# 741800619869
Unscheduled inspection
Start date: 2018-08-16, end date: 2018-08-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The conformity of the work performed during the installation of steel aboveground sections, the installation of shut-off valves and insulating inserts during the sealing of cases, the installation of the foundation of the PHB, the installation of fencing and strapping of the PHB during the installation of lightning protection, grounding of the PHB during the performance of pneumatic tests, landscaping and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 The availability of permits for construction 3 Meeting the requirements of hh 23i 31 st52 of the Urban Planning Code of the Russian Federation
# 741800511552
Unscheduled inspection
Start date: 2018-07-05, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741800558211
Unscheduled inspection
Start date: 2018-07-24, end date: 2018-07-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of the trench, the filling device during the laying of the gas pipeline, the filling of the gas pipeline, the laying of the signal tape during backfilling and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23i 31 st52 of the Urban Planning Code of the Russian Federation
# 741800453011
Unscheduled inspection
Start date: 2018-06-19, end date: 2018-06-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the strapping of the GRPB, fencing, grounding and lightning protection devices of the GRPB and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800455934
Unscheduled inspection
Start date: 2018-06-20, end date: 2018-06-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed when laying the underground gas pipeline in a case from PK1+475 to PK1+275 when laying the underground gas pipeline in a case from PK4+60 to PK5 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23i 31 st52 of the Urban Planning Code of the Russian Federation
# 741800455931
Unscheduled inspection
Start date: 2018-06-20, end date: 2018-06-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed when laying the underground gas pipeline in a case from PK1+475 to PK1+275 when laying the underground gas pipeline in a case from PK4+60 to PK5 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23i 31 st52 of the Urban Planning Code of the Russian Federation
# 741800453137
Unscheduled inspection
Start date: 2018-06-20, end date: 2018-06-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed when checking the installation of fencing valves identification posts during crimping of the gas pipeline and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800271982
Unscheduled inspection
Start date: 2018-04-11, end date: 2018-04-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of small shut-off valves, valves, supply lines to residential buildings, when installing fasteners for house supply lines, the anti-corrosion protection of the aboveground gas pipeline and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23i 31 st52 Urban Planning Code of the Russian Federation
# 741800298805
Unscheduled inspection
Start date: 2018-04-25, end date: 2018-05-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of the foundation and foundation for the GRPB during the installation of the GRPB and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23i 31 st52 of the Urban Planning Code of the Russian Federation
# 741800235990
Unscheduled inspection
Start date: 2018-04-03, end date: 2018-04-09, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of 3 valves along Uralskaya Street when installing placemarks for the location of underground network devices identification posts and building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23i 31 st52 of the Urban Planning Code of the Russian Federation
# 741800211677
Unscheduled inspection
Start date: 2018-03-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800179284
Unscheduled inspection
Start date: 2018-03-07, end date: 2018-03-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the laying of the onshore gas pipeline along the supports from PK3+615 to PK4+375 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800072724
Unscheduled inspection
Start date: 2018-02-21, end date: 2018-02-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the laying of the underground gas pipeline along Nekrasov St. 2PK0+5552PK3+480 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800098635
Unscheduled inspection
Start date: 2018-02-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800026960
Unscheduled inspection
Start date: 2018-02-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800024350
Unscheduled inspection
Start date: 2018-01-30, end date: 2018-02-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the laying of the underground gas pipeline along 212 Uralskaya Street and Olkhovaya Street on the even and non-even sides of house 27 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74180803016589
Unscheduled inspection
Start date: 2018-01-11, end date: 2018-01-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the laying of the underground gas pipeline along Chernyshevsky St., Chkalov St. with the installation of supply lines to houses when installing the PE110 crane in the PK1+80 1PK2+225 fence and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23i 31 st52 of the Urban Planning Code of the Russian Federation
# 741800004377
Unscheduled inspection
Start date: 2018-01-24, end date: 2018-01-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: Compliance with the regulation of 09.0118 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802992845
Unscheduled inspection
Start date: 2017-12-27, end date: 2018-01-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work performed when laying a gas pipeline underground using the NGB method in a case under the road from UP1 to UP3 when installing an aboveground gas pipeline along supports from UP3 to UP 27c when installing foundations and mounting supports when installing branches to residential buildings installing valves with a diameter of 100 mm in the fence branches to Abrosimov and Gavrilov streets when laying a gas pipeline in an open case from UP9 to UP10 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, to the requirements of the technical regulations of the project documentation2 The availability of a construction permit3 Compliance with the requirements of parts 23 and 31 of Art 52 of the Urban Planning Code of the Russian Federation
# 74170802992847
Unscheduled inspection
Start date: 2017-12-26, end date: 2018-01-09, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed during the laying of an underground gas pipeline with a supply line to residential buildings along Yesenina Street Uralskaya Street on the even side of house 1434 on the non-even side of house 317 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 The availability of a construction permit 3 Compliance with the requirements of h 23 and 31 Article 52 of the Urban Planning Code of the Russian Federation
# 74170802976770
Unscheduled inspection
Start date: 2017-12-20, end date: 2017-12-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed during the laying of the underground gas pipeline along Chekhov Gorky Nagornaya Street with the installation of supply lines to houses PK5+90 4 PK4+ 54 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170701871126
Unscheduled inspection
Start date: 2017-08-16, end date: 2017-08-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed during the laying of the exterior walls and partitions of the building and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170801910188
Unscheduled inspection
Start date: 2017-08-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701891134
Unscheduled inspection
Start date: 2017-08-22, end date: 2017-08-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed during the installation of window and door blocks during the installation of the attic and roof during the installation of stairs and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170701837560
Unscheduled inspection
Start date: 2017-08-01, end date: 2017-08-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed during the installation of the crushed stone foundation, reinforcement and concreting of the foundation slab Pf1 during the waterproofing of the foundation slab and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation