# 002004401155
Unscheduled inspection
Start date: 2020-01-22, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya truda v Rostovskoi oblasti
Purpose of inspection:
# 612100062513
Unscheduled inspection
Start date: 2021-03-18, end date: 2021-04-14, duration: 20
Authority: Ministerstvo prirodnyh resursov i ekologii Rostovskoi oblasti
Purpose of inspection: compliance with regulations
# 612004362974
Unscheduled inspection
Start date: 2020-03-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 612004259366
Unscheduled inspection
Start date: 2020-02-17, end date: —, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection:
# 002004401155
Unscheduled inspection
Start date: 2020-01-22, end date: 2020-02-18, duration: —
Authority: Gosudarstvennaya inspekciya truda v Rostovskoi oblasti
Purpose of inspection: a comprehensive and complete study and analysis of the circumstances and facts set out in the information, an objective assessment of the employer's actions and inaction based on the results of the supervisory control measure, and the adoption of inspection response measures within the established authority in strict accordance with current legislation in connection with the appeal received by the State Labor Inspectorate in the Rostov Region from Tverdokhlebova Avx T9520, an employee of JSC TC Horizon on violations of labor rights and legitimate interests by actions or omissions of the employer of JSC "TC Horizon" of the region and its officials, the adoption of inspection response measures within the framework of established powers in strict accordance with current legislation, a written appeal from a citizen 61711820 dated 15012020
# 611903986142
Unscheduled inspection
Start date: 2019-11-05, end date: 2019-11-15, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: the inspection is carried out with the purpose of fulfilling the p11 inspection program Installation of internal and external engineering systems and equipment power supply water supply and sanitation heating ventilation air conditioning communication networks fire extinguishing fire alarm system for notification and evacuation control automation of systems installation of elevators, etc. 3rd stage of construction Internal and external finishing works 3rd stage of construction Filling of window and door openings 3rd stage of construction Installation of internal and external exterior walls and partitions 3rd stage of construction The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The purpose of this audit is to verify compliance with mandatory requirements and or requirements established by municipal legal acts
# 611902843478
Unscheduled inspection
Start date: 2019-06-24, end date: 2019-06-28, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: the inspection is carried out with the purpose of fulfilling the p11 inspection program Installation of internal and external engineering systems and equipment power supply water supply and sanitation heating ventilation air conditioning communication networks fire extinguishing fire alarm system for notification and evacuation control automation of systems installation of elevators, etc. 3rd stage of construction Internal and external finishing works 3rd stage of construction Filling of window and door openings 3rd stage of construction Installation of internal and external external walls and partitions 3rd stage of construction The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The purpose of this audit is to verify compliance with mandatory requirements and or requirements established by municipal legal acts
# 611902753151
Unscheduled inspection
Start date: 2019-05-21, end date: 2019-06-18, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Rostovskoi oblasti
Purpose of inspection: verification of the information contained in the application received by the Main Directorate of the Ministry of Emergency Situations of Russia in the Rostov region vh 5191 dated 23042019
# 611902453252
Unscheduled inspection
Start date: 2019-01-17, end date: 2019-01-25, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: the inspection is carried out in order to fulfill the p11 inspection program Installation of internal and external engineering systems and equipment electricity water supply and sanitation heating ventilation air conditioning communication networks fire extinguishing fire alarm system for notification and evacuation control automation of systems installation of elevators, etc. 3rd stage of construction Internal and external finishing works 3rd stage of construction Filling of window and door openings 3rd stage of construction Installation of internal and exterior walls and partitions 3rd stage of construction the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this audit is to verify compliance with the regulations of state control bodies, municipal control bodies
# 611802147098
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-28, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Rostovskoi oblasti
Purpose of inspection: Monitoring the implementation of the previously issued GPN regulation No. 711 dated April 28, 2018. The object of protection meets fire safety requirements and takes measures based on the results of the audit. Compliance with the instructions of state control bodies, supervision bodies, municipal control bodies
# 611800639506
Unscheduled inspection
Start date: 2018-08-16, end date: 2018-08-17, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out in order to verify the execution of the Order 0101100310 from 09082018 to 24082018 issued by JSC Horizon Shopping ComplexTIN 6165111137 The objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this audit is to verify compliance with the regulations of state control bodies and municipal control bodies
# 611800335334
Unscheduled inspection
Start date: 2018-04-25, end date: 2018-04-28, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Rostovskoi oblasti
Purpose of inspection: on behalf of the Chairman of the Government of the Russian Federation dated March 28, 2018, DMP41776, the object of protection fulfills fire safety requirements and takes measures based on the results of verification of compliance with mandatory requirements and or requirements established by municipal legal acts
# 61160701211552
Unscheduled inspection
Start date: 2016-11-21, end date: 2016-12-02, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: the purpose of the p3 Program for conducting inspections in case 01011003the task is to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentationsubject verification of the conformity of work performed and construction materials used during the construction reconstruction of a capital construction facility as well as the results of such work are required by the technical regulations of the project documentation
# 61160700062759
Unscheduled inspection
Start date: 2016-08-10, end date: —, duration: —
Authority: —
Purpose of inspection: