Found 31 inspection:

# 662101367886
Unscheduled inspection
Start date: 2021-11-25, end date: 2021-12-08, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to verify compliance with the requirements of Regulation No. 29-13-29/128 dated 10/29/2021 issued by RTS LLC, the purpose of this inspection is to carry out regional state construction supervision. The subject of this audit is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility "Three multi–storey residential buildings with built-in non-residential premises on the ground floors - block 5 of block No. 26 in the Academic planning area (construction phase 4): Stage 1 of construction is a multi–storey 1-sectional apartment building with built–in public facilities on the ground floor (No. 5.1 according to ROM); Stage 2 of construction is a multi-storey 1–sectional apartment building (No. 5.2 according to ROM); stage 3 of construction is a multi-storey 1-sectional apartment building with built-in public facilities on the ground floor (No. 5.3 on ROM)", located at the address: Yekaterinburg, as well as the results of such work to the requirements of sanitary and epidemiological rules and regulations, safety rules and state standards, project documentation.


# 692100225414
Unscheduled inspection
Start date: 2021-05-31, end date: —, duration: 7
Authority: Ministerstvo Tverskoi oblasti po obespecheniyu kontrolnyh funkcii
Purpose of inspection: Purpose: to verify the fulfillment of Regulation No. 17 dated 04/09/2021 (paragraphs 1-6) on the elimination of violations during the construction of a capital construction facility; task: to determine compliance with mandatory requirements established by the urban planning legislation of the Russian Federation; subject: compliance with the instructions of the state control (supervision) body, municipal control bodies; carrying out activities: to prevent harm to the life and health of citizens


# 662100076778
Unscheduled inspection
Start date: 2021-03-23, end date: 2021-04-05, duration: 14
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations; Tasks - the implementation of regional state construction supervision; Subject - the implementation of a previously issued instruction on the elimination of an identified violation of mandatory requirements


# 112004459493
Unscheduled inspection
Start date: 2020-07-21, end date: 2020-07-31, duration: 9
Authority: Sluzhba Respubliki Komi stroitelnogo zhilischnogo i tehnicheskogo nadzora kontrolya
Purpose of inspection: This audit is conducted for the purpose of conducting an audit in accordance with the audit program. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the technical customer. The subject of this audit is compliance with mandatory requirements the conformity of the work performed and the building materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model in if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used to meet the requirements of Parts 2 to 3 of Article 52 of this Code.


# 112004307152
Unscheduled inspection
Start date: 2020-02-04, end date: 2020-02-14, duration: 9
Authority: Sluzhba Respubliki Komi stroitelnogo zhilischnogo i tehnicheskogo nadzora kontrolya
Purpose of inspection: This inspection is conducted for the purpose of conducting an inspection in accordance with the inspection program.


# 112004236933
Unscheduled inspection
Start date: 2020-02-04, end date: 2020-02-14, duration:
Authority: Sluzhba Respubliki Komi stroitelnogo zhilischnogo i tehnicheskogo nadzora kontrolya
Purpose of inspection: This audit is conducted for the purpose of conducting an audit in accordance with the audit program. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the technical customer. The subject of this audit is compliance with mandatory requirements the conformity of the work performed and the building materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model in if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used to meet the requirements of Parts 2 to 3 of Article 52 of this Code.


# 661903936690
Unscheduled inspection
Start date: 2019-11-07, end date: —, duration:
Authority:
Purpose of inspection:


# 661903944510
Unscheduled inspection
Start date: 2019-11-12, end date: —, duration:
Authority:
Purpose of inspection:


# 111903956337
Unscheduled inspection
Start date: 2019-10-08, end date: 2019-10-18, duration: 9
Authority: Sluzhba Respubliki Komi stroitelnogo zhilischnogo i tehnicheskogo nadzora kontrolya
Purpose of inspection: conducting an inspection in accordance with the inspection program


# 111903800001
Unscheduled inspection
Start date: 2019-10-08, end date: 2019-10-18, duration:
Authority: Sluzhba Respubliki Komi stroitelnogo zhilischnogo i tehnicheskogo nadzora kontrolya
Purpose of inspection: This audit is conducted for the purpose of conducting an audit in accordance with the audit program. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the technical customer. The subject of this audit is compliance with mandatory requirements the conformity of the work performed and the building materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model in if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used to meet the requirements of Parts 2 to 3 of Article 52 of this Code.


# 111902743344
Unscheduled inspection
Start date: 2019-06-04, end date: 2019-06-14, duration:
Authority: Sluzhba Respubliki Komi stroitelnogo zhilischnogo i tehnicheskogo nadzora kontrolya
Purpose of inspection: This audit is conducted for the purpose of conducting an audit in accordance with the audit program. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the technical customer. The subject of this audit is compliance with mandatory requirements the conformity of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation, compliance with the requirements of parts 2 to 3 of Article 52 of this Code, to be verified


# 661902723432
Unscheduled inspection
Start date: 2019-05-20, end date: 2019-05-31, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 6 To establish that this audit is being conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 2913075P dated February 01, 2019. The objectives of this audit are to carry out regional state construction supervision.7 The subject of this audit is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 2913075P dated February 01, 2019


# 661902558975
Unscheduled inspection
Start date: 2019-04-08, end date: 2019-04-26, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The audit is conducted in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607817 dated October 29, 2018. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607817 dated October 29, 2018.


# 111902544467
Unscheduled inspection
Start date: 2019-03-19, end date: 2019-03-29, duration:
Authority: Sluzhba Respubliki Komi stroitelnogo zhilischnogo i tehnicheskogo nadzora kontrolya
Purpose of inspection: This audit is conducted for the purpose of conducting an audit in accordance with the audit program. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the technical customer. The subject of this audit is compliance with mandatory requirements the conformity of the work performed and the building materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and the fulfillment of the requirements of the parts 2 3 and 31 of Article 52 of this Code


# 111802162358
Unscheduled inspection
Start date: 2018-12-04, end date: 2018-12-14, duration:
Authority: Sluzhba Respubliki Komi stroitelnogo zhilischnogo i tehnicheskogo nadzora kontrolya
Purpose of inspection: This audit is conducted for the purpose of conducting an audit in accordance with the audit program. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the technical customer. The subject of this audit is compliance with mandatory requirements the conformity of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and the fulfillment of the requirements of the parts 2 3 and 31 of Article 52 of this Code


# 661802286624
Unscheduled inspection
Start date: 2018-12-12, end date: 2018-12-25, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 6 To establish that this inspection is being conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291307224P dated October 05, 2018. The objectives of this inspection are to carry out regional state construction supervision. 7 The subject of this inspection is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291307224P dated October 05, 2018.


# 661802062248
Unscheduled inspection
Start date: 2018-11-19, end date: —, duration:
Authority:
Purpose of inspection:


# 111801681591
Unscheduled inspection
Start date: 2018-10-02, end date: 2018-10-12, duration:
Authority: Sluzhba Respubliki Komi stroitelnogo zhilischnogo i tehnicheskogo nadzora kontrolya
Purpose of inspection: This audit is conducted for the purpose of conducting an audit in accordance with the audit program. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the technical customer. verification of the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of this Code


# 661801933206
Unscheduled inspection
Start date: 2018-10-16, end date: 2018-10-29, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The audit is conducted in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291605120 dated March 21, 2018. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291605120 dated March 21, 2018.


# 661801233164
Unscheduled inspection
Start date: 2018-09-17, end date: 2018-10-12, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: It is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 29130785 dated March 16, 2018. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 29130785 dated March 16, 2018.


# 111800513610
Unscheduled inspection
Start date: 2018-07-03, end date: —, duration:
Authority:
Purpose of inspection:


# 661800089760
Unscheduled inspection
Start date: 2018-02-19, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 661800090933
Unscheduled inspection
Start date: 2018-02-26, end date: —, duration:
Authority:
Purpose of inspection:


# 66170802872080
Unscheduled inspection
Start date: 2017-11-21, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 66170802633824
Unscheduled inspection
Start date: 2017-10-02, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 66170801916248
Unscheduled inspection
Start date: 2017-08-28, end date: 2017-09-22, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the inspection program 36106 dated December 05, 2016. The objectives of this inspection are to carry out regional state construction supervision. The purpose of this inspection is to verify the compliance of the work and applicable building materials during the construction of a capital construction facility "3-section residential building with variable storeys with built-in non-residential premises in the basement and 1st floor in sections 1 according to ROM and a built-in 1-level underground parking lot 2 on ROM" located at Yekaterinburg, Verkhisetsky district, Khomyakov Vanilina Street, the results of such work meet the requirements of technical regulations for project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code. the Code of the Russian Federation


# 66170801916217
Unscheduled inspection
Start date: 2017-08-22, end date: 2017-09-04, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The audit is conducted in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291605463 dated June 22, 2017. The objectives of this audit are to carry out regional state construction supervision. The purpose of this audit is to comply with the previously issued instruction on the elimination of identified violations of mandatory requirements 291605463 dated June 22, 2017


# 66170701619373
Unscheduled inspection
Start date: 2017-05-22, end date: 2017-06-02, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the inspection program 36107 dated 05/122016. The objectives of this inspection are the implementation of regional state construction supervision


# 66170701381693
Unscheduled inspection
Start date: 2017-02-08, end date: 2017-02-17, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program 301201220153 dated January 15, 2016. The objectives of this inspection are to carry out regional state construction supervision. The purpose of this inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Hotel building 1 on ROM with integrated outdoor parking transformer substation 2 on ROM" located on 166 Bazhova St., Yekaterinburg Oktyabrsky District, the results of such work meet the requirements of technical regulations, fire safety requirements, safety rules and state standards for project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation Federations


# 66160701062246
Unscheduled inspection
Start date: 2016-11-01, end date: 2016-11-11, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program 301201220153 dated January 15, 2016, the objectives of which are to carry out state construction supervision. The purpose of this inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Hotel building 1 on ROM with integrated outdoor parking transformer substation 2 on ROM" located at 166 Bazhova St., Yekaterinburg, Oktyabrsky district, the results of such work relate to building codes and regulations, fire safety requirements, safety rules and state standards, as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities


# 66160601750256
Unscheduled inspection
Start date: 2016-09-05, end date: 2016-09-16, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291604404 P2 dated July 22, 2016, the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291604404 P2 dated July 22, 2016, the task of this audit is to carry out state construction supervision


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.