Found 18 inspections:

# 632100696354
Unscheduled inspection
Start date: 2021-09-15, end date: —, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.


# 632100768141
Unscheduled inspection
Start date: 2021-09-20, end date: —, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection:


# 632100391706
Unscheduled inspection
Start date: 2021-08-02, end date: —, duration:
Authority:
Purpose of inspection:


# 632100188329
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-05-28, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.


# 632100155799
Unscheduled inspection
Start date: 2021-04-26, end date: 2021-05-28, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.


# 632004443306
Unscheduled inspection
Start date: 2020-07-06, end date: —, duration:
Authority:
Purpose of inspection:


# 632004443302
Unscheduled inspection
Start date: 2020-07-06, end date: 2020-07-10, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 632004461621
Unscheduled inspection
Start date: 2020-07-22, end date: 2020-07-24, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 632004461611
Unscheduled inspection
Start date: 2020-07-22, end date: 2020-07-24, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 632004430628
Unscheduled inspection
Start date: 2020-06-11, end date: —, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection:


# 632004430614
Unscheduled inspection
Start date: 2020-06-11, end date: —, duration:
Authority:
Purpose of inspection:


# 632004408975
Unscheduled inspection
Start date: 2020-05-18, end date: 2020-05-29, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 632004408990
Unscheduled inspection
Start date: 2020-05-18, end date: —, duration:
Authority:
Purpose of inspection:


# 632004408967
Unscheduled inspection
Start date: 2020-05-18, end date: 2020-05-29, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 632004408961
Unscheduled inspection
Start date: 2020-05-18, end date: —, duration:
Authority:
Purpose of inspection:


# 632004408954
Unscheduled inspection
Start date: 2020-05-18, end date: 2020-05-29, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 632004408948
Unscheduled inspection
Start date: 2020-05-18, end date: —, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection:


# 632004408982
Unscheduled inspection
Start date: 2020-05-18, end date: 2020-05-29, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.