Found 2 inspections:

# 72160701230924
Unscheduled inspection
Start date: 2016-12-12, end date: 2016-12-16, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the notice dated 06/122016 on completion of construction and reconstruction of the capital construction facility Verification of compliance of the work and the construction materials used during construction, as well as the results of such work, with the requirements of technical regulations and other regulatory legal acts, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used during construction capital construction facility "Commercial sturgeon cultivation plant at 177 km of the Tyumen city entrance from the Baikal highway" Construction of electric power facilities including external supply networks" located at Tyumen region, Tyumen district, Chervishevsky municipality


# 72150600096063
Unscheduled inspection
Start date: 2015-07-28, end date: —, duration:
Authority: SeveroUralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: control over the fulfillment by a legal entity of the instructions previously issued by the Office of Rosprirodnadzor in the Tyumen region to eliminate the identified violations


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.