# 74170701310344
Unscheduled inspection
Start date: 2017-01-25, end date: 2017-01-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of pipelines for heating systems prior to the start of insulation work of the water supply system during the work, the installation of a heating point during the work, the accounting unit for cold water supply and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Receipt of a construction permit3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation