Found 2 inspections:

# 22170801928155
Unscheduled inspection
Start date: 2017-08-24, end date: 2017-08-24, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to verify the information contained in Notice 3 dated 11082017 BX 31VP4061 dated 11082017 on the completion dates of the works subject to verification, the objectives of this audit are to prevent identify and suppress violations of urban planning legislation by the developer, including the requirements of technical regulations and design documentationthe subject of this audit is to verify the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility construction as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with the mandatory requirements for a construction permit and the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 22170701301407
Unscheduled inspection
Start date: 2017-01-13, end date: —, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.