# 042004315276
Unscheduled inspection
Start date: 2020-02-26, end date: 2020-03-25, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Altai
Purpose of inspection: Objectives Execution of the decree of the Deputy Chairman of the Government of the Russian Federation TA Golikova dated 27/12/2019 TG 1211486 and the Rostrud Order dated 0702202029 Tasks Ensuring compliance with and protection of labor rights and freedoms of citizens including the right to safe working conditions The subject of the KNM is supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms compliance with mandatory requirements or requirements established by municipal authorities legal acts
# 041904218769
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-11-26, duration: —
Authority: Ministerstvo regionalnogo razvitiya Respubliki Altai
Purpose of inspection: for compliance with the project documentation
# 041904212936
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-09-25, duration: —
Authority: Ministerstvo regionalnogo razvitiya Respubliki Altai
Purpose of inspection: for compliance with the project documentation
# 041904218752
Unscheduled inspection
Start date: 2019-03-18, end date: 2019-03-22, duration: —
Authority: Ministerstvo regionalnogo razvitiya Respubliki Altai
Purpose of inspection: for compliance with the project documentation
# 041904212903
Unscheduled inspection
Start date: 2019-02-18, end date: 2019-02-22, duration: —
Authority: Ministerstvo regionalnogo razvitiya Respubliki Altai
Purpose of inspection: for compliance with the project documentation
# 041904218687
Unscheduled inspection
Start date: 2019-02-04, end date: 2019-04-08, duration: —
Authority: Ministerstvo regionalnogo razvitiya Respubliki Altai
Purpose of inspection: for compliance with the project documentation
# 041904212864
Unscheduled inspection
Start date: 2019-01-15, end date: 2019-01-18, duration: —
Authority: Ministerstvo regionalnogo razvitiya Respubliki Altai
Purpose of inspection: for compliance with the project documentation
# 04170701899961
Unscheduled inspection
Start date: 2017-08-14, end date: —, duration: —
Authority: Ministerstvo cifrovogo razvitiya Respubliki Altai
Purpose of inspection:
# 04170701372528
Unscheduled inspection
Start date: 2017-02-06, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Altai
Purpose of inspection: protection of the rights and interests of employees supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms
# 222101283899
Unscheduled inspection
Start date: 2021-10-29, end date: —, duration: 5
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: Purpose: to verify the information contained in the notice of completion of the capital construction facility dated 10/25/2021 No. 6 (ex. dated 10/25/2021 No. 62/VP/2524)
The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including the requirements of the project documentation;
The subject of this audit is: paragraphs 1, 2, 3, 5 of Part 3 of art. 54 of the GRK RF
# 222100628474
Unscheduled inspection
Start date: 2021-09-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 222100503393
Unscheduled inspection
Start date: 2021-08-19, end date: —, duration: 5
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: The inspection is carried out in order to verify the information contained in the notice of completion of the capital construction facility dated 08/16/2021 No. 6 (ex. dated 08/16/2021 No. 62/VP/1913)
The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including the requirements of the project documentation;
7. The subject of this audit is: paragraphs 1, 2, 3, 5 of Part 3 of art. 54 of the GRK RF
# 222100264398
Unscheduled inspection
Start date: 2021-06-09, end date: —, duration: 2
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: The inspection is carried out in order to implement the inspection program No. 1 dated 12.10.2020
The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including the requirements of the project documentation;
7. The subject of this audit is: paragraphs 1, 2, 3, part 2, art.54 of the GRK RF
# 222100058326
Unscheduled inspection
Start date: 2021-03-11, end date: 2021-03-12, duration: 2
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: The inspection is carried out in order to implement the inspection program No. 1 dated 12.10.2020
The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including the requirements of the project documentation;
7. The subject of this audit is: paragraphs 1, 2, 3, part 2, art.54 of the GRK RF
# 222004507056
Unscheduled inspection
Start date: 2020-08-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 222004495335
Unscheduled inspection
Start date: 2020-08-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 222004429402
Unscheduled inspection
Start date: 2020-06-29, end date: 2020-06-30, duration: 2
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to implement the inspection program from 20122/2019 1, the objectives of this inspection are to prevent, identify and suppress violations of legislation on urban planning activities, including the requirements of project documentation. The subject of this inspection is n 1 2 3 ch2 st54 GrK RF
# 222004429076
Unscheduled inspection
Start date: 2020-06-09, end date: 2020-06-10, duration: 2
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to implement the inspection program dated 29042020 1, the objectives of this inspection are to prevent, identify and suppress violations of legislation on urban planning activities, including the requirements of project documentation. The subject of this inspection is n 1 2 3 ch2 st54 GrK RF
# 222004425441
Unscheduled inspection
Start date: 2020-06-01, end date: 2020-06-03, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to verify the information contained in the notice of completion of the capital construction project dated 27052020 9 bx dated 27052020 62VP1081, the objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities, including the requirements of project documentation. The subject of this audit is n 1 2 3 h2 st54 GrK RF
# 222004323172
Unscheduled inspection
Start date: 2020-03-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 222004323221
Unscheduled inspection
Start date: 2020-03-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 042004315276
Unscheduled inspection
Start date: 2020-02-26, end date: 2020-03-25, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Altai
Purpose of inspection: Objectives Execution of the decree of the Deputy Chairman of the Government of the Russian Federation TA Golikova dated 27/12/2019 TG 1211486 and the Rostrud Order dated 0702202029 Tasks Ensuring compliance with and protection of labor rights and freedoms of citizens including the right to safe working conditions The subject of the KNM is supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms compliance with mandatory requirements or requirements established by municipal authorities legal acts
# 041904218769
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-11-26, duration: —
Authority: Ministerstvo regionalnogo razvitiya Respubliki Altai
Purpose of inspection: for compliance with the project documentation
# 221903609507
Unscheduled inspection
Start date: 2019-09-20, end date: —, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection:
# 041904212936
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-09-25, duration: —
Authority: Ministerstvo regionalnogo razvitiya Respubliki Altai
Purpose of inspection: for compliance with the project documentation
# 221902889655
Unscheduled inspection
Start date: 2019-07-19, end date: —, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection:
# 221902850014
Unscheduled inspection
Start date: 2019-07-02, end date: —, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection:
# 041902705742
Unscheduled inspection
Start date: 2019-04-30, end date: 2019-06-03, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Altai
Purpose of inspection: For the purpose of federal state supervision over compliance with labor legislation and other normative legal acts containing norms of labor law, the implementation of federal state supervision over compliance by a legal entity or individual entrepreneur with mandatory requirements of labor legislation and other normative legal acts containing norms of labor law
# 221902628784
Unscheduled inspection
Start date: 2019-04-11, end date: 2019-04-12, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: The inspection is carried out in order to implement the inspection program 1 dated 11072018 for the installation of structures of the aboveground part3 floor with the expiration of the deadline for the execution by a legal entity of an order issued by the state construction supervision authority to eliminate violations of the mandatory requirements of the VEV1GSN dated 11012019. The objectives of this inspection are to prevent identify and suppress violations by the developer of legislation on urban development, including the requirements of project documentation. The purpose of this audit is pp1 2 3 part 2 of Article 54 of the Urban Planning Code of the Russian Federation and the Russian Federation to verify the compliance of the work and the construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work with the requirements of the design documentation, compliance with the mandatory requirements for a building permit and the requirements of Parts 2 3 and 31 of Article 52 of the Civil Code of the Russian Federation
# 221902644938
Unscheduled inspection
Start date: 2019-04-10, end date: 2019-05-14, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: the purpose is to assess the compliance of the Company's activities with the mandatory requirements of the Federal Law of 30122004 214FZ "On Participation in the Shared-equity Construction of Apartment Buildings and Other Real Estate Objects and on Amendments to Certain Legislative Acts of the Russian Federation" hereinafter referred to as the Federal Law of 30122004 214FZ and other regulatory legal acts of the Russian Federation adopted in accordance with it tasks prevention detection and suppression of violations committed by a person those who attract citizens' funds for the construction of violations of the legislation of the Russian Federation in the field of shared-equity construction are subject to compliance with the mandatory requirements of Federal Law 214 FZ and other regulatory legal acts of the Russian Federation adopted in accordance with it.
# 041904212917
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-04-19, duration: —
Authority: Ministerstvo regionalnogo razvitiya Respubliki Altai
Purpose of inspection: for compliance with the project documentation
# 221902625054
Unscheduled inspection
Start date: 2019-04-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 041904218752
Unscheduled inspection
Start date: 2019-03-18, end date: 2019-03-22, duration: —
Authority: Ministerstvo regionalnogo razvitiya Respubliki Altai
Purpose of inspection: for compliance with the project documentation
# 221902599763
Unscheduled inspection
Start date: 2019-03-21, end date: 2019-03-22, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: The inspection is carried out in order to verify the information contained in the notice on the completion dates of works subject to inspection during the construction of a capital construction facility acceptance of internal engineering networks ventilation network 7 dated 14022019 vh61VP1491 dated 15022019 The objectives of this inspection are to prevent identify and suppress violations by the developer of legislation on urban development activities including the requirements of project documentation The subject of this inspection is pp1 2 3 Part 2 of Article 54 of the Urban Planning Code of the Russian Federation Further verification of the compliance of the work and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation, compliance with the mandatory requirements for a construction permit and the requirements of Parts 2 3 and 31 of Article 52 of the Civil Code of the Russian Federation
# 041904212903
Unscheduled inspection
Start date: 2019-02-18, end date: 2019-02-22, duration: —
Authority: Ministerstvo regionalnogo razvitiya Respubliki Altai
Purpose of inspection: for compliance with the project documentation
# 041904218687
Unscheduled inspection
Start date: 2019-02-04, end date: 2019-04-08, duration: —
Authority: Ministerstvo regionalnogo razvitiya Respubliki Altai
Purpose of inspection: for compliance with the project documentation
# 221902450420
Unscheduled inspection
Start date: 2019-01-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 221902447145
Unscheduled inspection
Start date: 2019-01-11, end date: 2019-01-11, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: this inspection is carried out in order to implement the inspection program 1 dated 11072018 to verify the completion of work on the installation of structures of the underground and aboveground parts of the building to verify the information contained in the notice of completion dates of work subject to inspection during the construction of a capital construction facility 4 dated 23112018 vh31VP6332 dated 23112018 5 dated 11122018 vh31VP6678 dated 11122018 The objectives of this inspection are to prevent identify and suppress technical errors the customer of violations of the legislation on urban planning activities, including the requirements of the project documentation, the subject of this audit is kpp123 part 2 st54 of the Urban Planning Code of the Russian Federation GRK RF verification of compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with devices accounting for the energy resources used compliance with the mandatory requirements for a construction permit and the requirements of Parts 2 3 and 31 of Art 52 of the GRK RF
# 041904212864
Unscheduled inspection
Start date: 2019-01-15, end date: 2019-01-18, duration: —
Authority: Ministerstvo regionalnogo razvitiya Respubliki Altai
Purpose of inspection: for compliance with the project documentation
# 221802209003
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-05, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: the purpose is to assess the compliance of the Company's activities with the mandatory requirements of Federal Law No. 30122004 214 FZ "On Participation in the Shared Construction of Apartment Buildings and or Other Real Estate Objects and on Amendments to Certain Legislative Acts of the Russian Federation" hereinafter Federal Law 214 FZ and other regulatory legal acts of the Russian Federation adopted in accordance with it in connection with the identification during the analysis quarterly reports of the developer on the implementation of activities related to the attraction of funds from participants in shared-equity construction for the 3rd quarter of 2018 of signs of violation of the mandatory requirements established by the legislation on participation in shared-equity construction tasks prevention identification and suppression of violations of the legislation of the Russian Federation in the field of shared-equity construction by the person engaged in attracting citizens' funds for construction subject compliance with the mandatory requirements of Federal Law No. 30122004 Federal Law No. 214 FZ "On Participation in the Shared-Equity Construction of Apartment Buildings and or Other Real Estate Objects and on Amendments to Certain Legislative Acts of the Russian Federation" and Other Regulatory Legal Acts of the Russian Federation Adopted in accordance with it
# 221801970445
Unscheduled inspection
Start date: 2018-10-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 221801593388
Unscheduled inspection
Start date: 2018-09-19, end date: 2018-09-21, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: To establish that this audit is carried out in order to verify the information contained in the notice of completion of construction reconstruction and capital repairs of the capital construction facility 4 dated 14092018 vh31VP4927 dated 17092018 The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the technical customer, including the requirements of the project documentation. The subject of this audit is ch2st54 GrK RF verification of compliance with works and construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with the mandatory requirements for a construction permit and the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 221800853316
Unscheduled inspection
Start date: 2018-08-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 221800571379
Unscheduled inspection
Start date: 2018-07-19, end date: 2018-07-19, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: To establish that this audit is conducted in order to verify the information specified in the notice on the elimination of violations during construction reconstruction and major repairs of the capital construction facility 31 dated 18072018 vh31VP3820 dated 18072018 The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer, including the requirements of technical regulations and project documentation. The subject of this audit is ch2st54 GrK RF verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with the mandatory requirements for a construction permit and the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code Russian Federation Federal Law No. 30122009 384FZ "Technical Regulations on the Safety of Buildings and Structures"
# 221800515121
Unscheduled inspection
Start date: 2018-06-28, end date: 2018-06-29, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: To establish that this audit is conducted in order to verify the information specified in the notice on the elimination of violations during construction reconstruction and major repairs of the capital construction facility 3 dated 22062018 vh31VP3301 dated 22062018 The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer, including the requirements of technical regulations and project documentation. The subject of this audit is ch2st54 GrK RF verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with the mandatory requirements for a construction permit and the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code Russian Federation Federal Law No. 30122009 384FZ "Technical Regulations on the Safety of Buildings and Structures"
# 041802430516
Unscheduled inspection
Start date: 2018-06-28, end date: 2018-07-25, duration: —
Authority: Ministerstvo regionalnogo razvitiya Respubliki Altai
Purpose of inspection: the purpose of monitoring compliance with the mandatory requirements of Federal Law No. 214 FZ of December 30, 2004 "On Participation in Shared-equity Construction of Apartment Buildings and Other Real Estate Objects and on Amendments to Certain Legislative Acts of the Russian Federation" The objectives of this audit are to identify violations committed by the developer engaged in shared-equity construction of apartment buildings and or other real estate objects in compliance with the mandatory requirements established by the legislation of the Russian Federation in the field of shared-equity construction
# 221800429078
Unscheduled inspection
Start date: 2018-06-04, end date: 2018-06-06, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: Purpose verification of the information specified in the notice of completion of construction reconstruction and capital repairs of the capital construction facility 4 dated 300-52018 vh31VP2862 dated 300-52018 The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer, including the requirements of technical regulations and project documentation The subject of this audit is ch2st54 GrK RF checking the compliance of work and applied building materials during the construction of the reconstruction of the capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, compliance with the mandatory requirements for a construction permit and the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation Federal Law No. 30122009 384FZ "Technical regulations on the safety of buildings and structures"
# 22170802822896
Unscheduled inspection
Start date: 2017-11-08, end date: 2017-11-08, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to verify the information contained in the notice on the elimination of violations during construction reconstruction and major repairs of the capital construction facility 4 dated 01112017 bx 31VP5472 dated 02112017the objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the technical customer, including the requirements of technical regulations and project documentationthe subject of this audit is CH2ST54 GRK RF checking the compliance of work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work meet the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with the mandatory requirements for a construction permit and the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation Federal Law No. 30122009 384FZ "Technical Regulations on the safety of buildings and structures
# 22170802698601
Unscheduled inspection
Start date: 2017-10-09, end date: —, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection:
# 22170802698642
Unscheduled inspection
Start date: 2017-10-10, end date: 2017-10-10, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to verify the information specified in the notice of the start of construction 2 dated April 07, 2017, VX 31VP1677 dated April 07, 2017, the objectives of this audit are to prevent identify and suppress violations of urban planning legislation by the technical customer, including the requirements of technical regulations and project documentationthe subject of this audit is CH2ST54 GRK RF verification of compliance with the work and applied construction materials during the construction reconstruction of the capital construction facility, as well as the results of such work, requirements of technical regulations, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with mandatory requirements for a construction permit and the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation Federal Law No. 30122009 384 FZ "Technical regulations on the safety of buildings and structures
# 22170802795931
Unscheduled inspection
Start date: 2017-10-30, end date: —, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection:
# 22170802507135
Unscheduled inspection
Start date: 2017-09-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 04170701899961
Unscheduled inspection
Start date: 2017-08-14, end date: 2017-08-22, duration: —
Authority: Ministerstvo cifrovogo razvitiya Respubliki Altai
Purpose of inspection: This audit is conducted in order to verify compliance with the mandatory requirements of housing legislation in the apartment building 951 on Kommunistichesky ave. Gorno Altaysk in connection with the receipt by the State Housing Inspectorate of the Altai Republic of an appeal from a resident of an apartment building at the above address bx327 dated 24072017. the objectives of this audit are to verify compliance with the mandatory requirements of housing legislation in the apartment building 951 on Kommunistichesky Ave. Gorno Altaysk Altaiskthe subject of this audit is compliance with mandatory requirements or requirements established by the housing legislation of the Russian Federation
# 22170701795133
Unscheduled inspection
Start date: 2017-07-12, end date: 2017-07-12, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: In order to verify the information contained in the notice of completion of construction 1 dated 07072017 VH31VP3360 dated 07072017, the objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the technical customer, including the requirements of technical regulations and design documentationthe subject of this audit is CH2ST54 GRK RF verification of compliance with the performance of work and the construction materials used during the construction reconstruction of a capital construction facility. construction as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, compliance with the mandatory requirements for a construction permit and the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation Federal Law No. 30122009 384 FZ "Technical Regulations on the Safety of Buildings and Structures
# 22170701630041
Unscheduled inspection
Start date: 2017-05-18, end date: 2017-05-18, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: purpose verification of the information contained in the notice of completion of construction tasks prevention detection and suppression of violations of legislation on urban planning activities the subject is to verify the completed construction of the object, checking the compliance of the work and construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility compliance with the mandatory requirements for the availability of a construction permit and the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 22170701522694
Unscheduled inspection
Start date: 2017-04-10, end date: 2017-04-10, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: the purpose of the program of inspections is to prevent identify and suppress violations of legislation on urban development activities the subject is to verify the completed construction of the facility, verify compliance of the work and construction materials used in the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements of equipment of the capital construction facility with metering devices used compliance with the mandatory requirements for a construction permit and the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 22170701380156
Unscheduled inspection
Start date: 2017-02-16, end date: 2017-02-16, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: the purpose of the audit program is to implement the objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer, including the requirements of technical regulations and project documentationthe purpose of this audit is to verify the compliance of work performed and building materials used during the construction of a capital construction facility, as well as the results of such work with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 22170701380169
Unscheduled inspection
Start date: 2017-02-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 04170701372528
Unscheduled inspection
Start date: 2017-02-06, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Altai
Purpose of inspection: protection of the rights and interests of employees supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms
# 04160701265000
Unscheduled inspection
Start date: 2016-12-21, end date: 2016-12-29, duration: —
Authority: Ministerstvo cifrovogo razvitiya Respubliki Altai
Purpose of inspection: this audit is conducted in order to verify compliance by the Limited Liability Company "Construction Management 1" with the mandatory requirements of the legislation of the Russian Federation in the apartment building 951 on Communist Avenue in Gornoaltaysk of the Altai Republic in connection with the receipt by the State Housing Inspectorate of the Altai Republic of the application of the owner of apartment 72 of the above-mentioned house bx 440 dated 29112016. The objectives of this audit are to verify compliance with the mandatory requirements according to the legislation of the Russian Federation, the Limited Liability Company "Construction Management 1" at 951 prKommunistichesky Street in Gornoaltaysk, Altai Republic, the subject of this audit is compliance with mandatory requirements or requirements established by the housing legislation of the Russian Federation
# 22160701012573
Unscheduled inspection
Start date: 2016-10-14, end date: 2016-10-14, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: the purpose of the program of inspections is to prevent identify and suppress violations of legislation on urban development activities the subject is to verify the completed construction of the facility, verify compliance of the work and construction materials used in the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements of equipment of the capital construction facility with metering devices used compliance with the mandatory requirements for a construction permit and the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 22160701012523
Unscheduled inspection
Start date: 2016-10-14, end date: 2016-10-14, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: purpose implementation of the inspection program tasks prevention detection and suppression of violations of legislation on urban development activities the subject is to verify the completed construction of the facility, to verify the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements for the equipment of the capital construction facility with metering devices used compliance with the mandatory requirements for a building permit and the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 22160701034746
Unscheduled inspection
Start date: 2016-10-21, end date: 2016-10-21, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: purpose verification of the information contained in the notice of completion of construction tasks prevention detection and suppression of violations of legislation on urban planning activities the subject is to verify the completed construction of the object, checking the compliance of the work and construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility compliance with the mandatory requirements for the availability of a construction permit and the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 22160700048811
Unscheduled inspection
Start date: 2016-08-23, end date: 2016-08-23, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: purpose verification of the information contained in the notice of completion of construction tasks prevention detection and suppression of violations of legislation on urban planning activities the subject is to verify the completed construction of the object, checking the compliance of the work and construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility compliance with the mandatory requirements for the availability of a construction permit and the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation