# 74170701853619
Unscheduled inspection
Start date: 2017-08-07, end date: 2017-08-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of windows up to the slopes 2nd stage walls partitions 78 floors technical floor facade thermal insulation 2nd stage roof up to the top layer 2nd stage and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.