# 742100812192
Unscheduled inspection
Start date: 2021-09-24, end date: 2021-09-30, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Checking the actual condition of the object. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742004309606
Unscheduled inspection
Start date: 2020-03-10, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741903055928
Unscheduled inspection
Start date: 2019-09-05, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741902873733
Unscheduled inspection
Start date: 2019-07-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902678561
Unscheduled inspection
Start date: 2019-05-14, end date: 2019-05-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of technical floor structures insulation of the attic, roofing and construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code of the Russian Federation
# 741902622245
Unscheduled inspection
Start date: 2019-04-11, end date: 2019-04-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of structures from the 5th to the 10th floors and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902591183
Unscheduled inspection
Start date: 2019-03-28, end date: 2019-04-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of structures from the 1st to the 5th floors and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802291685
Unscheduled inspection
Start date: 2018-12-14, end date: 2019-01-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed in meeting the requirements of a sanitary and epidemiological nature, ensuring access for the disabled, ensuring fire protection of the building, facade decoration, landscaping and building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Verification of the completed construction of the facility 3 Availability of a construction permit 4 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation
# 741802063998
Unscheduled inspection
Start date: 2018-11-09, end date: 2018-11-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of excavation work on the construction of a crushed stone foundation, asphalt concrete pavement, sidewalks, lawns, and construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802149274
Unscheduled inspection
Start date: 2018-11-30, end date: 2018-12-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of elevators, low-current networks, ventilation systems, electrical installation and finishing works in the premises and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741801698183
Unscheduled inspection
Start date: 2018-10-02, end date: 2018-10-08, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on trench development pipeline installation installation of inspection wells backfilling landscaping installation of sewage outlets from residential buildings zhd55 to site KK16KK20 zhd 59 to site KK16KK20 zhd 56 to site KK27KK15 ZHD 58 to site KK24KK4 and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741801923687
Unscheduled inspection
Start date: 2018-10-17, end date: 2018-10-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed in the installation of internal engineering systems for heating cold and hot water supply, drainage, finishing works and construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800648632
Unscheduled inspection
Start date: 2018-09-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800546011
Unscheduled inspection
Start date: 2018-07-19, end date: 2018-07-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of load-bearing and enclosing structures of the technical floor, roofing, masonry of internal walls and partitions, installation of lintels of floors, window and balcony blocks, glazing of balconies, loggias, stained glass windows, metal structures and doors, and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation 2 Availability of a construction permit 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800534179
Unscheduled inspection
Start date: 2018-07-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800562292
Unscheduled inspection
Start date: 2018-07-25, end date: 2018-07-31, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of a water supply system in a residential building 55 56 59 and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800368246
Unscheduled inspection
Start date: 2018-05-17, end date: 2018-05-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of load-bearing and enclosing structures of 37 floors, the laying of internal walls and partitions, the installation of lintels after the actual completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800401786
Unscheduled inspection
Start date: 2018-05-31, end date: 2018-06-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of load-bearing and enclosing structures of 810 floors, the laying of internal walls and partitions, the installation of lintels after the actual completion of the work, the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800341591
Unscheduled inspection
Start date: 2018-05-11, end date: 2018-05-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The completion of the work on the development of the trench from PG22 to PG4, the installation of the pipeline from PG22 to PG4, the installation of inspection wells from PG22 to PG4, the installation of the water supply into the residential building 59 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the technical regulations of the project documentation 2The presence of a construction permit 3The requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800332637
Unscheduled inspection
Start date: 2018-05-08, end date: 2018-05-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of foundations, waterproofing of foundations before the start of the installation of the supporting structures of the basement and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800341428
Unscheduled inspection
Start date: 2018-05-21, end date: 2018-05-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The performance of trench development, pipeline installation, installation of inspection wells, backfilling, landscaping of KK16 and KK20 pipes and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meets the requirements of the technical regulations of the project documentation 2The presence of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800281086
Unscheduled inspection
Start date: 2018-04-13, end date: 2018-05-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed capital construction facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800235887
Unscheduled inspection
Start date: 2018-04-03, end date: 2018-04-09, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1confirmation of the actual condition of the capital construction facility 2The receipt of a building permit 3Compliance with the requirements of hh 23 and 31st52 of the Urban Planning Code of the Russian Federation
# 741800171498
Unscheduled inspection
Start date: 2018-03-12, end date: 2018-03-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the pile foundation and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800020586
Unscheduled inspection
Start date: 2018-01-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800011014
Unscheduled inspection
Start date: 2018-01-26, end date: 2018-02-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of load-bearing and enclosing structures of the basement, external and internal walls of the ceiling and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code of the Russian Federation
# 741800011008
Unscheduled inspection
Start date: 2018-01-26, end date: 2018-02-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of load-bearing and enclosing structures of 24 floors after the actual completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170803016339
Unscheduled inspection
Start date: 2017-12-25, end date: 2017-12-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of load-bearing and enclosing structures of the basement and first floor after the actual completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2The presence of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170803010643
Unscheduled inspection
Start date: 2017-12-25, end date: 2018-01-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of a capital construction project completed 2 Receipt of a construction permit 3 Fulfillment of the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170803011602
Unscheduled inspection
Start date: 2017-12-22, end date: 2018-01-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on compliance with fire-fighting and sanitary epidemiological measures measures to ensure access for low-mobility groups of the population After the actual completion of work To the installation of elevator equipment After the actual completion of work To the device of internal cold and hot water supply systems for heating and drainage of boiler room input units After the actual completion of work To the device of the power supply system for low-current switchboard systems and the construction materials used during the construction of a capital construction facility as well as the results of such work to the requirements of the technical regulations of the project documentation 2 Verification of the completed construction of the capital construction facility 3 Availability of a construction permit 4 Compliance with the requirements of HR 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802971013
Unscheduled inspection
Start date: 2017-12-12, end date: 2018-01-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of a capital construction facility completed 2 The receipt of a construction permit 3 Compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802974707
Unscheduled inspection
Start date: 2017-12-13, end date: 2017-12-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of foundations, waterproofing of foundations and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802966252
Unscheduled inspection
Start date: 2017-12-13, end date: 2017-12-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on filling window openings of 610 floors before the slopes and installation of window sills to the landscaping of the house territory after the actual completion of work, the installation of small architectural forms, the installation of pits at the entrance to the basement, the installation of porches after the actual completion of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the receipt of a construction permit3 requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802782708
Unscheduled inspection
Start date: 2017-11-01, end date: 2017-11-08, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The performance of roof waterproofing after the actual completion of work, landscaping of the adjacent territory before the installation of asphalt concrete pavement of the 2nd stage of electrical installation of low-current systems and building materials used during the construction of the capital construction facility, as well as the results of such work, meets the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802839982
Unscheduled inspection
Start date: 2017-11-16, end date: 2017-11-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the execution of the regulation dated 30102017 with a deadline of up to 24/12017 on the basis of notice 2 dated 021/12017g on the elimination of violations of BX 589 dated 021/12017G2 Receipt of a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802912372
Unscheduled inspection
Start date: 2017-11-30, end date: 2017-12-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of electrical installation work with full readiness of plumbing work with full readiness of work on the installation of elevators during commissioning and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802764249
Unscheduled inspection
Start date: 2017-10-25, end date: 2017-10-31, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of load-bearing and enclosing structures of 24 floors of masonry internal walls and partitions, the installation of floors during the work process, the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802631448
Unscheduled inspection
Start date: 2017-10-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802729407
Unscheduled inspection
Start date: 2017-10-23, end date: 2017-10-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of structures at the 5th floor level and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802631445
Unscheduled inspection
Start date: 2017-10-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802655375
Unscheduled inspection
Start date: 2017-10-10, end date: 2017-10-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of load-bearing and enclosing structures of external and internal wall panels floor slabs of stairwell shafts sanitary cabins ventilation units of the 9th floor to the work on waterproofing the roof masonry fire walls of the technical floor in the 2nd stage, the installation of load-bearing structures above grade 0, the installation of window blocks, the installation of doors and gates, facade work, landscaping during the production process and applied construction materials during the construction of a capital construction facility, as well as the results of such work, meet the requirements of the technical regulations of the project documentation2 Receipt of a construction permit3compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802001819
Unscheduled inspection
Start date: 2017-09-08, end date: 2017-09-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the grillage installation work after the actual completion of the work, the installation of load-bearing and enclosing structures of the basement of the first floor, masonry of internal walls and partitions, the installation of lintels during the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The availability of a construction permit 3 The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170801958001
Unscheduled inspection
Start date: 2017-09-04, end date: 2017-09-08, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of plumbing work, electrical work, and construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations for project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170701886105
Unscheduled inspection
Start date: 2017-09-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701853624
Unscheduled inspection
Start date: 2017-08-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170801918169
Unscheduled inspection
Start date: 2017-08-24, end date: 2017-08-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of structures at the roof level with the installation of window blocks and building materials used in the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh23 and 31st52 of the Urban Planning Code of the Russian Federation
# 74170701844148
Unscheduled inspection
Start date: 2017-08-02, end date: 2017-08-08, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of internal cold and hot water supply systems for heating and drainage of boiler room entry points, filling of window openings of 610 floors before the slopes are completed and installing window sills and building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701906056
Unscheduled inspection
