidov deyatelnosti ili razresheniya soglasovaniya na osuschestvlenie inyh yuridicheski znachimyh deistvii esli provedenie sootvetstvuyuschei vneplanovoi proverki yuridicheskogo lica individualnogo predprinimatelya predusmotreno pravilami predostavleniya pravovogo statusa specialnogo razresheniya licenzii vydachi razresheniya soglasovaniya obyazatelnym trebovaniyam a takzhe dannym ob ukazannyh yuridicheskih licah i individualnyh predprinimatelyah soderzhaschimsya v edinom gosudarstvennom reestre yuridicheskih lic edinom gosudarstvennom reestre individualnyh predprinimatelei i drugih federalnyh informacionnyh resursah


# 00170701808696
Unscheduled inspection
Start date: 2017-07-31, end date: 2017-08-02, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu vydachi razresheniya na dopusk v ekspluataciyu energoustanovki na osnovanii zayavleniya rukovoditelya OOO «BiAiDi Grupp» Zadachami nastoyaschei proverki yavlyaetsya osuschestvlenie meropriyatii po kontrolyu tehnicheskogo sostoyaniya i bezopasnoi ekspluatacii energoustanovok 10ti etazhnogo mnogokvartirnogo zhilogo doma so vstroennopristroennymi obektami SKBO II etap stroitelstva raspolozhennyh po adresu CHelyabinskaya oblast g Miass peresechenie ul Lunacharskogo i ul Uralskih Dobrovolcev Predmetom nastoyaschei proverki yavlyaetsyasootvetstvie svedenii soderzhaschihsya v zayavlenii i dokumentah yuridicheskogo lica ili individualnogo predprinimatelya o predostavlenii pravovogo statusa specialnogo razresheniya licenzii na pravo osuschestvleniya otdelnyh vidov deyatelnosti ili razresheniya soglasovaniya na osuschestvlenie inyh yuridicheski znachimyh deistvii esli provedenie sootvetstvuyuschei vneplanovoi proverki yuridicheskogo lica individualnogo predprinimatelya predusmotreno pravilami predostavleniya pravovogo statusa specialnogo razresheniya licenzii vydachi razresheniya soglasovaniya obyazatelnym trebovaniyam a takzhe dannym ob ukazannyh yuridicheskih licah i individualnyh predprinimatelyah soderzhaschimsya v edinom gosudarstvennom reestre yuridicheskih lic edinom gosudarstvennom reestre individualnyh predprinimatelei i drugih federalnyh informacionnyh resursah


# 742101078707
Unscheduled inspection
Start date: 2021-10-06, end date: 2021-10-12, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po ustroistvu vnutrennih inzhenernyh sistem holodnogo i goryachego vodosnabzheniya, otopleniya, vodootvedeniya, po vnutrennim elektromontazhnym rabotam, po ustroistvu uzlov vvoda, ITP, po vnutrennim otdelochnym rabotam mest obschego polzovaniya v blok-sekciyah zhilogo doma BS-1, BS-2, BS-3 v osyah “1–4” i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742101274884
Unscheduled inspection
Start date: 2021-10-29, end date: 2021-11-29, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Proverka zakonchennogo stroitelstvom obekta 1-go etapa stroitelstva (v osyah “1–4”) . 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100672916
Unscheduled inspection
Start date: 2021-09-14, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742100515236
Unscheduled inspection
Start date: 2021-08-27, end date: 2021-09-02, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po razbivke osei zdaniya, pri razrabotke kotlovana, po ustroistvu osnovaniya, po soblyudeniyu protivopozharnyh meropriyatii pod blok-sekcii zhilogo doma v osyah “1–7” i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100337627
Unscheduled inspection
Start date: 2021-07-09, end date: 2021-07-15, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on the installation of load-bearing and enclosing structures (external and internal wall panels, floor slabs, stairwell and elevator shafts, sanitary cabins, ventilation units) of 8-10 floors in block sections of residential buildings BS-1, BS-2, BS-3 in axes “1-4”, pile driving, installation the monolithic foundation slab in the block section of the BS-4 residential building in the “4-5” axes and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the design documentation documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.


# 742100277015
Unscheduled inspection
Start date: 2021-06-15, end date: 2021-06-21, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the installation of load-bearing and enclosing structures (external and internal wall panels, floor slabs, stairwell shafts, sanitary cabins, ventilation units) of floors 4-7 before the start of installation of load-bearing and enclosing structures of the 8th floor in block sections of residential buildings BS-1, BS-2, BS-3 in axes “1-4" and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, according to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100210410
Unscheduled inspection
Start date: 2021-05-18, end date: 2021-05-24, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po montazhu nesuschih konstrukcii 1-3 etazhei (naruzhnye i vnutrennie steny, perekrytiya) do nachala montazha nesuschih i ograzhdayuschih konstrukcii 4-go etazha v blok-sekciyah zhilogo doma BS-1, BS-2, BS-3 v osyah “1–4” i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100181124
Unscheduled inspection
Start date: 2021-04-30, end date: 2021-05-07, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po gorizontalnoi i vertikalnoi gidroizolyacii fundamentov, obratnoi zasypke pazuh kotlovana, po montazhu nesuschih konstrukcii cokolnogo etazha (naruzhnye i vnutrennie steny, perekrytiya) do nachala montazha naruzhnyh i vnutrennih stenovyh panelei 1-go etazha v blok-sekciyah zhilogo doma BS-1 BS-2, BS-3 v osyah “1–4” i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100092391
Unscheduled inspection
Start date: 2021-03-30, end date: 2021-04-05, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on the construction of a pile field, concreting monolithic grillings for block sections of a residential building BS-1, BS-2, BS-3 in the “1-4” axes and the construction materials used during construction, reconstruction of a capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code of the project documentation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742105352576
Unscheduled inspection
Start date: 2021-02-09, end date: —, duration:
Authority:
Purpose of inspection:


# 001800187456
Unscheduled inspection
Start date: 2018-03-19, end date: 2018-03-21, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu vydachi razresheniya na dopusk v ekspluataciyu energoustanovki na osnovanii zayavleniya rukovoditelya OOO BiAiDi Grupp» ish ot 27022018 0746 vh CH2591 ot 28022018 Zadachami nastoyaschei proverki yavlyaetsya osuschestvlenie meropriyatii po kontrolyu tehnicheskogo sostoyaniya i bezopasnoi ekspluatacii vvodnogo raspredelitelnogo ustroistva serii VRU1D2501001sht VRU1D4002281sht VRU1D4002271sht VRU1D1001041sht vnutrikvartirnaya razvodka elprovoda po adresu CHelyabinskaya oblast g Miass ul Ilmenskaya d 81 stroenie 2 Predmetom nastoyaschei proverki yavlyaetsya sootvetstvie svedenii soderzhaschihsya v zayavlenii i dokumentah yuridicheskogo lica ili individualnogo predprinimatelya o predostavlenii pravovogo statusa specialnogo razresheniya licenzii na pravo osuschestvleniya otdelnyh vidov deyatelnosti ili razresheniya soglasovaniya na osuschestvlenie inyh yuridicheski znachimyh deistvii esli provedenie sootvetstvuyuschei vneplanovoi proverki yuridicheskogo lica individualnogo predprinimatelya predusmotreno pravilami predostavleniya pravovogo statusa specialnogo razresheniya licenzii vydachi razresheniya soglasovaniya obyazatelnym trebovaniyam a takzhe dannym ob ukazannyh yuridicheskih licah i individualnyh predprinimatelyah soderzhaschimsya v edinom gosudarstvennom reestre yuridicheskih lic edinom gosudarstvennom reestre individualnyh predprinimatelei i drugih federalnyh informacionnyh resursah


# 741800196157
Unscheduled inspection
Start date: 2018-03-15, end date: 2018-04-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Proverka zakonchennogo stroitelstvom obekta bloksekcii zhilogo doma v osyah 4 6” 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 001800067058
Unscheduled inspection
Start date: 2018-02-12, end date: 2018-02-13, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu vydachi razresheniya na dopusk v ekspluataciyu energoustanovki Zadachami nastoyaschei proverki yavlyaetsya osuschestvlenie meropriyatii po kontrolyu tehnicheskogo sostoyaniya i bezopasnoi ekspluatacii komplektnoi transformatornoi podstancii i kabelnoi linii 04 kV po adresu CHelyabinskaya oblast g Miass ul Ilmenskaya d 81 Predmetom nastoyaschei proverki yavlyaetsyasootvetstvie svedenii soderzhaschihsya v zayavlenii i dokumentah yuridicheskogo lica ili individualnogo predprinimatelya o predostavlenii pravovogo statusa specialnogo razresheniya licenzii na pravo osuschestvleniya otdelnyh vidov deyatelnosti ili razresheniya soglasovaniya na osuschestvlenie inyh yuridicheski znachimyh deistvii esli provedenie sootvetstvuyuschei vneplanovoi proverki yuridicheskogo lica individualnogo predprinimatelya predusmotreno pravilami predostavleniya pravovogo statusa specialnogo razresheniya licenzii vydachi razresheniya soglasovaniya obyazatelnym trebovaniyam a takzhe dannym ob ukazannyh yuridicheskih licah i individualnyh predprinimatelyah soderzhaschimsya v edinom gosudarstvennom reestre yuridicheskih lic edinom gosudarstvennom reestre individualnyh predprinimatelei i drugih federalnyh informacionnyh resursah


# 001800020127
Unscheduled inspection
Start date: 2018-01-25, end date: 2018-01-26, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu vydachi razresheniya na dopusk v ekspluataciyu energoustanovki na osnovanii zayavleniya rukovoditelya OOO BiAiDi Grupp» Zadachami nastoyaschei proverki yavlyaetsya osuschestvlenie meropriyatii po kontrolyu tehnicheskogo sostoyaniya i bezopasnoi ekspluatacii komplektnoi transformatornoi podstancii i kabelnoi linii 04 kV po adresu CHelyabinskaya oblast g Miass ul Ilmenskaya d 81 Predmetom nastoyaschei proverki yavlyaetsya sootvetstvie svedenii soderzhaschihsya v zayavlenii i dokumentah yuridicheskogo lica ili individualnogo predprinimatelya o predostavlenii pravovogo statusa specialnogo razresheniya licenzii na pravo osuschestvleniya otdelnyh vidov deyatelnosti ili razresheniya soglasovaniya na osuschestvlenie inyh yuridicheski znachimyh deistvii esli provedenie sootvetstvuyuschei vneplanovoi proverki yuridicheskogo lica individualnogo predprinimatelya predusmotreno pravilami predostavleniya pravovogo statusa specialnogo razresheniya licenzii vydachi razresheniya soglasovaniya obyazatelnym trebovaniyam a takzhe dannym ob ukazannyh yuridicheskih licah i individualnyh predprinimatelyah soderzhaschimsya v edinom gosudarstvennom reestre yuridicheskih lic edinom gosudarstvennom reestre individualnyh predprinimatelei i drugih federalnyh informacionnyh resursah


# 74170701759478
Unscheduled inspection
Start date: 2017-07-13, end date: 2017-07-19, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po montazhu krovelnyh panelei po ustroistvu gidroizolyacii krovli zhilogo doma v osyah «1012»«AG» 3i etap stroitelstva i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF


# 00170701808696
Unscheduled inspection
Start date: 2017-07-31, end date: 2017-08-02, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu vydachi razresheniya na dopusk v ekspluataciyu energoustanovki na osnovanii zayavleniya rukovoditelya OOO «BiAiDi Grupp» Zadachami nastoyaschei proverki yavlyaetsya osuschestvlenie meropriyatii po kontrolyu tehnicheskogo sostoyaniya i bezopasnoi ekspluatacii energoustanovok 10ti etazhnogo mnogokvartirnogo zhilogo doma so vstroennopristroennymi obektami SKBO II etap stroitelstva raspolozhennyh po adresu CHelyabinskaya oblast g Miass peresechenie ul Lunacharskogo i ul Uralskih Dobrovolcev Predmetom nastoyaschei proverki yavlyaetsyasootvetstvie svedenii soderzhaschihsya v zayavlenii i dokumentah yuridicheskogo lica ili individualnogo predprinimatelya o predostavlenii pravovogo statusa specialnogo razresheniya licenzii na pravo osuschestvleniya otdelnyh vidov deyatelnosti ili razresheniya soglasovaniya na osuschestvlenie inyh yuridicheski znachimyh deistvii esli provedenie sootvetstvuyuschei vneplanovoi proverki yuridicheskogo lica individualnogo predprinimatelya predusmotreno pravilami predostavleniya pravovogo statusa specialnogo razresheniya licenzii vydachi razresheniya soglasovaniya obyazatelnym trebovaniyam a takzhe dannym ob ukazannyh yuridicheskih licah i individualnyh predprinimatelyah soderzhaschimsya v edinom gosudarstvennom reestre yuridicheskih lic edinom gosudarstvennom reestre individualnyh predprinimatelei i drugih federalnyh informacionnyh resursah


# 74170701697398
Unscheduled inspection
Start date: 2017-06-22, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701655284
Unscheduled inspection
Start date: 2017-05-31, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701502676
Unscheduled inspection
Start date: 2017-04-05, end date: 2017-04-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of load-bearing and enclosing structures of the external and internal wall panels of the floor slabs of the 6th and 7th floors prior to the installation of load-bearing and enclosing structures of the 8th floor of a residential building in the axes “1012”“AG” 3rd stage of construction and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations project documentation 2The receipt of a construction permit 3The fulfillment of the requirements of HH 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701428896
Unscheduled inspection
Start date: 2017-03-09, end date: 2017-04-05, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Proverka zakonchennogo stroitelstvom obekta 2ogo etapa stroitelstva zhilogo doma v osyah “59”“AG” 2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF


# 74170701317390
Unscheduled inspection
Start date: 2017-01-27, end date: 2017-02-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of load-bearing and enclosing structures of the external and internal wall panels of the floor slabs of the 6th and 7th floors before the start of the installation of load-bearing and enclosing structures of the 8th floor in the axes “1012”“AB” and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3 requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701162194
Unscheduled inspection
Start date: 2016-12-12, end date: 2016-12-15, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of load-bearing and enclosing structures of the external and internal wall panels of the floor slabs of the 5th and 6th floors prior to the installation of the load-bearing and enclosing structures of the 7th floor in the axes “1012”“AB” and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3 requirements of hr 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701228214
Unscheduled inspection
Start date: 2016-12-14, end date: 2016-12-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po ustroistvu vnutrennih sistem holodnogo i goryachego vodosnabzheniya vodootvedeniya uzlov vvoda boilernoi po ustroistvu elektroschitovoi vnutrennih elektromontazhnyh rabot po soblyudeniyu protivopozharnyh i sanitarnoepidemiologicheskih meropriyatii v osyah “59”“AG” i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF


# 74160701228291
Unscheduled inspection
Start date: 2016-12-20, end date: 2017-01-23, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Proverka zakonchennogo stroitelstvom obekta 2i etap v osyah “59”“AG” 2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF


# 74160701090099
Unscheduled inspection
Start date: 2016-11-17, end date: 2016-11-22, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po ustroistvu naruzhnyh setei vodootvedeniya na uchastke ot kolodca 3 do kolodca 6 zhilogo doma i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF


# 74160700915918
Unscheduled inspection
Start date: 2016-10-04, end date: 2016-10-07, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of load-bearing and enclosing structures of the exterior and interior wall panels of the floor slabs of the 4th floor prior to the installation of the load-bearing and enclosing structures of the 5th floor in the axes “1012”“AB” and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the receipt of a construction permit 3The fulfillment of the requirements of the HH 23 st52 of the Urban Planning Code of the Russian Federation


# 74160700433276
Unscheduled inspection
Start date: 2016-09-15, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.