Found 26 inspections:

# 542101476510
Unscheduled inspection
Start date: 2021-12-23, end date: 2022-01-27, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Novosibirskoi oblasti
Purpose of inspection: verification of the previously issued instruction to the person being checked on the elimination of the detected violation dated 11/15/2021 № 1-3/2325, the deadline for which is 12/21/2021, verification of the elimination of violations and compliance with the requirements (measures) specified in the instruction dated 11/15/2021 № 1-3/2325., compliance with the instructions of state control (supervision) bodies, municipal control bodies


# 782100440092
Unscheduled inspection
Start date: 2021-08-09, end date: —, duration:
Authority:
Purpose of inspection:


# 222100397633
Unscheduled inspection
Start date: 2021-07-29, end date: —, duration: 2
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: To establish that this inspection is being carried out in order to implement the inspection program dated 04/08/2021 No. 3, according to the notice of completion dates dated 06/16/2021 No. 4 (ex. dated 06/16/2021 No. 62/VP/1388), dated 07/18/2019 No. 3 (ex. dated 07/22/2019 No. 62/VP/4680), dated 05/28/2019 No. 1 (ex. dated 05/29/2019 No. 62/VP/3951),dated 05/28/2019 No. 2 (ex. dated 05/29/2019 No. 62/VP/3950) The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including the requirements of the project documentation; 7. The subject of this audit is: Part 3 of art. 54 of the GRK RF


# 222100362200
Unscheduled inspection
Start date: 2021-07-29, end date: —, duration: 2
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: Purpose: implementation of the inspection program dated 11/18/2020 No. 1, according to the notice of completion dates dated 06/16/2021 No. 4 (ex. dated 06/16/2021 No. 62/VP/1384). Tasks: prevention, detection and suppression of violations of the legislation on urban development, including the requirements of the project documentation; Subject of verification: Part 3 of art. 54 of the GRK RF


# 222100270685
Unscheduled inspection
Start date: 2021-06-09, end date: —, duration: 2
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: purpose: implementation of the inspection program dated 11/18/2020 No. 1, according to the notice of completion dates dated 05/20/2021 No. 3 (ex. dated 05/21/2021 No. 62/VP/1187) The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including the requirements of the project documentation; The subject of this audit is: paragraphs 1, 2, 3 of part 2 of art.54 of the GRK RF


# 542100265136
Unscheduled inspection
Start date: 2021-06-07, end date: 2021-06-18, duration: 9
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Novosibirskoi oblasti
Purpose of inspection: Purpose: to verify the fulfillment of the previously issued regulation No. 1-6/400 dated 03/16/2021, the deadline for which expired on 05/11/2021, Tasks: checking the elimination of violations and the fulfillment of the requirements (measures) specified in Regulation No. 1-6/400 dated 03/16/2021. Subject: compliance with the regulations of state control (supervision) bodies and municipal control bodies


# 222100318605
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to verify the information contained in the notices on the completion dates of works subject to inspection dated 04/28/2021 No. 1 (ex. dated 04/28/2021 No. 62/VP/1003) The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including the requirements of the project documentation; The subject of this audit is: paragraphs 1, 2, 3 of part 2 of art.54 of the GRK RF


# 222100318656
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to verify the information contained in the notices of completion of works subject to inspection dated 05/20/2021 No. 2 (ex. dated 05/21/2021 No. 62/VP/1185) The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including the requirements of the project documentation; The subject of this audit is: paragraphs 1, 2, 3 of part 2 of art.54 of the GRK RF


# 222100143575
Unscheduled inspection
Start date: 2021-04-13, end date: 2021-04-14, duration: 2
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: Purpose: implementation of the inspection program dated 11/18/2020 No. 1, according to the notice of completion dates dated 03/31/2021 No. 2 (ex. dated 03/31/2021 No. 62/VP/725) The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including the requirements of the project documentation; The subject of this audit is: paragraphs 1, 2, 3 of part 2 of art.54 of the GRK RF


# 542105294687
Unscheduled inspection
Start date: 2021-01-11, end date: 2021-01-22, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Novosibirskoi oblasti
Purpose of inspection: This check is carried out for the purpose of: verifying the fulfillment of the previously issued order dated 09/28/2020 No. 2/1518, the deadline for which expired on 11/20/2020 (hereinafter referred to as the order); The objectives of this audit are: – verification of the elimination of violations and the fulfillment of the requirements (measures) specified in the regulation; The subject of this inspection is: – the execution of Regulation No. 2/1518 dated 09/28/2020 issued by the Inspectorate of the State Construction Supervision of the Novosibirsk region.


# 222005269703
Unscheduled inspection
Start date: 2020-12-24, end date: 2020-12-25, duration: 2
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: The purpose is to implement the inspection program from 18112020 1The objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities, including the requirements of project documentation. The subject of this audit is n 1 2 3 h2 ST54 GRK RF


# 542005267297
Unscheduled inspection
Start date: 2020-12-11, end date: 2020-12-24, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Novosibirskoi oblasti
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the previously issued order dated 12112020 219981, the deadline for which is 14122020, hereinafter referred to as the order, based on the notice of elimination of violations received by the inspectorate from LLC "Spetsstroy" VH 574947 dated 30112020, the request for verification received by the inspectorate from LLC "Spetsstroy" VH 574547 dated 30112020the tasks of this inspection are to verify the elimination of violations and compliance with the requirements of the measures specified in the prescriptionthe subject of this inspection is the fulfillment of the prescription dated 12112020 219981 issued by the Inspectorate of the State Construction Supervision of the Novosibirsk region


# 542005209712
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-06, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Novosibirskoi oblasti
Purpose of inspection: The purpose is to verify the fulfillment of the previously issued regulation dated 11092020 111365, the deadline for which expired on 16102020 hereinafter referred to as the prescriptionthe task is to verify the elimination of violations and the fulfillment of the requirements of the measures specified in the prescriptionthe subject is the fulfillment of regulation 111365 dated 11092020 issued by the Inspectorate of the State Construction Supervision of the Novosibirsk region


# 542005246091
Unscheduled inspection
Start date: 2020-11-30, end date: 2020-12-11, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Novosibirskoi oblasti
Purpose of inspection: The purpose is to verify the fulfillment of the previously issued regulation dated 06102020 171598, the deadline for which expired on 09112020, hereinafter referred to as the instruction, Tasks are to verify the elimination of violations and the fulfillment of the requirements of the measures specified in the instruction Subject is the fulfillment of regulation 171598 dated 06102020 issued by the Inspectorate of the State Construction Supervision of the Novosibirsk Region


# 542004451949
Unscheduled inspection
Start date: 2020-07-08, end date: 2020-07-17, duration: 8
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Novosibirskoi oblasti
Purpose of inspection: Purpose verification of the fulfillment of the previously issued regulation 17530 dated 15052020 deadline 01072020the task is to verify the elimination of violations and the fulfillment of the requirements of the measures specified in the regulation The subject is the fulfillment of regulation 17530 dated 15052020 issued by the Inspectorate of the State Construction Supervision of the Novosibirsk region


# 542004455894
Unscheduled inspection
Start date: 2020-07-13, end date: —, duration:
Authority:
Purpose of inspection:


# 222004414304
Unscheduled inspection
Start date: 2020-05-27, end date: 2020-05-29, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to implement the inspection program dated 12092019 1, the objectives of this audit are to prevent, identify and suppress violations of legislation on urban planning activities, including the requirements of project documentation. The subject of this audit is n 1 2 3 ch2 st54 GrK RF


# 222004410908
Unscheduled inspection
Start date: 2020-05-28, end date: —, duration:
Authority:
Purpose of inspection:


# 222004415228
Unscheduled inspection
Start date: 2020-05-21, end date: 2020-05-22, duration: 2
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to implement the inspection program dated 22052019 1, as well as to verify the information contained in the notices on the completion dates of works subject to inspection dated 16042020 7 bx dated 16042020 62VP792, the objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities, including the requirements of project documentation. The subject of this audit is n 1 2 3 h2 st54 GrK Russian Federation


# 542004368982
Unscheduled inspection
Start date: 2020-03-23, end date: —, duration:
Authority:
Purpose of inspection:


# 542004368969
Unscheduled inspection
Start date: 2020-03-25, end date: 2020-05-18, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Novosibirskoi oblasti
Purpose of inspection: The purpose is to verify the fulfillment of the previously issued regulation 26128 of 10022020 Tasks are to verify the elimination of violations and the fulfillment of the requirements of the measures specified in the regulation Subject is the fulfillment of regulation 26128 of 10022020 issued by the Inspectorate of the State Construction Supervision of the Novosibirsk region


# 222004344105
Unscheduled inspection
Start date: 2020-03-11, end date: 2020-03-11, duration: 1
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: The purpose is to verify the information contained in the notice dated 28022020 1 VX 62VP425 dated 28022020 on the elimination of violations specified in the instruction dated 05022020 K4GSNTHE objectives of this audit are to prevent identify and suppress violations of the law on urban development by the person carrying out the construction, including the requirements of the project documentation. The subject of this audit is pp 1 ch2 st54 GRK RF checking the compliance of the work and the applied construction materials during the construction of a capital construction facility, as well as the results of such work, meet the requirements of the project documentation


# 222004258684
Unscheduled inspection
Start date: 2020-02-04, end date: —, duration:
Authority:
Purpose of inspection:


# 001800241750
Unscheduled inspection
Start date: 2018-04-04, end date: 2018-04-06, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The audit is conducted in order to monitor the implementation of paragraphs 16 of the previously issued instruction on the elimination of identified violations dated 06022018 2216022018, the deadline for which has expired. The task of this audit is to evaluate measures to eliminate violations by a legal entity, its head and other officials of the requirements established by Federal Law No. 21071997 116FZ "On Industrial Safety of Hazardous Production Facilities" by other federal and adopted in accordance with them and other regulatory legal acts of the Russian Federation, the subject of this audit is the fulfillment of paragraphs 16 of the instruction from 06022018 2216022018 of officials of the Siberian Directorate of Rostechnadzor, the deadline for which has expired.


# 00180803032639
Unscheduled inspection
Start date: 2018-01-15, end date: 2018-02-09, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to comply with Rostechnadzor Order No. 85 dated March 15, 2017 "On inspections of organizations operating tower cranes" based on the instruction of Deputy Prime Minister of the Russian Federation AG Khloponin dated February 8, 2017 AHP9682 "On the organization and conduct of unscheduled inspections of organizations operating tower cranes from 2017 to 2019" The objectives of the inspection are to prevent identification and suppression of violations of mandatory requirements established by federal laws and other regulatory acts of the Russian Federation in the field of industrial safety and technical regulation of mandatory requirements taking measures to eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have committed violations of the requirements of federal laws and other regulatory legal acts The subject of verification is compliance by a legal entity in the process of implementation compliance with mandatory industrial safety requirements in the design construction operation conservation and liquidation of hazardous production facilities manufacture installation commissioning maintenance and repair of technical devices for lifting cranes used at hazardous production facilities compliance with the specified requirements of buildings structures equipment and materials used


# 22170701845331
Unscheduled inspection
Start date: 2017-07-27, end date: 2017-08-24, duration:
Authority: Ministerstvo prirodnyh resursov i ekologii Altaiskogo kraya
Purpose of inspection: the inspection is carried out in order to monitor the execution of the order on the elimination of violations of environmental legislation 99 issued 16022017 by the State inspector of the Altai Territory in the field of environmental protection Cherenkov AR, whose deadline has expired 07072017 the objectives of this inspection are to prevent and or eliminate violations of mandatory requirements in the field of environmental protection reflected in the previously issued regulation the subject of this inspection is the fulfillment of regulations of state bodies supervision


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.