Start date: 2017-08-21, end date: 2017-08-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of the pile foundation of monolithic reinforced concrete grillings and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170701771126
Unscheduled inspection
Start date: 2017-07-07, end date: 2017-07-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of a monolithic grillwork in axes 46 for the installation of load-bearing structures from the basement and first floor, external and internal walls of the ceiling before the installation of external and internal wall panels on the 2nd floor and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2 The availability of a construction permit 3 The implementation of requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701754014
Unscheduled inspection
Start date: 2017-07-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701788127
Unscheduled inspection
Start date: 2017-07-26, end date: 2017-08-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of load-bearing and enclosing structures of 910 floors of load-bearing and enclosing structures of the technical floor of the parapet before the end of the installation of roofing panels and building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701682970
Unscheduled inspection
Start date: 2017-06-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701682968
Unscheduled inspection
Start date: 2017-06-08, end date: 2017-06-09, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the elimination of violations as prescribed by 06042017 g2 Availability of a construction permit 3 Compliance with the requirements of hr 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701682880
Unscheduled inspection
Start date: 2017-06-09, end date: 2017-06-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of supporting structures on the ground floor with the installation of supporting and enclosing structures on the 58th floor prior to the installation of supporting and enclosing structures on the 9th floor and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701719683
Unscheduled inspection
Start date: 2017-06-23, end date: 2017-06-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on backfilling and landscaping of the construction site in sections UT43UP4 UP4J60 with pipeline insulation work on closing channels and thermal waterproofing nodes of channels and thermal nodes in the section from UT40 to UT 42 with earthworks preparation of the trench foundation installation of a channel channel installation of thermal chambers installation of a pipeline installation of fixed pipeline insulation supports closure of channels and thermal waterproofing nodes of channels and thermal units in the area from UT42 to UT43 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, to the requirements of the technical regulations of the project documentation2 Obtaining a construction permit3 Complying with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701623279
Unscheduled inspection
Start date: 2017-05-19, end date: 2017-05-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of foundations waterproofing of foundations before backfilling the sinuses of the excavation and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701622077
Unscheduled inspection
Start date: 2017-05-19, end date: 2017-05-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the work on the organization of the construction site, the removal of networks from the construction site, the removal of the axes of the object in kind, the development of the excavation before the start of pile work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701600302
Unscheduled inspection
Start date: 2017-05-12, end date: 2017-05-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of excavation work on the preparation of the trench foundation, the installation of a trough channel, the installation of thermal chambers, the installation of a pipeline, the installation of fixed supports in the area from UT40 to UT42, Excavation work, the preparation of the trench base, the installation of a trough channel, the installation of thermal chambers, the installation of fixed pipeline insulation supports, the closure of channels and thermal waterproofing nodes of channels and thermal nodes in sections UT43UP4 UP4J60 and applied construction materials during the construction of a capital construction facility as well as the results of such work to the requirements of the technical regulations of the project documentation 2The receipt of a construction permit 3The fulfillment of the requirements of HH 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701579418
Unscheduled inspection
Start date: 2017-05-03, end date: 2017-06-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of a capital construction facility completed 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701629762
Unscheduled inspection
Start date: 2017-05-24, end date: 2017-05-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of structures at the 8th floor level and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701572068
Unscheduled inspection
Start date: 2017-05-02, end date: 2017-05-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of supporting structures on the ground floor with the installation of supporting and enclosing structures on the 14th floor before the installation of supporting and enclosing structures on the 5th floor and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701535487
Unscheduled inspection
Start date: 2017-04-14, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170701518544
Unscheduled inspection
Start date: 2017-04-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701511727
Unscheduled inspection
Start date: 2017-04-06, end date: 2017-04-12, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of structures at the roof level, the installation of window blocks and building materials used in the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701567380
Unscheduled inspection
Start date: 2017-04-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701563654
Unscheduled inspection
Start date: 2017-04-27, end date: 2017-05-04, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the work on the installation of the pile field in the axes of the 16 m ASW and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The availability of a construction permit3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701502884
Unscheduled inspection
Start date: 2017-04-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701497425
Unscheduled inspection
Start date: 2017-04-04, end date: 2017-04-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of structures at the 5th floor level and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701493120
Unscheduled inspection
Start date: 2017-04-03, end date: 2017-04-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of a capital construction facility completed 2The receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701458400
Unscheduled inspection
Start date: 2017-03-17, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170701491029
Unscheduled inspection
Start date: 2017-03-31, end date: 2017-04-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the organization of the construction site, the removal of the axes of the object in kind, the development of the excavation in axes 16 and ASW and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701472417
Unscheduled inspection
Start date: 2017-03-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701416537
Unscheduled inspection
Start date: 2017-03-02, end date: 2017-03-09, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of the power supply system for low-current switchboard systems after the actual completion of work, the installation of internal cold and hot water supply systems for heating and drainage of boiler input units after the actual completion of work, the compliance of finishing works and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 The Urban Planning Code of the Russian Federation
# 74170701406548
Unscheduled inspection
Start date: 2017-02-27, end date: 2017-03-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the trench development work from KK1 Railway 43 to KK RAILWAY 60 with the installation of pipes from KK railway 60 + 70 meters and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of HH 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701406547
Unscheduled inspection
Start date: 2017-02-27, end date: 2017-03-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the development of a trench from VK 20 to PG 7, the installation of a pipeline from PG 7 to PG 7 + 120 meters, the installation of a water supply chamber PG 7, the installation of a water supply system into a residential building 57 and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2the receipt of a construction permit 3The fulfillment of the requirements of the HH 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701384849
Unscheduled inspection
Start date: 2017-02-21, end date: 2017-03-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of pile work prior to the start of work on the foundations and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the receipt of a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701334834
Unscheduled inspection
Start date: 2017-01-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701300842
Unscheduled inspection
Start date: 2017-01-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701302777
Unscheduled inspection
Start date: 2017-01-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701302826
Unscheduled inspection
Start date: 2017-01-20, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170701302726
Unscheduled inspection
Start date: 2017-01-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160701157612
Unscheduled inspection
Start date: 2016-12-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160701187745
Unscheduled inspection
Start date: 2016-12-06, end date: 2016-12-09, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of structures at the 7th floor level and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701240849
Unscheduled inspection
Start date: 2016-12-23, end date: 2016-12-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the trench development work preparation of the foundation installation of channel trays installation of the pipeline installation of UT 4140 and the construction materials used during construction as well as with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 art 52 of the Urban Planning Code
# 74160701064087
Unscheduled inspection
Start date: 2016-11-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160701150400
Unscheduled inspection
Start date: 2016-11-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160701150465
Unscheduled inspection
Start date: 2016-11-25, end date: 2016-12-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the excavation work preparation of the foundation installation of trays and building materials used during construction reconstruction removal of the heating network as well as the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 art 52 of the Urban Planning Code
# 74160701150344
Unscheduled inspection
Start date: 2016-11-25, end date: 2016-12-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the excavation work preparation of the foundation installation of trays and building materials used during construction reconstruction removal of the heating network as well as the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 art 52 of the Urban Planning Code
# 74160701039379
Unscheduled inspection
Start date: 2016-10-28, end date: 2016-12-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the excavation work preparation of the foundation installation of trays and building materials used during construction reconstruction removal of the heating network as well as the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 art 52 of the Urban Planning Code
# 74160701039309
Unscheduled inspection
Start date: 2016-10-28, end date: 2016-11-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the excavation work preparation of the foundation installation of trays and building materials used during construction reconstruction removal of the heating network as well as the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 art 52 of the Urban Planning Code
# 74160701039176
Unscheduled inspection
Start date: 2016-10-28, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74160700870064
Unscheduled inspection
Start date: 2016-10-04, end date: 2016-10-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of structures at the 1st floor level waterproofing of the foundation backfilling installation of structures at the 3rd floor level and the construction materials used during the construction of the capital construction facility, as well as the results of such work, to the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700072930
Unscheduled inspection
Start date: 2016-09-01, end date: 2016-09-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of a completed capital construction facility 2 Availability of a construction permit 3 Compliance with the requirements of hr 2 3 Art 51 of the Urban Planning Code of the Russian Federation
# 74160700071807
Unscheduled inspection
Start date: 2016-09-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160700110504
Unscheduled inspection
Start date: 2016-09-05, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74160700093767
Unscheduled inspection
Start date: 2016-09-06, end date: 2016-09-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of a completed capital construction facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 art. 2 of the Urban Planning Code of the Russian Federation
# 74160700093499
Unscheduled inspection
Start date: 2016-09-06, end date: 2016-09-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of a completed capital construction facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 art. 2 of the Urban Planning Code of the Russian Federation
# 74160700124831
Unscheduled inspection
Start date: 2016-09-12, end date: 2016-09-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of structures at the roof level and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160601743649
Unscheduled inspection
Start date: 2016-08-01, end date: 2016-08-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of structures of the 8th 9th 10th and technical floors and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160601742964
Unscheduled inspection
Start date: 2016-08-01, end date: 2016-08-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of window structures and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160601788622
Unscheduled inspection
Start date: 2016-08-22, end date: 2016-08-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of the pile field of monolithic strip grillings and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160601730566
Unscheduled inspection
Start date: 2016-07-27, end date: 2016-08-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of window structures, electrical installation and water supply systems and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation