Found 18 inspections:

# 741903948499
Unscheduled inspection
Start date: 2019-11-20, end date: —, duration:
Authority:
Purpose of inspection:


# 741903014176
Unscheduled inspection
Start date: 2019-09-04, end date: 2019-09-10, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed when priming the pipe into 2 layers D426 from node 1 to node 2 painting the pipe D426 into 2 layers from node 1 to node 2 when cleaning the pipe with air and testing the pipeline and the building materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation2 Availability of a construction permit 3 Meeting the requirements hh 23i 31 st52 of the Urban Planning Code of the Russian Federation


# 741902954939
Unscheduled inspection
Start date: 2019-08-15, end date: 2019-08-21, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of compliance with the regulations of 230719 with a deadline of 1508192 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902867471
Unscheduled inspection
Start date: 2019-07-17, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741902816792
Unscheduled inspection
Start date: 2019-07-02, end date: —, duration:
Authority:
Purpose of inspection:


# 741902715536
Unscheduled inspection
Start date: 2019-06-04, end date: 2019-06-10, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the dismantling and installation of the gas pipeline from support 209 to support 128 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902715634
Unscheduled inspection
Start date: 2019-05-27, end date: —, duration:
Authority:
Purpose of inspection:


# 741902678379
Unscheduled inspection
Start date: 2019-04-30, end date: 2019-05-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of support posts for the gas pipeline D21921 pcs laying pipe D426 on supports 3537 4244 NO1150 and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code of the Russian Federation


# 741902562288
Unscheduled inspection
Start date: 2019-03-19, end date: 2019-03-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of the gas pipeline at the PK8PK14+905 site and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800422736
Unscheduled inspection
Start date: 2018-06-08, end date: 2018-06-15, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of trench development work, sand cushion installation, welding, laying of gas pipeline weaves, gas pipeline powder, laying of signal tape, backfilling of the gas pipeline and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800484797
Unscheduled inspection
Start date: 2018-06-25, end date: 2018-06-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the trench development work with the installation of a sand cushion welding laying of gas pipeline weaves sprinkling of a gas pipeline laying of a signal tape backfilling of a gas pipeline installation of an above-ground gas pipeline installation of a blizzard foundation installation installation of grounding and lightning removal installation of fencing of disconnecting devices and construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations project documentation 2 Availability of permits for construction 3 Meeting the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800205445
Unscheduled inspection
Start date: 2018-03-20, end date: 2018-03-22, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the execution of the instruction from 02032018, the deadline for execution is 12032018, 2 The availability of a building permit, 3 The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800232083
Unscheduled inspection
Start date: 2018-03-28, end date: 2018-04-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Conformity of work Installation of sections of medium and low pressure gas pipelines trench development foundation installation welding insulation of joints pipeline laying backfilling after completion of work Installation of aboveground sections of medium and low pressure gas pipelines drilling holes for supports installation of concrete foundations of supports installation of supports installation painting Installation of hydraulic fracturing after completion of work and applied building materials during the construction of a capital construction facility and as well as the results of such work, the requirements of the technical regulations of the project documentation 2 The availability of a building permit 3 The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800102130
Unscheduled inspection
Start date: 2018-02-27, end date: 2018-03-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Conformity of work installation of sections of medium and low pressure gas pipelines trench development foundation installation welding insulation of joints pipeline laying backfilling during work Installation of aboveground sections of medium and low pressure gas pipelines drilling holes for supports installation of concrete foundations supports installation of supports installation painting during work and applied building materials during the construction of a capital construction facility as well as the results of such work meet the requirements of the technical regulations of the project documentation 2 The availability of a building permit 3 The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802872164
Unscheduled inspection
Start date: 2017-11-22, end date: 2017-11-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the interior decoration of boiler rooms for the installation of internal engineering water supply and sanitation systems for supply and exhaust ventilation for the installation of electric power equipment and low-current AK OPS AGSP systems for compliance with fire and sanitary epidemiological measures and building materials used during the construction of a capital construction facility, as well as the results of such work, to the requirements of technical regulations of the project documentation2the receipt of a construction permit3compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170801941127
Unscheduled inspection
Start date: 2017-09-04, end date: 2017-09-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The completed construction object2the receipt of a construction permit3compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170701891049
Unscheduled inspection
Start date: 2017-08-18, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701842005
Unscheduled inspection
Start date: 2017-08-09, end date: 2017-08-15, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The performance of work on the construction of a high-pressure gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, comply with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation