Found 317 inspections:

# 00160700522453
Unscheduled inspection
Start date: 2016-08-10, end date: 2016-08-11, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 28072016 6231 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 25072016 1219961001 to 22082016G Tasks The purpose of this audit is to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, while eliminating previously identified violations. The purpose of this audit is to comply with the instructions of state control bodies, municipal control bodies


# 00160601729571
Unscheduled inspection
Start date: 2016-07-20, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 00160601752156
Unscheduled inspection
Start date: 2016-07-29, end date: 2016-08-02, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the Inspection notification dated 15072016 5788 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 08072016 1219056202 to 05082016G Tasks This audit is aimed at preventing as well as detecting and suppressing violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of a capital construction facility, while eliminating previously identified violations. The subject of this audit is compliance with the instructions of state control bodies, supervision bodies, municipal control bodies


# 162101446593
Unscheduled inspection
Start date: 2021-12-10, end date: —, duration: 1
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 09/01/2021 case No. 12-04-2021/0075. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is (select the appropriate one): compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 162101424990
Unscheduled inspection
Start date: 2021-12-08, end date: —, duration: 8
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 11/08/2021 case No. 17-04-2021/0089. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. 7. The subject of this audit is (select the appropriate one): ☑ compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 162101424920
Unscheduled inspection
Start date: 2021-12-08, end date: —, duration:
Authority:
Purpose of inspection:


# 162101431297
Unscheduled inspection
Start date: 2021-12-06, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162101431351
Unscheduled inspection
Start date: 2021-12-06, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162101430981
Unscheduled inspection
Start date: 2021-12-06, end date: —, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, design documentation, and other regulations (norms and rules), as well as to draw up an act on the elimination of violations, based on the Inspection notification dated 11/30/2021 No. 13423 on the elimination of violations during construction, reconstruction of the capital construction facility, which were ordered to be eliminated. within the period established by the regulation dated 09/20/2021 No. 17-12/0366-01, until 11/30/2021. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. compliance with the regulations of state control (supervision) bodies and municipal control bodies;


# 162101429342
Unscheduled inspection
Start date: 2021-12-06, end date: —, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 02.12.2021 case No. 17-04-2021/0054. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162101429316
Unscheduled inspection
Start date: 2021-12-06, end date: —, duration:
Authority:
Purpose of inspection:


# 162101431064
Unscheduled inspection
Start date: 2021-12-06, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162101413568
Unscheduled inspection
Start date: 2021-12-06, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162101414013
Unscheduled inspection
Start date: 2021-12-06, end date: —, duration:
Authority:
Purpose of inspection:


# 162101413891
Unscheduled inspection
Start date: 2021-12-06, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of execution of the order dated 02.11.2021 No. 17-12/0438-01, the deadline for which expired on 26.11.2021 and drawing up an act based on the results of the inspection. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. 7. The subject of this review is (select the appropriate one): ☑ compliance with the regulations of state control (supervision) bodies, municipal control bodies;


# 162101413807
Unscheduled inspection
Start date: 2021-12-06, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of execution of the order dated 02.11.2021 No. 17-12/0438-01, the deadline for which expired on 26.11.2021 and drawing up an act based on the results of the inspection. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. 7. The subject of this review is (select the appropriate one): ☑ compliance with the regulations of state control (supervision) bodies, municipal control bodies;


# 162101413677
Unscheduled inspection
Start date: 2021-12-06, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of execution of the order dated 28.10.2021 No. 17-12/0423-01, the deadline for which expired on 26.11.2021 and drawing up an act based on the results of the inspection. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. 7. The subject of this review is (select the appropriate one): ☑ compliance with the regulations of state control (supervision) bodies, municipal control bodies;


# 162101413472
Unscheduled inspection
Start date: 2021-12-06, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of execution of the order dated 02.11.2021 No. 17-12/0440-01, the deadline for which expired on 26.11.2021 and drawing up an act based on the results of the inspection. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. 7. The subject of this review is (select the appropriate one): ☑ compliance with the regulations of state control (supervision) bodies, municipal control bodies;


# 162101510390
Unscheduled inspection
Start date: 2021-12-27, end date: —, duration:
Authority:
Purpose of inspection:


# 162101510155
Unscheduled inspection
Start date: 2021-12-27, end date: —, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the completed works, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as for the purpose of drawing up an act of inspection of the completed facility, in accordance with the notice received by the Inspectorate dated 12/21/2021 No. 14350 on the completion of the construction of the capital construction facility. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162101509980
Unscheduled inspection
Start date: 2021-12-27, end date: —, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the completed works, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as for the purpose of drawing up an act of inspection of the completed facility, in accordance with the notice received by the Inspectorate dated 12/16/2021 No. 14427 on the completion of the construction of the capital construction facility. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162101412994
Unscheduled inspection
Start date: 2021-12-03, end date: —, duration:
Authority:
Purpose of inspection:


# 162101412920
Unscheduled inspection
Start date: 2021-12-03, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162101412793
Unscheduled inspection
Start date: 2021-12-03, end date: —, duration:
Authority:
Purpose of inspection:


