# 222005273375
Unscheduled inspection
Start date: 2020-12-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 222005204642
Unscheduled inspection
Start date: 2020-10-27, end date: —, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection:
# 222005204621
Unscheduled inspection
Start date: 2020-10-27, end date: 2020-10-29, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu realizacii programmy provedeniya proverok ot 12092019 1Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya p 1 2 3 ch2 st54 GrK RF
# 222004478205
Unscheduled inspection
Start date: 2020-08-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 222004512900
Unscheduled inspection
Start date: 2020-08-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 222004478301
Unscheduled inspection
Start date: 2020-08-05, end date: 2020-08-07, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu realizacii programmy provedeniya proverok ot 12092019 1 po izvescheniyu o srokah zaversheniya rabot ot 21072020 6 vh ot 21072020 62VP1490Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii
# 222004512901
Unscheduled inspection
Start date: 2020-08-31, end date: 2020-09-02, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu realizacii programmy provedeniya proverok ot 23102019 1 po izvescheniyu o srokah zaversheniya rabot ot 17062020 4 vh ot 17062020 62VP1236 ot 21072020 5 vh ot 21072020 62VP1487 ot 21072020 6 vh ot 21072020 62VP1489 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya p 1 2 3 ch2 st54 GrK RF
# 222004459807
Unscheduled inspection
Start date: 2020-07-17, end date: 2020-07-22, duration: 4
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu proverki svedenii soderzhaschihsya v izveschenii ob okonchanii stroitelstva obekta kapitalnogo stroitelstva ot 08072020 1 vh ot 08062020 62VP1386 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya p 1 2 3 ch2 st54 GrK RF
# 222004427798
Unscheduled inspection
Start date: 2020-06-25, end date: 2020-06-29, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to implement the inspection program dated 12092019 1, the objectives of this audit are to prevent, identify and suppress violations of legislation on urban planning activities, including the requirements of project documentation. The subject of this audit is n 1 2 3 ch2 st54 GrK RF
# 222004425422
Unscheduled inspection
Start date: 2020-06-11, end date: 2020-06-15, duration: 2
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu realizacii programmy provedeniya proverok ot 17022020 2 po izvescheniyu o srokah zaversheniya rabot ot 19052020 1 vh ot 19052020 62VP992 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya p 1 2 3 ch2 st54 GrK RF
# 222004308822
Unscheduled inspection
Start date: 2020-02-25, end date: 2020-02-25, duration: 1
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu realizacii programmy provedeniya proverok ot 02072019 1 a takzhe proverki svedenii soderzhaschihsya v izvescheniyah ot 18112019 3 vh 62VP6079 ot 19112019 ot 16122019 4 vh 62VP6407 ot 17122019 o srokah zaversheniya rabot podlezhaschih proverke Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya pp1 pp2 pp3 ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s ch15 152 i 153 st48 GrK RF proektnoi dokumentacii vypolnenie trebovanii ch 2 3 31 st 52 GrK RF
# 221904080997
Unscheduled inspection
Start date: 2019-12-06, end date: 2019-12-11, duration: 4
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu proverki svedenii soderzhaschihsya v izveschenii ot 27112019 1 vh 62VP6153 ot 27112019 ob okonchanii stroitelstvaZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya p1 p2 p3 ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15152 i 153 stati 48 GrK RF proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 GrK RF
# 221903965556
Unscheduled inspection
Start date: 2019-11-14, end date: 2019-11-15, duration: 2
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: cel proverka svedenii soderzhaschihsya v izveschenii ot 05112019 1 vh ot 05112019 62VP5933 ob ustranenii narushenii ukazannyh v akte proverki ot 24102019 K89GSN soglasno predpisaniyu ot 24112019 K89GSN ob ustranenii narushenii
# 221904020290
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-11-18, duration: 1
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu proverki svedenii soderzhaschihsya v izveschenii 1 ot 11112019 vh 62VP5994 ot 11112019 ob ustranenii narushenii ukazannyh v predpisanii GIA52GSN ot 25092019 vyyavlennyh v hode proverki zakonchennogo stroitelstvom obekta kapitalnogo stroitelstva ot 25092019
# 221904020259
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-11-18, duration: 1
