Found 5 inspections:

# 742100274758
Unscheduled inspection
Start date: 2021-06-15, end date: 2021-07-12, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the Installation of the pulp pipeline (No. 3), installation of pumping units of the pulp pump station PNS-1; PNS-2; PNS-3, installation of station pipelines of the pulp pump station PNS-1; PNS-2; PNS-3, installation of station pipelines of emergency tank No. 1; No.2. and the construction materials used in the process of construction, reconstruction of the capital construction facility, as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100184656
Unscheduled inspection
Start date: 2021-05-11, end date: 2021-05-31, duration: 15
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the Installation of the pulp pipeline (No. 3), installation of pumping units of the pulp pumping station PNS-1; PNS-2; PNS-3 and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 this Code of Project documentation (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities that are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100094456
Unscheduled inspection
Start date: 2021-03-31, end date: 2021-04-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on 1) Sand preparation device for w/b blocks 2) Installation of concrete blocks 3) Installation of sliding supports for the pulp pipeline (3 threads) 4) Installation of guide supports for the pulp pipeline (3 threads) 5) Installation of the pulp pipeline (3 threads) and used building materials during construction, reconstruction the capital construction facility, as well as the results of such work, meet the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintaining an information model is mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742004387024
Unscheduled inspection
Start date: 2020-04-02, end date: 2020-04-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the construction of a water pipeline for the production needs of a technological highway from a pumping station to a highway in the village of Poletaevo1 with the construction of a pumping station, the construction of a water intake structure with a fish protection structure and the construction materials used during the construction of the reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the design approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code documentation, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and equipment requirements capital construction facility with metering devices for used energy resources2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741904094861
Unscheduled inspection
Start date: 2019-12-24, end date: 2020-01-15, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 1 Compliance of works on the construction of a water pipeline for the production needs of a technological highway from a pumping station to a highway in the village of Poletaevo1 with the construction of a pumping station, the construction of a water intake structure with a fish protection structure and the construction materials used in the construction process of reconstruction of a capital construction facility, as well as the results of such works, with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Code project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and requirements equipment of the capital construction facility with metering devices for used energy resources2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.