# 162101413213
Unscheduled inspection
Start date: 2021-12-03, end date: —, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 11/10/2021 case No. 17-04-2021/0063. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162101432134
Unscheduled inspection
Start date: 2021-12-15, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162101433173
Unscheduled inspection
Start date: 2021-12-13, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 03.12.2021 case No. 17-04-2021/0020. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. . The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162101433562
Unscheduled inspection
Start date: 2021-12-13, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 03.12.2021 case No. 17-04-2021/0064. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162101433401
Unscheduled inspection
Start date: 2021-12-13, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 03.12.2021 case No. 17-04-2021/0063. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162101433286
Unscheduled inspection
Start date: 2021-12-13, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 03.12.2021 case No. 17-04-2021/0057. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162101433331
Unscheduled inspection
Start date: 2021-12-13, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 03.12.2021 case No. 17-04-2021/0058. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162101433614
Unscheduled inspection
Start date: 2021-12-13, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 03.12.2021 case No. 17-04-2021/0065. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162101329011
Unscheduled inspection
Start date: 2021-11-11, end date: —, duration:
Authority:
Purpose of inspection:


# 162101328232
Unscheduled inspection
Start date: 2021-11-11, end date: —, duration:
Authority:
Purpose of inspection:


# 162101377568
Unscheduled inspection
Start date: 2021-11-23, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, design documentation, and other regulations (norms and rules), as well as to draw up an act on the elimination of violations, based on the Inspection notification dated 11/17/2021 No. 12721 on the elimination of violations during construction, reconstruction of the capital construction facility, which was ordered to eliminate within the period established by the regulation dated 29.10.2021 No. 17-12/0428-01, until 15.11.2021. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. compliance with the regulations of state control (supervision) bodies and municipal control bodies;


# 162101374429
Unscheduled inspection
Start date: 2021-11-23, end date: —, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 09.12.2020 case No. 12-04-2020/0111. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this review is (select the appropriate one): compliance with mandatory requirements and/or requirements established by municipal legal acts


# 162101377539
Unscheduled inspection
Start date: 2021-11-23, end date: —, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, design documentation, and other regulations (norms and rules), as well as to draw up an act on the elimination of violations, based on the Inspection notification dated 11/17/2021 No. 12720 on the elimination of violations during construction, reconstruction of the capital construction facility, which was ordered to eliminate within the period established by the regulation dated 29.10.2021 No. 17-12/0427-01, until 15.11.2021. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. compliance with the regulations of state control (supervision) bodies and municipal control bodies;


# 162101347511
Unscheduled inspection
Start date: 2021-11-24, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162101347558
Unscheduled inspection
Start date: 2021-11-24, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 01/18/2021 case No. 12-04-2020/0121. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.


# 162101353643
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162101353520
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration:
Authority:
Purpose of inspection:


# 162101354081
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated October 26, 2021, case No. 17-04-2021/0082. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. 7. The subject of this audit is (select the appropriate one): ☑ compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 162101353887
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated October 26, 2021, case No. 17-04-2021/0081. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. 7. The subject of this audit is (select the appropriate one): ☑ compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 162101353579
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 10/21/2021 case No. 17-04-2021/0081. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. 7. The subject of this audit is (select the appropriate one): ☑ compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 162101353452
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 10/21/2021 case No. 17-04-2021/0079. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. 7. The subject of this audit is (select the appropriate one): ☑ compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 162101287892
Unscheduled inspection
Start date: 2021-10-29, end date: —, duration:
Authority:
Purpose of inspection:


# 162101287623
Unscheduled inspection
Start date: 2021-10-29, end date: —, duration:
Authority:
Purpose of inspection:


# 162101287483
Unscheduled inspection
Start date: 2021-10-29, end date: —, duration:
Authority:
Purpose of inspection:


# 162101287391
Unscheduled inspection
Start date: 2021-10-29, end date: —, duration:
Authority:
Purpose of inspection:


# 162101261177
Unscheduled inspection
Start date: 2021-10-25, end date: —, duration:
Authority:
Purpose of inspection:


# 162101261027
Unscheduled inspection
Start date: 2021-10-25, end date: —, duration:
Authority:
Purpose of inspection:


# 162101258502
Unscheduled inspection
Start date: 2021-10-22, end date: —, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 09/06/2021 case No. 17-04-2021/0058. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162101258292
Unscheduled inspection
Start date: 2021-10-22, end date: —, duration:
Authority:
Purpose of inspection:


# 162101258455
Unscheduled inspection
Start date: 2021-10-22, end date: —, duration:
Authority:
Purpose of inspection:


# 162101258411
Unscheduled inspection
Start date: 2021-10-22, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162101258368
Unscheduled inspection
Start date: 2021-10-22, end date: —, duration:
Authority:
Purpose of inspection:


# 162100778056
Unscheduled inspection
Start date: 2021-09-16, end date: —, duration:
Authority:
Purpose of inspection:


# 162100777905
Unscheduled inspection
Start date: 2021-09-16, end date: —, duration:
Authority:
Purpose of inspection:


# 162100777601
Unscheduled inspection
Start date: 2021-09-16, end date: —, duration:
Authority:
Purpose of inspection:


# 162100777744
Unscheduled inspection
Start date: 2021-09-16, end date: —, duration:
Authority:
Purpose of inspection:


# 162100666753
Unscheduled inspection
Start date: 2021-09-10, end date: —, duration:
Authority:
Purpose of inspection:


# 162101065377
Unscheduled inspection
Start date: 2021-09-29, end date: —, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 09.12.2020 case No. 12-04-2020/0111. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this review is (select the appropriate one): compliance with mandatory requirements and/or requirements established by municipal legal acts


# 162100894531
Unscheduled inspection
Start date: 2021-09-22, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 09/17/2021 case No. 17-04-2021/0062. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162100894690
Unscheduled inspection
Start date: 2021-09-22, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 09/17/2021 case No. 17-04-2021/0063. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162100894951
Unscheduled inspection
Start date: 2021-09-22, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 09/17/2021 case No. 17-04-2021/0065. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162100894819
Unscheduled inspection
Start date: 2021-09-22, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 09/17/2021 case No. 17-04-2021/0064. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162100578450
Unscheduled inspection
Start date: 2021-09-01, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 08/16/2021 case No. 17-04-2021/0054. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162100468309
Unscheduled inspection
Start date: 2021-08-16, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162100508255
Unscheduled inspection
Start date: 2021-08-23, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 08/12/2021 case No. 17-04-2021/0020. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162100340253
Unscheduled inspection
Start date: 2021-07-19, end date: —, duration:
Authority:
Purpose of inspection:


# 162100377668
Unscheduled inspection
Start date: 2021-07-28, end date: —, duration: 1
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 09/16/2020 case No. 12-04-2020/0081. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.


# 162100379186
Unscheduled inspection
Start date: 2021-07-28, end date: —, duration: 1
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 01/18/2021 case No. 12-04-2020/0121. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.


# 162100377357
Unscheduled inspection
Start date: 2021-07-23, end date: —, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 09.12.2020 case No. 12-04-2020/0111. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this review is (select the appropriate one): compliance with mandatory requirements and/or requirements established by municipal legal acts


# 162100365922
Unscheduled inspection
Start date: 2021-07-21, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 07/28/2021 case No. 17-04-2021/0020. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162100366004
Unscheduled inspection
Start date: 2021-07-21, end date: —, duration:
Authority:
Purpose of inspection:


# 162100365972
Unscheduled inspection
Start date: 2021-07-21, end date: —, duration:
Authority:
Purpose of inspection:


# 162100178275
Unscheduled inspection
Start date: 2021-05-06, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162100122356
Unscheduled inspection
Start date: 2021-05-05, end date: —, duration:
Authority:
Purpose of inspection:


# 162100122305
Unscheduled inspection
Start date: 2021-05-05, end date: —, duration:
Authority:
Purpose of inspection:


# 162100159925
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-04-23, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 03/15/2021 case No. 17-04-2021/0018. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162100159956
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-04-23, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 03/15/2021 case No. 17-04-2021/0019. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162100159891
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-04-23, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 03/15/2021 case No. 17-04-2021/0017. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162100153131
Unscheduled inspection
Start date: 2021-04-15, end date: 2021-04-21, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 03/26/2021 case No. 17-04-2021/0021. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162100111729
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-09, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 03/15/2021 case No. 17-04-2021/0018. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162100108984
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-05, duration: 1
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, design documentation, other regulations (norms and rules), to determine the fact of execution of the order, as well as to draw up an act on the elimination of violations (execution of the order), based on the Inspection notification dated 03.03.2021 No. 1964 on the elimination of violations during construction, reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by Regulation No. 12-12/1273-01 dated 12/29/2020, until 01/29/2021 and the expiration of Regulation No. 12-12/1273-01 dated 12/29/2020, the deadline for which expired on 01/29/2021. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this review is (select the appropriate one): compliance with mandatory requirements and/or requirements established by municipal legal acts;


# 162100112117
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-09, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 03/15/2021 case No. 17-04-2021/0019. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162100101761
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-30, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the completed works, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as for the purpose of drawing up an act of inspection of the completed facility, in accordance with the notice received by the Inspectorate dated 03/24/2021 No. 2669 on the completion of the construction of the capital construction facility. prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility.


# 162100106815
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-09, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2, 3 and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 12/29/2018 case No. 12-11-2018/0134.


# 162100111627
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-09, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 03/15/2021 case No. 17-04-2021/0017. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. 7. The subject of this audit is compliance with mandatory requirements and (or) requirements established by municipal legal acts.;


# 162100186719
Unscheduled inspection
Start date: 2021-04-28, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 03/26/2021 case No. 17-04-2021/0022. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162100043501
Unscheduled inspection
Start date: 2021-03-15, end date: 2021-03-19, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 04/20/2020 case No. 12-04-2020/0024. ☑ compliance with mandatory requirements and/or requirements established by municipal legal acts;


# 162100112066
Unscheduled inspection
Start date: 2021-03-31, end date: 2021-04-02, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 03/26/2021 case No. 17-04-2021/0022. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162100106784
Unscheduled inspection
Start date: 2021-03-31, end date: 2021-04-02, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 03/26/2021 case No. 17-04-2021/0021. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162100043092
Unscheduled inspection
Start date: 2021-03-04, end date: 2021-03-05, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, design documentation, and other regulations (norms and rules), as well as to draw up an act on the elimination of violations, based on notice No. 1743 received by the Inspectorate on 02/25/2021 on the elimination of violations during construction and reconstruction of a capital construction facility, which were ordered to be eliminated. within the period established by the regulation dated 10.12.2020 No. 12-12/1175-01, until 02.26.2021. Prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility.


# 162100038110
Unscheduled inspection
Start date: 2021-03-02, end date: 2021-03-04, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 09/16/2020 case No. 12-04-2020/0081. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.


# 162100038040
Unscheduled inspection
Start date: 2021-03-02, end date: 2021-03-04, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 10/15/2019 case No. 12-11-2019/0125. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.


# 162100038152
Unscheduled inspection
Start date: 2021-03-02, end date: 2021-03-04, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 01/18/2021 case No. 12-04-2020/0121. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.