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu proverki svedenii soderzhaschihsya v izveschenii 1 ot 11112019 vh 62VP5994 ot 11112019 ob ustranenii narushenii ukazannyh v predpisanii GIA52GSN ot 25092019 vyyavlennyh v hode proverki zakonchennogo stroitelstvom obekta kapitalnogo stroitelstva ot 25092019
# 221904020248
Unscheduled inspection
Start date: 2019-11-18, end date: —, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection:
# 221903999205
Unscheduled inspection
Start date: 2019-11-18, end date: —, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection:
# 221903882864
Unscheduled inspection
Start date: 2019-10-21, end date: 2019-10-23, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu realizacii programmy provedeniya proverok ot 14052019 2 a tak zhe proverki svedenii soderzhaschihsya v izvescheniyah ot 26092019 7 vh 62VP5496 ot 27092019 ot 27092019 8 vh 62VP5494 ot 27092019
# 221903878078
Unscheduled inspection
Start date: 2019-10-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 221903609438
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-09-25, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu proverki svedenii soderzhaschihsya v izveschenii ot 09092019 1 vh 62VP5283 ot 09092019 ob okonchanii stroitelstvaZadachami nastoyaschei proverki yavlyayutsya proverka obekta kapitalnogo stroitelstva preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya p1 p2 p3 ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15152 i 153 stati 48 GrK RF proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 GrK RF
# 221903384453
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-09-11, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: cel ocenka sootvetstviya deyatelnosti Obschestva obyazatelnym trebovaniyam Federalnogo zakona ot 30122004 214FZ «Ob uchastii v dolevom stroitelstve mnogokvartirnyh domov i ili inyh obektov nedvizhimosti i o vnesenii izmenenii v nekotorye zakonodatelnye akty Rossiiskoi Federacii» dalee Federalnyi zakon 214FZ i prinyatyh v sootvetstvii s nim inyh normativnyh pravovyh aktov Rossiiskoi Federacii zadachi preduprezhdenie vyyavlenie i presechenie dopuschennyh licom osuschestvlyayuschim privlechenie denezhnyh sredstv grazhdan dlya stroitelstva narushenii zakonodatelstva Rossiiskoi Federacii v oblasti dolevogo stroitelstvapredmet soblyudenie obyazatelnyh trebovanii Federalnogo zakona 214FZ i prinyatyh v sootvetstvii s nim inyh normativnyh pravovyh aktov Rossiiskoi Federacii
# 221902819441
Unscheduled inspection
Start date: 2019-06-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 221902719063
Unscheduled inspection
Start date: 2019-05-16, end date: —, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection:
# 221902649933
Unscheduled inspection
Start date: 2019-04-12, end date: 2019-04-16, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: cel proverka svedenii soderzhaschihsya v izveschenii ot 09042019 4 vh 62VP3395 ot 09042019 ob okonchanii stroitelstva Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya pp 1 ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov
# 221902679406
Unscheduled inspection
Start date: 2019-04-23, end date: 2019-04-25, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: celyu proverki svedenii soderzhaschihsya v izveschenii 1 ot 10042019 vh 62VP3428 ot 10042019 ob okonchanii stroitelstva Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya pp 1 ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov
# 221902679329
Unscheduled inspection
Start date: 2019-04-23, end date: 2019-04-25, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: celyu proverki svedenii soderzhaschihsya v izveschenii 1 ot 12042019 vh 62VP3453 ot 12042019 ob okonchanii stroitelstva Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya pp 1 ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov
# 221902544687
Unscheduled inspection
Start date: 2019-02-27, end date: 2019-03-27, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: cel ocenka sootvetstviya deyatelnosti Obschestva obyazatelnym trebovaniyam Federalnogo zakona ot 30122004 214FZ «Ob uchastii v dolevom stroitelstve mnogokvartirnyh domov i ili inyh obektov nedvizhimosti i o vnesenii izmenenii v nekotorye zakonodatelnye akty Rossiiskoi Federacii» i prinyatyh v sootvetstvii s nim inyh normativnyh pravovyh aktov Rossiiskoi Federacii zadachami preduprezhdenie vyyavlenie i presechenie dopuschennyh licom osuschestvlyayuschim privlechenie denezhnyh sredstv grazhdan dlya stroitelstva narushenii zakonodatelstva Rossiiskoi Federacii v oblasti dolevogo stroitelstva predmet soblyudenie obyazatelnyh trebovanii Federalnogo zakona 214FZ i prinyatyh v sootvetstvii s nim inyh normativnyh pravovyh aktov Rossiiskoi Federacii
# 221902494372
Unscheduled inspection
Start date: 2019-02-05, end date: 2019-02-05, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: celyu proverki svedenii soderzhaschihsya v izveschenii 8 ot 21012019 vh 62VP581 ot 24012019 ob ustranenii narushenii ukazannyh v akte proverki zakonchennogo stroitelstvom obekta kapitalnogo stroitelstva ot 26122018 TAA52GSN predpisanie ot 26122018 TAA52GSN Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii 7 Predmetom nastoyaschei proverki yavlyaetsya pp 1 ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov
# 221902440841
Unscheduled inspection
Start date: 2019-01-17, end date: 2019-01-23, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu proverki svedenii soderzhaschihsya v izveschenii 2 ot 26122018 vh 31VP7039 ot 26122018 ob okonchanii stroitelstva obekta kapitalnogo stroitelstva Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya pp 1 2 3 ch2 st54 Gradostroitelnogo kodeksa RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 3 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii
# 221902440893
Unscheduled inspection
Start date: 2019-01-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 221902452505
Unscheduled inspection
Start date: 2019-01-21, end date: —, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection:
# 221902452474
Unscheduled inspection
Start date: 2019-01-21, end date: 2019-01-22, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu proverki svedenii soderzhaschihsya v izveschenii 4 ot 15012019 vh 31VP289 ot 16012019 ob ustranenii narushenii vyyavlennyh v hode proverki zakonchennogo stroitelstvom obekta kapitalnogo stroitelstva ot 14122018 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya pp 1 2 3 ch2 st54 Gradostroitelnogo kodeksa RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 3 31 stati 52 Gradostroitelnogo kodeksa RF
# 221802344579
Unscheduled inspection
Start date: 2018-12-24, end date: 2018-12-26, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu proverki svedenii soderzhaschihsya v izveschenii 7 ot 11122018 vh 31VP6701 ot 12122018 ob okonchanii stroitelstva Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii 7 Predmetom nastoyaschei proverki yavlyaetsya ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii ch2 3 i 31 st 52 GrK RF
# 221802344255
Unscheduled inspection
Start date: 2018-12-24, end date: 2018-12-27, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu proverki svedenii soderzhaschihsya v izveschenii 7 ot 11122018 vh 31VP6700 ot 12122018 ob okonchanii stroitelstva Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 3 31 stati 52 Gradostroitelnogo kodeksa RF
# 221802290451
Unscheduled inspection
Start date: 2018-12-11, end date: 2018-12-14, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu proverki svedenii soderzhaschihsya v izveschenii bn ot 30112018 vh 31VP6465 ot 30112018 ob okonchanii stroitelstva Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 3 31 stati 52 Gradostroitelnogo kodeksa RF
# 221802317205
Unscheduled inspection
Start date: 2018-12-17, end date: 2018-12-17, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu proverki svedenii soderzhaschihsya v izveschenii 3 ot 11122018 vh 31VP6680 ot 11122018 ob ustranenii narushenii vyyavlennyh v hode proverki zakonchennogo stroitelstvom obekta kapitalnogo stroitelstva ot 30112018 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 3 31 stati 52 Gradostroitelnogo kodeksa RF
# 221802153624
Unscheduled inspection
Start date: 2018-11-26, end date: 2018-11-30, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu proverki svedenii soderzhaschihsya v izveschenii 2 ot 15112018 vh 31VP6163 ot 15112018 ob okonchanii stroitelstva Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 3 31 stati 52 Gradostroitelnogo kodeksa RF
# 221801982036
Unscheduled inspection
Start date: 2018-10-18, end date: —, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection:
# 221801425906
Unscheduled inspection
Start date: 2018-09-12, end date: 2018-09-12, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu proverki svedenii soderzhaschihsya v izveschenii 4 ot 06092018 vh 31VP4774 ot 06092018 ob ustranenii narushenii vyyavlennyh v hode proverki zakonchennogo stroitelstvom obekta kapitalnogo stroitelstva ot 29082018 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF
# 221800673827
Unscheduled inspection
Start date: 2018-08-24, end date: —, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection:
# 221800290871
Unscheduled inspection
Start date: 2018-04-12, end date: 2018-04-12, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: S celyu proverki svedenii soderzhaschihsya v izveschenii 17 ot 16032018 vh 31VP1183 ot 16032018 ob okonchanii stroitelstva Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii tehnicheskih reglamentov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF Federalnyi zakon ot 30122009384FZ «Tehnicheskii reglament o bezopasnosti zdanii i sooruzhenii
# 221800228933
Unscheduled inspection
Start date: 2018-03-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 221800048596
Unscheduled inspection
Start date: 2018-02-02, end date: 2018-02-02, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu proverki svedenii soderzhaschihsya v izveschenii 18 ot 17012018 vh 31VP224 ot 18012018 ob ustranenii narushenii vyyavlennyh v hode proverki zakonchennogo stroitelstvom obekta kapitalnogo stroitelstva ot 17122017 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii tehnicheskih reglamentov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF Federalnyi zakon ot 30122009384FZ «Tehnicheskii reglament o bezopasnosti zdanii i sooruzhenii
# 22170803020739
Unscheduled inspection
Start date: 2017-12-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 22170802999192
Unscheduled inspection
Start date: 2017-12-19, end date: 2017-12-19, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu proverki svedenii soderzhaschihsya v izveschenii o nachale stroitelstva 1 ot 11122017 vh 31VP6327 ot 12122017 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh licom osuschestvlyayuschim stroitelstvo narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii tehnicheskih reglamentov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF Federalnyi zakon ot 30122009384FZ «Tehnicheskii reglament o bezopasnosti zdanii i sooruzhenii
# 22170802999281
Unscheduled inspection
Start date: 2017-12-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 22170802853654
Unscheduled inspection
Start date: 2017-11-20, end date: —, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection:
# 22170802853819
Unscheduled inspection
Start date: 2017-11-15, end date: 2017-11-15, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu proverki svedenii soderzhaschihsya v izveschenii ob ustranenii narushenii 18 ot 09112017 vh 31VP5143 ot 09112017 ukazannyh v akte proverki zakonchennogo stroitelstvom obekta 93GSN ot 27102017Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF
# 22170802771149
Unscheduled inspection
Start date: 2017-10-27, end date: 2017-10-27, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu proverki svedenii soderzhaschihsya v izveschenii ob okonchanii stroitelstva 17 ot 18102017 vh 31VP5145 ot 19102017Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF
# 22170802771118
Unscheduled inspection
Start date: 2017-10-26, end date: 2017-10-26, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu proverki svedenii soderzhaschihsya v izveschenii ob okonchanii stroitelstva 17 ot 18102017 vh 31VP5143 ot 19102017Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF
# 22170701882060
Unscheduled inspection
Start date: 2017-08-10, end date: 2017-08-11, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu proverki svedenii soderzhaschihsya v izveschenii ob okonchanii stroitelstva 17 ot 04082017 vh 31VP3957 ot 04082017Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii tehnicheskih reglamentov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF
# 22170701685095
Unscheduled inspection
Start date: 2017-06-15, end date: 2017-06-16, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: cel proverka svedenii soderzhaschihsya v izveschenii ob okonchanii stroitelstva 7 ot 26052017 vh 31VP2539 ot 26052017Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF Federalnyi zakon ot 30122009 384FZ «Tehnicheskii reglament o bezopasnosti zdanii i sooruzhenii
# 22170701738723
Unscheduled inspection
Start date: 2017-06-22, end date: 2017-06-22, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: purpose verification of the information contained in the notice of elimination of violations of the task prevention detection and suppression of violations of the legislation on urban development the subject is to verify the completed construction of the object, checking the compliance of the work and the construction materials used in the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility compliance with the mandatory requirements for the availability of a construction permit and the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 22170701571562
Unscheduled inspection
Start date: 2017-04-25, end date: 2017-04-27, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu ocenki sootvetstviya deyatelnosti Obschestva obyazatelnym trebovaniyam Federalnogo zakona ot 30122004 214FZ «Ob uchastii v dolevom stroitelstve mnogokvartirnyh domov i ili inyh obektov nedvizhimosti i o vnesenii izmenenii v nekotorye zakonodatelnye akty Rossiiskoi Federacii» i prinyatyh v sootvetstvii s nim inyh normativnyh pravovyh aktov Rossiiskoi Federacii v svyazi s vyyavleniem v hode provedeniya analiza ezhekvartalnoi otchetnosti zastroischika ob osuschestvlenii deyatelnosti svyazannoi s privlecheniem denezhnyh sredstv uchastnikov dolevogo stroitelstva za 4 kvartal 2016 goda priznakov narusheniya obyazatelnyh trebovanii ustanovlennyh zakonodatelstvom ob uchastii v dolevom stroitelstvezadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh licom osuschestvlyayuschim privlechenie denezhnyh sredstv grazhdan dlya stroitelstva narushenii zakonodatelstva Rossiiskoi Federacii v oblasti dolevogo stroitelstva Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii Federalnogo zakona 214FZ i prinyatyh v sootvetstvii s nim inyh normativnyh pravovyh aktov Rossiiskoi Federacii
# 22160701232166
Unscheduled inspection
Start date: 2016-12-14, end date: 2016-12-14, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: the purpose is to verify the information contained in the notice of elimination of violations committed during the construction process tasks prevention detection and suppression of violations of legislation on urban development activities the subject is to verify the completed construction of the facility, to verify the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources compliance with the mandatory requirements for a construction permit and the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 22160701120725
Unscheduled inspection
Start date: 2016-11-18, end date: 2016-11-18, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: purpose verification of the information contained in the notice of completion of construction tasks prevention detection and suppression of violations of legislation on urban planning activities the subject is to verify the completed construction of the object, checking the compliance of the work and construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility compliance with the mandatory requirements for the availability of a construction permit and the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 22160701098433
Unscheduled inspection
Start date: 2016-11-11, end date: 2016-11-11, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: purpose verification of the information contained in the notice of completion of construction tasks prevention detection and suppression of violations of legislation on urban planning activities the subject is to verify the completed construction of the object, checking the compliance of the work and construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility compliance with the mandatory requirements for the availability of a construction permit and the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 22160700879208
Unscheduled inspection
Start date: 2016-09-29, end date: 2016-09-29, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: purpose verification of the information contained in the notice of completion of construction tasks prevention detection and suppression of violations of legislation on urban planning activities the subject is to verify the completed construction of the object, checking the compliance of the work and construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility compliance with the mandatory requirements for the availability of a construction permit and the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 22160700691651
Unscheduled inspection
Start date: 2016-09-15, end date: 2016-09-15, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: the purpose is to verify the information contained in the notice of elimination of violations committed during construction tasks prevention detection and suppression of violations of legislation on urban development activities the subject is to verify the completed construction of the facility, to verify the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements equipment of the capital construction facility with metering devices for used energy resources compliance with the mandatory requirements for a construction permit and the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 22160700028418
Unscheduled inspection
Start date: 2016-08-19, end date: 2016-08-19, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: purpose verification of the information contained in the notice of completion of construction tasks prevention detection and suppression of violations of legislation on urban planning activities the subject is to verify the completed construction of the object, checking the compliance of the work and construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility compliance with the mandatory requirements for the availability of a construction permit and the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation