Found 1 inspection:

# 742004472177
Unscheduled inspection
Start date: 2020-08-03, end date: 2020-08-07, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of enclosing structures made of sandwich panels with the installation of internal walls and partitions filling openings after completion of work finishing work installation of a lightning grid installation of technological equipment installation of a roof installation of elevators during the work installation of storm sewers K211 installation of electrical equipment installation of floors and used building materials during construction reconstruction of a capital construction facility as well as the results of such the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including the requirements of energy efficiency with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.