# 262101383284
Unscheduled inspection
Start date: 2021-11-23, end date: —, duration: 20
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: this inspection is carried out for the purpose of: inspection program dated 10/23/2020 No.15/07-2020 (6-partially 7 stages, final inspection), notices of LLC Construction and Installation Enterprise Optimum reg No.17511/01-04 dated 11/15.21.The objectives of this inspection are to prevent, identify and suppress violations committed by the developer, technical customer, person, carrying out construction of violations of the legislation on urban development, including technical regulations and project documentation. The subject of this review is (underline the necessary):
- compliance with the procedure for conducting construction control, maintaining general and (or) special work logs, executive documentation, drawing up acts of inspection of works, structures, sections of engineering support networks
# 262101215600
Unscheduled inspection
Start date: 2021-10-14, end date: —, duration: 20
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: This inspection is carried out for the purpose of: inspection program dated 10/23/2020 No. 15/07-2020 (stages 6.7), notices of Optimum Construction and Installation Company LLC No. 6.7 dated 10/08/2021.The objectives of this audit are to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, and the person carrying out the construction. The subject of this review is (underline):
- compliance with the procedure for conducting construction control, maintaining general and (or) special work logs, executive documentation, drawing up acts of inspection of works, structures, sections of engineering and technical support networks
# 262100523126
Unscheduled inspection
Start date: 2021-08-23, end date: —, duration: 20
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: This inspection is carried out for the purpose of: notification dated 08/16/2021 vh. №12253/01-04 LLC "SMP Optimum" on the completion of work subject to inspection in accordance with the inspection program from 22.10.2020 № 15/07-2020 (5- stage 3);
The objectives of this audit are to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, and the person carrying out the construction.;
The subject of this review is:
- compliance with the procedure for conducting construction control, maintaining general and (or) special work logs, executive documentation, drawing up acts of inspection of works, structures, sections of engineering and technical support networks;
- compliance with other requirements when performing work established by the design documentation, including requirements regarding energy efficiency and requirements regarding the equipment of the capital construction facility with metering devices for used energy resources;
- compliance with mandatory requirements and (or) requirements established by municipal legal acts
# 262100294048
Unscheduled inspection
Start date: 2021-06-15, end date: —, duration: 20
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: This inspection is carried out for the purpose of: inspection program No. 15/07-2020 dated 10/22/2020, notice of completion of construction of stage (stage 3, stage 4) reg.No. 8443/01-04 dated 06/09/2021. The objectives of this audit are to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, and the person carrying out the construction. The subject of this audit is: compliance with the procedure for conducting construction control, maintaining general and (or) special work logs, executive documentation, drawing up acts of inspection of works, structures, sections of engineering and technical support networks. - compliance with other requirements when performing work established by the design documentation, including requirements regarding energy efficiency and requirements regarding the equipment of the capital construction facility with metering devices for used energy resources
- compliance with mandatory requirements and/or requirements established by municipal legal acts.
# 262100176781
Unscheduled inspection
Start date: 2021-04-26, end date: —, duration: 20
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: this inspection is carried out for the purpose of: notification of LLC SMP Optimum on the completion dates of works that are subject to verification dated 04/16/2021 No. 2 (Stage 2) inspection program dated 10/23/2020 No. 15/07-2020
The objectives of this audit are to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, the person carrying out the construction;
The subject of KNM
- compliance with the procedure for conducting construction control, maintaining general and (or) special work logs, executive documentation, drawing up acts of inspection of works, structures, sections of engineering support networks;
- compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping the capital construction facility with metering devices for energy resources used;
- compliance with mandatory requirements and (or) requirements established by municipal legal acts.
# 262005293877
Unscheduled inspection
Start date: 2020-12-28, end date: —, duration: —
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection:
# 262004280928
Unscheduled inspection
Start date: 2020-02-10, end date: —, duration: —
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection:
# 261904156099
Unscheduled inspection
Start date: 2019-12-26, end date: 2019-12-30, duration: —
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: notification of the municipal government institution "Secondary General Education School 3 named after FA Zubalov" dated 20122/2019 on the completion dates of works subject to inspection during the construction of a capital construction facility Stage VI Installation of engineering networks Stage VII Landscaping stage VIII Final inspection and completion of construction the objectives of this inspection are to prevent identify and suppress violations of the law committed by the developer, the technical customer, the person carrying out the construction on urban planning activities, including technical regulations and design documentation, compliance with the procedure for conducting construction control, maintaining general and or special logs of work, executive documentation, drawing up certificates of inspection of work on structures of sections of engineering and technical support networks, compliance with other requirements when performing work established by design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with appliances accounting of used energy resources compliance with mandatory requirements and or requirements established by municipal legal acts
# 261904003643
Unscheduled inspection
Start date: 2019-11-25, end date: —, duration: —
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection:
# 261903200793
Unscheduled inspection
Start date: 2019-09-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 261801832742
Unscheduled inspection
Start date: 2018-10-03, end date: 2018-10-30, duration: —
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: in order to notify about the completion dates of the works to be checked, Stage 5 Landscaping of the territory of SMP OPTIMUM LLC dated 24092018 150710114, the objectives of this audit are to prevent, identify and suppress violations of urban planning legislation by the developer, the technical customer, and the person carrying out construction, including technical regulations and project documentation. The subject of this audit is compliance with the construction control procedure. general and or special work logs of executive documentation, drawing up certificates of inspection of structures of sections of engineering and technical support networks, compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with mandatory requirements and or requirements established by municipal legal acts
# 261801930102
Unscheduled inspection
Start date: 2018-10-11, end date: 2018-11-07, duration: —
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: notification of the completion dates of the works to be checked stage 4 Installation of engineering networks notification of completion of construction Final inspection of SMP OPTIMUM LLC dated 04102018 55 The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, and the person carrying out the construction. The subject of this inspection is compliance with the procedure for conducting construction control, maintaining general and or special logs of work, executive documentation, drawing up certificates of inspection of work on structures of sections of engineering and technical support networks, compliance with other requirements when performing work established by design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with mandatory requirements and or requirements established by municipal legal acts
# 261800581109
Unscheduled inspection
Start date: 2018-07-20, end date: 2018-08-16, duration: —
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: This audit is conducted in order to review the documents of SMP Optimum LLC on the execution of the previously issued order dated 19062018, 48 the deadline for which expired on 19072018. The objectives of this audit are to establish the fact of elimination of violations committed by SMP Optimum LLC specified in the order dated 19062018. 48 The subject of this audit is the execution of the order dated 19062018. 48
# 26170802980268
Unscheduled inspection
Start date: 2017-12-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 26170802381004
Unscheduled inspection
Start date: 2017-09-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 26170802620278
Unscheduled inspection
Start date: 2017-09-26, end date: 2017-10-23, duration: —
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: the purpose of reviewing the documents of Glavstroy 26 LLC on the execution of a previously issued order dated 28082017, 88, the deadline for which expired on 25092017. The objectives of this audit are to establish the fact of eliminating violations committed by Glavstroy 26 LLC specified in the order dated 28082017. 88the subject of this audit is the execution of the order dated 28082017. 88
# 26170701840597
Unscheduled inspection
Start date: 2017-07-28, end date: 2017-08-11, duration: —
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: This inspection is carried out in order to notify Optimum Construction and Installation Enterprise LLC of the start of construction dated 13071722the objectives of this inspection are to prevent, identify and prevent violations of urban planning legislation by the developer, the technical customer, and the person carrying out the construction, including technical regulations and design documentationthe subject of this inspection is compliance with the work performed and the building materials used during construction reconstruction of the capital construction facility as well as the results of such work to the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the need for a construction permit, compliance with the requirements established by parts 2 3 and 31 of Article 52 of this Code