Found 1 inspection:

# 77170802808448
Unscheduled inspection
Start date: 2017-11-02, end date: 2017-11-29, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: Control over the implementation of the regulation GPN 911 dated 12032016 on the elimination of identified violations of fire safety requirements at the protection facility and to prevent the threat of fire


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.