# 742004395267
Unscheduled inspection
Start date: 2020-04-20, end date: 2020-05-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed capital construction facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741801878938
Unscheduled inspection
Start date: 2018-09-24, end date: 2018-10-19, duration: —
Authority: Gosudarstvennaya inspekciya truda v CHelyabinskoi oblasti
Purpose of inspection: This audit is carried out in order to carry out federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms, including labor protection, remuneration, fulfillment by the employer of obligations to ensure mandatory conditions and labor protection in connection with the citizens' appeal to the hotline dated 20092018 74836318 and
# 74180803037183
Unscheduled inspection
Start date: 2018-01-19, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170802975015
Unscheduled inspection
Start date: 2017-12-19, end date: 2017-12-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the completed process of arranging the metal structures of the transition as well as the construction materials used during the construction of the capital construction facility with the results of such work with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802484480
Unscheduled inspection
Start date: 2017-09-21, end date: 2017-09-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the construction of the metal structures of the transition as well as the construction materials used during the construction of the capital construction facility with the results of such work with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170701906057
Unscheduled inspection
Start date: 2017-08-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160701077235
Unscheduled inspection
Start date: 2016-11-08, end date: 2016-11-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of the installation of the frame of the second floor, the installation of storm sewer systems, as well as the construction materials used during the construction of the capital construction facility, the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700951073
Unscheduled inspection
Start date: 2016-10-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160700142885
Unscheduled inspection
Start date: 2016-09-21, end date: 2016-09-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The completed stages of installation of foundation beams along the contour, with the exception of the "A" axis of the basement floor slabs, as well as the construction materials used during the construction of the capital construction facility, the results of such work, meet the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160601744432
Unscheduled inspection
Start date: 2016-08-10, end date: 2016-08-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the completed stage of the foundation installation in the "GD" axes of the basement wall installation process, as well as the construction materials used during the construction of the capital construction facility, the results of such work with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation