# 422101454935
Unscheduled inspection
Start date: 2021-12-13, end date: 2021-12-16, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: verification of the compliance of the work performed, the construction materials and products used during the construction of the facility (installation of partitions, installation of heating, ventilation, OPS, fire extinguishing, electrical and finishing work, installation of external engineering networks), as well as the results of such work with the requirements of the design documentation (including changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the Urban Planning Code of the Russian Federation, are part of such project documentation), compliance with the legislation of the Russian Federation on urban planning activities during construction, compliance with the legislation of the Russian Federation on urban planning activities during construction
# 422101455145
Unscheduled inspection
Start date: 2021-12-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 422101378725
Unscheduled inspection
Start date: 2021-11-30, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection:
# 422100627367
Unscheduled inspection
Start date: 2021-09-08, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection:
# 422100434284
Unscheduled inspection
Start date: 2021-08-10, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection:
# 422100538633
Unscheduled inspection
Start date: 2021-08-31, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose: To verify the compliance of the work performed and the construction materials and products used in the course of work with the requirements of the project documentation. The purpose of this audit is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility. Subject: Compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban development
# 422100477085
Unscheduled inspection
Start date: 2021-08-26, end date: —, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: the purpose of checking the compliance of the work performed, the construction materials and products used in the construction of a capital construction facility, as well as the results of such work with the requirements of the design documentation (including taking into account the changes made to the working documentation and which, in accordance with part 1.3 of Article 52 of the Urban Planning Code of the Russian Federation, are part of such design documentation); the task and subject of this audit is compliance with the requirements of the legislation of the Russian Federation on urban planning activities during construction
# 422100476955
Unscheduled inspection
Start date: 2021-08-26, end date: —, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: the purpose of checking the compliance of the work performed, the construction materials and products used in the construction of a capital construction facility, as well as the results of such work with the requirements of the design documentation (including taking into account the changes made to the working documentation and which, in accordance with part 1.3 of Article 52 of the Urban Planning Code of the Russian Federation, are part of such design documentation); the task and subject of this audit is compliance with the requirements of the legislation of the Russian Federation on urban planning activities during construction
# 422100337455
Unscheduled inspection
Start date: 2021-07-13, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Cel: proverka ispolneniya punktov №2, №3 predpisaniya inspekcii № 04-34-20-01 ot 31.05.2021;
zadacha: proverka ustraneniya narushenii pri osuschestvlenii stroitelstva;
predmet: ispolnenie predpisaniya punktov №2, №3 predpisaniya inspekcii № 04-34-20-01 ot 31.05.2021 v srok do 30.06.2021;
# 422100331346
Unscheduled inspection
Start date: 2021-07-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 422100260777
Unscheduled inspection
Start date: 2021-06-21, end date: —, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: cel - proverka sootvetstviya vypolnyaemyh rabot i primenyaemyh stroitelnyh materialov v processe rekonstrukcii (elektromontazhnye raboty, otdelochnye raboty, ventilyaciya, ViK, OPS, blagoustroistvo, tehnologicheskoe oborudovanie) obekta kapitalnogo stroitelstva «g. Kemerovo, ul. Tuhachevskogo, 60/1. Rekonstrukciya nezhilogo zdaniya. Pekarnya», raspolozhennogo po adresu: Kemerovskaya oblast - Kuzbass, g. Kemerovo, ul. Tuhachevskogo, 60/1, a takzhe rezultatov takih rabot proektnoi dokumentacii i proverki vypolneniya trebovanii chastei 2, 3 i 3.1 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii; Zadachei proverki yavlyaetsya soblyudenie trebovanii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti; Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti
# 422100212100
Unscheduled inspection
Start date: 2021-05-18, end date: —, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: the purpose is to verify the conformity of the work performed and the construction materials used during the construction process (electrical installation, security and fire alarm systems, fire extinguishing, porches, stairs, technological equipment, landscaping, external engineering networks) of the capital construction facility "Warehouse" located at: Kemerovo region - Kuzbass, Kemerovo, Tukhachevsky St., 60/1, as well as the results of such work on project documentation and verification of compliance with the requirements of Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; The purpose of verification is compliance with the requirements of the legislation of the Russian Federation on urban development; The subject of verification is compliance with the mandatory requirements of the legislation of the Russian Federation on urban development
# 422100211948
Unscheduled inspection
Start date: 2021-05-18, end date: —, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: the purpose is to verify the conformity of the work performed and the construction materials used during the reconstruction process (floors, electrical work, finishing work, ventilation, VET, OPS, landscaping, technological equipment, external engineering networks) of the capital construction facility "Kemerovo, Tukhachevsky str., 60/1. Reconstruction of a non-residential building. Bakery", located at: Kemerovo region - Kuzbass, Kemerovo, Tukhachevsky str., 60/1, as well as the results of such work on project documentation and verification of compliance with the requirements of parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; The purpose of verification is compliance with the requirements of the legislation of the Russian Federation on urban development; The subject of verification is compliance with mandatory requirements of the legislation of the Russian Federation on urban development activities
# 422100193011
Unscheduled inspection
Start date: 2021-05-11, end date: —, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: in order to verify the compliance of the work performed and the building materials used during the construction of the facility (facade, roof, partitions, external engineering networks, water supply and sewerage systems, OPS, fire extinguishing), as well as the results of such work with the requirements of the design documentation, verification of compliance with the requirements of parts 2, 3, 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; the objective and subject of this audit is compliance with the legislation of the Russian Federation on urban planning activities during construction
# 422100223081
Unscheduled inspection
Start date: 2021-05-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 422100059964
Unscheduled inspection
Start date: 2021-03-24, end date: 2021-03-29, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: the purpose is to verify the conformity of the work performed and the construction materials used during the construction process (electrical installation, finishing work, ventilation, security and fire alarm systems, fire extinguishing, porches, stairs, heating, technological equipment) of the capital construction facility "Warehouse" located at: Kemerovo region - Kuzbass, Kemerovo, ul. Tukhachevsky, 60/1, as well as the results of such work on project documentation and verification of compliance with the requirements of Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; The purpose of verification is compliance with the requirements of the legislation of the Russian Federation on urban development; The subject of verification is compliance with the mandatory requirements of the legislation of the Russian Federation on urban development
# 422100027479
Unscheduled inspection
Start date: 2021-02-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 422105297517
Unscheduled inspection
Start date: 2021-01-15, end date: 2021-01-20, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: the purpose is to verify the conformity of the work performed and the construction materials used during the construction process (windows, doors, gates, electrical work, finishing work, security and fire alarm systems, fire extinguishing, heating, technological equipment) of the capital construction facility "Warehouse" located at: Kemerovo region - Kuzbass, Kemerovo, Tukhachevsky St., 60/1, as well as the results of such work on project documentation and verification of compliance with the requirements of Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; The purpose of verification is compliance with the requirements of the legislation of the Russian Federation on urban development; The subject of verification is compliance with the mandatory requirements of the legislation of the Russian Federation on urban development