# 162100036737
Unscheduled inspection
Start date: 2021-03-02, end date: 2021-03-12, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, design documentation, and other regulations (norms and rules), as well as to draw up an act on the elimination of violations, based on notice No. 1589 received by the Inspectorate on 02/19/2021 on the elimination of violations during construction, reconstruction of a capital construction facility, which were ordered to be eliminated. within the period established by the regulation dated 01/25/2021 No. 12-12/0029-01, until 02/22/2021. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is (select the appropriate one): compliance with the regulations of state control (supervision) bodies, municipal control bodies;


# 162100093485
Unscheduled inspection
Start date: 2021-03-25, end date: 2021-03-31, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 09.12.2020 case No. 12-04-2020/0111. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this review is (select the appropriate one): compliance with mandatory requirements and/or requirements established by municipal legal acts;


# 162100083487
Unscheduled inspection
Start date: 2021-03-22, end date: 2021-03-26, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 03/15/2021 case No. 17-04-2021/0017. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162100083595
Unscheduled inspection
Start date: 2021-03-22, end date: 2021-03-26, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 03/15/2021 case No. 17-04-2021/0020. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162100083572
Unscheduled inspection
Start date: 2021-03-22, end date: 2021-03-26, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 03/15/2021 case No. 17-04-2021/0019. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162100083540
Unscheduled inspection
Start date: 2021-03-22, end date: —, duration:
Authority:
Purpose of inspection:


# 162100083395
Unscheduled inspection
Start date: 2021-03-22, end date: 2021-03-26, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 02/09/2021 case No. 17-04-2021/0011. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162100026012
Unscheduled inspection
Start date: 2021-02-19, end date: 2021-02-26, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 02/09/2021 case No. 17-04-2021/0011. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162105301733
Unscheduled inspection
Start date: 2021-01-19, end date: 2021-01-25, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, and the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 09.12.2020 case No. 12-04-2020/0111. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is (select the appropriate one): compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 162005249732
Unscheduled inspection
Start date: 2020-12-03, end date: 2020-12-30, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as to draw up an inspection report on the completed construction of the facility in accordance with the received to the Inspection by notification dated 25112020 13008 on the completion of the construction of the capital construction facility, the objectives of this inspection are to prevent, identify and prevent violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation7 The subject of this inspection is to select the appropriate compliance with mandatory requirements and or requirements established by municipal legal acts


# 162005249777
Unscheduled inspection
Start date: 2020-12-03, end date: 2020-12-30, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as to draw up an inspection report on the completed construction of the facility in accordance with the received to the Inspection by notification dated 25112020 13007 on the completion of the construction of the capital construction facility, the objectives of this inspection are to prevent, identify and prevent violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance of the works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation7 The subject of this inspection is to select the appropriate compliance with mandatory requirements and or requirements established by municipal legal acts


# 162005290001
Unscheduled inspection
Start date: 2020-12-28, end date: 2020-12-28, duration: 1
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 22122020 14721 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 12102020 1212097301 to 25122020 Prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility


# 162005286043
Unscheduled inspection
Start date: 2020-12-28, end date: 2020-12-29, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to establish compliance with the requirements of Part 5 of Article 52 of the Urban Planning Code of the Russian Federation, as well as to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and the implementation of the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of the notice received by the Inspectorate on the start of construction of a capital construction facility dated 04122020 13816the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of the work performed during the construction of the capital construction facility technical regulations, other regulatory legal acts and project documentation The subject of this audit is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 162005215057
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-12-04, duration: 15
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program from 15042020 case 170420200017the objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation7 carried out by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations, other regulatory legal acts and project documentation7the subject of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 162005215107
Unscheduled inspection
Start date: 2020-11-16, end date: —, duration:
Authority:
Purpose of inspection:


# 162005214819
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-12-04, duration: 15
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program from 15042020 case 170420200018the objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation7 carried out by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations, other regulatory legal acts and project documentation7the subject of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 162005215275
Unscheduled inspection
Start date: 2020-11-09, end date: 2020-11-30, duration: 16
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program from 23032020 case 170420200012the objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation7 carried out by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations, other regulatory legal acts and project documentation7the subject of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 162005215165
Unscheduled inspection
Start date: 2020-11-09, end date: —, duration:
Authority:
Purpose of inspection:


# 162005210999
Unscheduled inspection
Start date: 2020-11-09, end date: 2020-11-10, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the Inspection notification dated 27102020 11903 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 28082020 1212079701 to 28102020G Tasks The purpose of this audit is to prevent as well as identify and suppress violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentationthe purpose of this audit is to select the necessary compliance with the instructions of state control bodies, supervision bodies, municipal control bodies.


# 162005205132
Unscheduled inspection
Start date: 2020-11-09, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162005246567
Unscheduled inspection
Start date: 2020-11-30, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162005237400
Unscheduled inspection
Start date: 2020-11-30, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162005237364
Unscheduled inspection
Start date: 2020-11-30, end date: 2020-12-25, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as to draw up an inspection report on the completed construction of the facility in accordance with the received to the Inspection by notification dated 18112020 12791 on the completion of the construction of the capital construction facility, the objectives of this inspection are to prevent, identify and prevent violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance of the works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation7 The subject of this inspection is to select the appropriate compliance with mandatory requirements and or requirements established by municipal legal acts


# 162005237322
Unscheduled inspection
Start date: 2020-11-30, end date: —, duration:
Authority:
Purpose of inspection:


# 162005237271
Unscheduled inspection
Start date: 2020-11-30, end date: 2020-12-25, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as to draw up an inspection report on the completed construction of the facility in accordance with the received to the Inspection by notification dated 18112020 12789 on the completion of the construction of the capital construction facility, the objectives of this inspection are to prevent, identify and prevent violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation7 The subject of this inspection is to select the appropriate compliance with mandatory requirements and or requirements established by municipal legal acts


# 162005180745
Unscheduled inspection
Start date: 2020-10-19, end date: 2020-11-13, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as to draw up an inspection report on the completed construction of the facility in accordance with the received by notification dated 07102020 11038 to the Inspection on the completion of the construction of the capital construction facility, the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. mandatory requirements and or requirements established by municipal legal acts


# 162005180671
Unscheduled inspection
Start date: 2020-10-19, end date: 2020-11-13, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as to draw up an inspection report on the completed construction of the facility in accordance with the received by notification dated 07102020 11039 to the Inspection on the completion of the construction of the capital construction facility, the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. mandatory requirements and or requirements established by municipal legal acts


# 162005145714
Unscheduled inspection
Start date: 2020-10-01, end date: 2020-10-02, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules for determining the fact of execution of the order, as well as for the purpose of drawing up an act on the elimination of violations of the order based on the notice received by the Inspectorate from 21092020 10307 21092020 10305 on the elimination of violations during the construction of the reconstruction of the capital construction facility that were ordered to be eliminated in the period established by the regulation from 01092020 1212080902 01092020 1212080901 to 18092020 18092020 and the expiration of the period for the execution of the regulation from 01092020 1212080902 01092020 1212080901 the deadline for which expired 18092020 18092020 The objectives of this audit are the prevention as well as the identification and suppression of violations committed by the developer customer a person carrying out construction on the basis of a contract with the developer or customer of compliance with the works performed during the construction of the capital construction facility to meet the requirements of technical regulations, other regulatory legal acts and project documentation, the subject of this audit is compliance with the requirements of state control bodies, municipal control bodies


# 162005187750
Unscheduled inspection
Start date: 2020-10-20, end date: —, duration:
Authority:
Purpose of inspection:


# 162005187740
Unscheduled inspection
Start date: 2020-10-20, end date: —, duration:
Authority:
Purpose of inspection:


# 162005189543
Unscheduled inspection
Start date: 2020-10-21, end date: 2020-10-30, duration: 8
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program from 15042020 case 170420200017 The objectives of this inspection are to prevent as well as identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 162005189526
Unscheduled inspection
Start date: 2020-10-21, end date: 2020-10-30, duration: 8
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine whether the completed works used in the construction of an object of capital construction of building materials, the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the program of inspections from 23032020 case 170420200012 The objectives of this audit are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of a capital construction facility, the subject of this audit is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 162005189583
Unscheduled inspection
Start date: 2020-10-21, end date: —, duration:
Authority:
Purpose of inspection:


# 162005189550
Unscheduled inspection
Start date: 2020-10-21, end date: 2020-10-30, duration: 8
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program from 15042020 case 170420200019 The objectives of this inspection are to prevent as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 162005188107
Unscheduled inspection
Start date: 2020-10-21, end date: 2020-10-26, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 29/122018 case 121120180134 The objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 162005171473
Unscheduled inspection
Start date: 2020-10-09, end date: 2020-10-09, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 16092020 case 120420200081the objectives of this inspection are to prevent, identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, carried out during the construction of a capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts. acts


# 162005203187
Unscheduled inspection
Start date: 2020-10-29, end date: —, duration:
Authority:
Purpose of inspection:


# 162005160497
Unscheduled inspection
Start date: 2020-10-07, end date: 2020-10-12, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 17022020 case 1235201200522 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 162004474469
Unscheduled inspection
Start date: 2020-08-05, end date: 2020-08-10, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules for determining the fact of execution of the order, as well as for the purpose of drawing up an act on the elimination of violations of the order based on the notice received by the Inspectorate from 28072020 7832 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by regulation dated 29062020 1212054001 to 29072020 and the expiration of the order dated 29062020 1212054001, the deadline for which expired 29072020 The objectives of this audit are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, violations of compliance of the works performed during the construction of the capital construction facility with the requirements of technical regulations other regulatory legal acts and The subject of this audit is the fulfillment of the requirements of the state control bodies, supervision of municipal control bodies.


# 162004512971
Unscheduled inspection
Start date: 2020-08-28, end date: 2020-09-01, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 29/122018 case 121120180134 The objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 162004498063
Unscheduled inspection
Start date: 2020-08-25, end date: —, duration:
Authority:
Purpose of inspection:


# 162004491849
Unscheduled inspection
Start date: 2020-08-21, end date: —, duration:
Authority:
Purpose of inspection:


# 162004489426
Unscheduled inspection
Start date: 2020-08-19, end date: 2020-08-21, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program from 12082020 case 170420190043 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 162004478323
Unscheduled inspection
Start date: 2020-08-10, end date: —, duration:
Authority:
Purpose of inspection:


# 162004464228
Unscheduled inspection
Start date: 2020-07-27, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162004457647
Unscheduled inspection
Start date: 2020-07-21, end date: 2020-07-22, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of fulfillment of the order dated 29112019 1212130201, the deadline for which expired on 24062020, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations and other regulations. regulatory legal acts and project documentation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 162004456156
Unscheduled inspection
Start date: 2020-07-21, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162004456136
Unscheduled inspection
Start date: 2020-07-21, end date: 2020-07-31, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 17102019 case 171120160022 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 162004441496
Unscheduled inspection
Start date: 2020-06-29, end date: —, duration:
Authority:
Purpose of inspection:


# 162004427088
Unscheduled inspection
Start date: 2020-06-09, end date: 2020-06-10, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 21112018 case 121120180119 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation performed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 162004421313
Unscheduled inspection
Start date: 2020-06-02, end date: 2020-06-11, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 25052020 5084 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 18052020 1712012501 to 30062020 The objectives of this audit are to prevent as well as identify and suppress violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation committed by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. The subject of this audit is to comply with the instructions of state control bodies, supervision bodies, and municipal control bodies


# 162004421299
Unscheduled inspection
Start date: 2020-06-02, end date: —, duration:
Authority:
Purpose of inspection:


# 162004423658
Unscheduled inspection
Start date: 2020-06-03, end date: —, duration:
Authority:
Purpose of inspection:


# 162004416333
Unscheduled inspection
Start date: 2020-06-03, end date: 2020-06-08, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 27/122018 case 121120180132 The objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of a capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 162004432785
Unscheduled inspection
Start date: 2020-06-22, end date: —, duration:
Authority:
Purpose of inspection:


# 162004436976
Unscheduled inspection
Start date: 2020-06-23, end date: 2020-06-26, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules for determining the fact of execution of the order, as well as for the purpose of drawing up an act on the elimination of violations of the order based on the notice received by the Inspectorate from 27052020 5267 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by regulation from 15052020 1212040101 to 15062020 and the expiration of the period for the execution of the regulation from 15052020 1212040101, the deadline for which has expired 15062020 The objectives of this audit are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations other regulatory legal acts and The subject of this audit is the fulfillment of the requirements of the state control bodies, supervision of municipal control bodies.


# 162004415847
Unscheduled inspection
Start date: 2020-06-01, end date: —, duration:
Authority:
Purpose of inspection:


# 162004415861
Unscheduled inspection
Start date: 2020-06-01, end date: 2020-06-05, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program of 10102019 case 121120190121 The objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 162004415811
Unscheduled inspection
Start date: 2020-06-01, end date: 2020-06-11, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program from 10022020 case 170420200005 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 162004409428
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-05-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 15102019 case 121120190125 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 162004407632
Unscheduled inspection
Start date: 2020-05-18, end date: —, duration:
Authority:
Purpose of inspection:


# 162004407621
Unscheduled inspection
Start date: 2020-05-18, end date: 2020-05-29, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program from 15042020 case 170420200019 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 162004407593
Unscheduled inspection
Start date: 2020-05-18, end date: 2020-05-29, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program from 15042020 case 170420200017 The objectives of this inspection are to prevent as well as identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 162004407578
Unscheduled inspection
Start date: 2020-05-18, end date: 2020-05-29, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program from 10022020 case 170420200005 The objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 162004406703
Unscheduled inspection
Start date: 2020-05-18, end date: 2020-05-22, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program from 13032020 case 170420200010 The objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of a capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 162004406691
Unscheduled inspection
Start date: 2020-05-18, end date: 2020-05-22, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program from 10022020 case 170420200006 The objectives of this inspection are to prevent as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 162004407132
Unscheduled inspection
Start date: 2020-05-12, end date: 2020-05-18, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of fulfillment of the prescription from 20022020 1712003401, the deadline for which has expired 31032020, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations and other regulations. regulatory legal acts and project documentation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 162004407126
Unscheduled inspection
Start date: 2020-05-12, end date: 2020-05-18, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of fulfillment of the prescription from 20022020 1712003502, the deadline for which has expired 30032020, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations and other regulations. regulatory legal acts and project documentation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 162004406697
Unscheduled inspection
Start date: 2020-05-12, end date: —, duration:
Authority:
Purpose of inspection:


# 162004404329
Unscheduled inspection
Start date: 2020-05-12, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162004406767
Unscheduled inspection
Start date: 2020-05-13, end date: 2020-05-14, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of fulfillment of the order dated 26022020 1212018101, the deadline for which expired on 24042020, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations and other regulations performed during the construction of a capital construction facility. regulatory legal acts and project documentation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 162004399550
Unscheduled inspection
Start date: 2020-04-22, end date: —, duration:
Authority:
Purpose of inspection:


# 162004399547
Unscheduled inspection
Start date: 2020-04-22, end date: 2020-04-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program from 13032020 case 170420200010 The objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of a capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 162004397266
Unscheduled inspection
Start date: 2020-04-17, end date: 2020-04-17, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules for determining the fact of execution of the order, as well as for the purpose of drawing up an act on the elimination of violations of the order based on the notice received by the Inspection from 09042020 3559 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which were ordered to be eliminated within the time limit set by regulation from 11032020 1212020201 to 10042020 and the expiration of the period of execution of the regulation from 11032020 1212020201, the deadline for which has expired 10042020 The objectives of this audit are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and The subject of this audit is the fulfillment of the requirements of the state control bodies, supervision of municipal control bodies.


# 162004395100
Unscheduled inspection
Start date: 2020-04-14, end date: 2020-04-15, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 09.012020 case 170420190043 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 162004398446
Unscheduled inspection
Start date: 2020-04-20, end date: 2020-04-20, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of fulfillment of the instruction from 26032020 1212027402, the deadline for which has expired 06042020 26032020 1212027401, the deadline for which has expired 06042020 and drawing up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations of conformity committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer performed during the construction of the facility The subject of this audit is the fulfillment of the requirements of the state control bodies, supervision of municipal control bodies, and the requirements of the technical regulations of other regulatory legal acts and project documentation.


# 162004397981
Unscheduled inspection
Start date: 2020-04-20, end date: —, duration:
Authority:
Purpose of inspection:


# 162004398693
Unscheduled inspection
Start date: 2020-04-21, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162004398706
Unscheduled inspection
Start date: 2020-04-21, end date: 2020-04-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to establish compliance with the requirements of Part 5 of Article 52 of the Urban Planning Code of the Russian Federation, as well as to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and the implementation of according to the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, based on the notice received by the Inspectorate on the start of construction of a capital construction facility dated 13042020 3653, the objectives of this audit are to prevent, identify and suppress violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of the work performed during the construction of the capital construction facility requirements of technical regulations, other regulatory legal acts and project documentation The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts


# 162004398698
Unscheduled inspection
Start date: 2020-04-21, end date: —, duration:
Authority:
Purpose of inspection:


# 162004382779
Unscheduled inspection
Start date: 2020-03-27, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162004369639
Unscheduled inspection
Start date: 2020-03-24, end date: 2020-03-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to establish compliance with the requirements of Part 5 of Article 52 of the Urban Planning Code of the Russian Federation, as well as to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and the implementation of according to the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, based on the notice received by the Inspectorate on the start of construction of a capital construction facility dated 13032020 2538, the objectives of this inspection are to prevent, identify and suppress violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of the work performed during the construction of the capital construction facility requirements of technical regulations, other regulatory legal acts and project documentation The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts


# 162004368148
Unscheduled inspection
Start date: 2020-03-24, end date: 2020-03-26, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 21112018 case 121120180119 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 162004367583
Unscheduled inspection
Start date: 2020-03-26, end date: 2020-03-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 29/122018 case 121120180134 The objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 162004312465
Unscheduled inspection
Start date: 2020-03-04, end date: 2020-03-11, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 27/122018 case 121120180133 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 162004383286
Unscheduled inspection
Start date: 2020-03-30, end date: 2020-04-06, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to establish compliance with the requirements of Part 5 of Article 52 of the Urban Planning Code of the Russian Federation, as well as to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and the implementation of according to the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, based on the notice received by the Inspectorate on the start of construction of the capital construction facility from 20032020 2851, the objectives of this inspection are to prevent, identify and suppress violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of the work performed during the construction of the capital construction facility requirements of technical regulations, other regulatory legal acts and project documentation The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts


# 162004326875
Unscheduled inspection
Start date: 2020-03-10, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162004313116
Unscheduled inspection
Start date: 2020-02-28, end date: 2020-03-06, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of fulfillment of the instruction dated 14012020 1712000501, the deadline for which has expired 10022020, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations and other regulations performed during the construction of a capital construction facility. regulatory legal acts and project documentation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 162004302486
Unscheduled inspection
Start date: 2020-02-25, end date: 2020-02-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of fulfillment of the order dated 17012020 1212002002, the deadline for which has expired 14022020 17012020 1212002001, the deadline for which has expired 14022020, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations of conformity committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer performed during the construction of the facility The subject of this audit is the fulfillment of the requirements of the state control bodies supervision of municipal control bodies and the requirements of the technical regulations of other regulatory legal acts and project documentation.


# 162004276135
Unscheduled inspection
Start date: 2020-02-12, end date: 2020-02-18, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine whether the completed works used in the construction of an object of capital construction of building materials, the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 27/122018 case 121120180132 The objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of a capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 162004256897
Unscheduled inspection
Start date: 2020-02-12, end date: 2020-02-19, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 17102019 case 121120170065 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 162004256876
Unscheduled inspection
Start date: 2020-02-12, end date: 2020-02-19, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of fulfillment of the order dated 18122019 1212141301, the deadline for which expired 20012020, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations and other regulations performed during the construction of a capital construction facility. regulatory legal acts and project documentation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 002004292357
Unscheduled inspection
Start date: 2020-02-17, end date: 2020-03-17, duration:
Authority: Privolzhskoe upravlenie gosudarstvennogo zheleznodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: Compliance with the instructions of the state control bodies supervision of municipal control bodies


# 162004285402
Unscheduled inspection
Start date: 2020-02-17, end date: 2020-02-21, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to establish compliance with the requirements of Part 5 of Article 52 of the Urban Planning Code of the Russian Federation, as well as to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and the implementation of according to the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, based on the notice received by the Inspectorate on the start of construction of a capital construction facility dated 29.01.2020 897, the objectives of this audit are to prevent, identify and suppress violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of the work performed during the construction of the capital construction facility requirements of technical regulations, other regulatory legal acts and project documentation The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts


# 162004285461
Unscheduled inspection
Start date: 2020-02-17, end date: 2020-02-21, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to establish compliance with the requirements of Part 5 of Article 52 of the Urban Planning Code of the Russian Federation, as well as to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and the implementation of according to the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, based on the notice received by the Inspectorate on the start of construction of a capital construction facility from 30012020 954, the objectives of this audit are to prevent, identify and suppress violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of the work performed during the construction of the capital construction facility requirements of technical regulations, other regulatory legal acts and project documentation The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts


# 162004301186
Unscheduled inspection
Start date: 2020-02-21, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162004286863
Unscheduled inspection
Start date: 2020-02-21, end date: 2020-02-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 21112018 case 121120180119 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 162004286849
Unscheduled inspection
Start date: 2020-02-21, end date: —, duration:
Authority:
Purpose of inspection:


# 162004226129
Unscheduled inspection
Start date: 2020-01-27, end date: 2020-01-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of fulfillment of the order dated 23102019 1212116102, the deadline for which expired on 27122019, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations and other regulations. regulatory legal acts and project documentation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 162004173708
Unscheduled inspection
Start date: 2020-01-13, end date: —, duration:
Authority:
Purpose of inspection:


# 162004166405
Unscheduled inspection
Start date: 2020-01-13, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162004166282
Unscheduled inspection
Start date: 2020-01-13, end date: 2020-01-17, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of fulfillment of the order dated 31/102019 1712026101, the deadline for which expired on 25/122019, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations and other regulations. regulatory legal acts and project documentation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 162004195305
Unscheduled inspection
Start date: 2020-01-16, end date: —, duration:
Authority:
Purpose of inspection:


# 161904090412
Unscheduled inspection
Start date: 2019-12-12, end date: 2019-12-13, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the Inspection notification dated 05/122019 12551 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 28112019 1212130501 to 20012020G Tasks The purpose of this audit is to prevent as well as identify and suppress violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentationthe purpose of this audit is to select the necessary compliance with the instructions of state control bodies, supervision bodies, municipal control bodies.


# 161904123094
Unscheduled inspection
Start date: 2019-12-19, end date: —, duration:
Authority:
Purpose of inspection:


# 161904122775
Unscheduled inspection
Start date: 2019-12-19, end date: 2019-12-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as to draw up an inspection report on the completed construction of the facility in accordance with the received by notification dated 12122019 12927 to the Inspection on the completion of the construction of the capital construction facility, the objectives of this inspection are to prevent, identify and prevent violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. mandatory requirements and or requirements established by municipal legal acts


# 161904105457
Unscheduled inspection
Start date: 2019-12-19, end date: 2019-12-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 27/122018 case 121120180133 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 161904064990
Unscheduled inspection
Start date: 2019-12-16, end date: —, duration:
Authority:
Purpose of inspection:


# 161903958871
Unscheduled inspection
Start date: 2019-11-20, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161904002169
Unscheduled inspection
Start date: 2019-11-27, end date: 2019-11-29, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the program of inspections dated 21102019 case 171120160025the tasks of this audit are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation7 The subject of this audit is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 161903979557
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-02, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program from 08082018 case 121120180077the objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations, other regulatory legal acts and project documentation. The purpose of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 161903985808
Unscheduled inspection
Start date: 2019-11-28, end date: 2019-11-29, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 15102019 case 121120190125the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The purpose of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 161903923493
Unscheduled inspection
Start date: 2019-11-07, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161904040361
Unscheduled inspection
Start date: 2019-11-30, end date: 2019-12-03, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 25112019 11901 25112019 11900 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 15112019 1212125701 18102019 1212112601 to 16122019


# 161903936514
Unscheduled inspection
Start date: 2019-11-11, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161903936654
Unscheduled inspection
Start date: 2019-11-11, end date: —, duration:
Authority:
Purpose of inspection:


# 161903950435
Unscheduled inspection
Start date: 2019-11-14, end date: 2019-11-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the Inspection notification dated 31102019 10841 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 27092019 1212104501 to 15112019G Tasks The purpose of this audit is to prevent as well as identify and suppress violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentationthe purpose of this audit is to select the necessary compliance with the instructions of state control bodies, supervision bodies, municipal control bodies.


# 161903881857
Unscheduled inspection
Start date: 2019-10-24, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161903877505
Unscheduled inspection
Start date: 2019-10-24, end date: —, duration:
Authority:
Purpose of inspection:


# 161903870211
Unscheduled inspection
Start date: 2019-10-21, end date: —, duration:
Authority:
Purpose of inspection:


# 161903869816
Unscheduled inspection
Start date: 2019-10-21, end date: —, duration:
Authority:
Purpose of inspection:


# 161903882466
Unscheduled inspection
Start date: 2019-10-28, end date: 2019-11-08, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 27/12/2018 case 121120180132


# 161903853936
Unscheduled inspection
Start date: 2019-10-15, end date: —, duration:
Authority:
Purpose of inspection:


# 161903510065
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-09-20, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 14092018 case 121120170065the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The purpose of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 161903596889
Unscheduled inspection
Start date: 2019-09-25, end date: —, duration:
Authority:
Purpose of inspection:


# 161903634652
Unscheduled inspection
Start date: 2019-09-26, end date: 2019-09-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 08102018 case 121120180105the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts. acts


# 161903526352
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-09-25, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of fulfillment of the order dated 30072019 1212075802, the deadline for which expired 04092019, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations and other regulatory documents. legal acts and project documentationthe subject of this audit is to comply with the instructions of state control bodies, supervision bodies, and municipal control bodies.


# 161902948282
Unscheduled inspection
Start date: 2019-08-15, end date: —, duration:
Authority:
Purpose of inspection:


# 161902993520
Unscheduled inspection
Start date: 2019-08-23, end date: 2019-08-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 21112018 case 121120180119the objectives of this inspection are to prevent, identify and prevent violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of the works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentationthe subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts. acts


# 161902993614
Unscheduled inspection
Start date: 2019-08-23, end date: —, duration:
Authority:
Purpose of inspection:


# 161902991457
Unscheduled inspection
Start date: 2019-08-23, end date: —, duration:
Authority:
Purpose of inspection:


# 161902988693
Unscheduled inspection
Start date: 2019-08-23, end date: 2019-09-10, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as to draw up an inspection report on the completed construction of the facility in accordance with the received by notification dated 15082019 7368 to the Inspection on the completion of the construction of the capital construction facility, the objectives of this inspection are to prevent, identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer. requirements and or requirements established by municipal legal acts


# 161902955043
Unscheduled inspection
Start date: 2019-08-20, end date: 2019-08-21, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of fulfillment of the order dated 17072019 1212072301, the deadline for which expired on 05082019, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations and other regulatory documents performed during the construction of a capital construction facility. legal acts and project documentationthe subject of this audit is to comply with the instructions of state control bodies, supervision bodies, and municipal control bodies.


# 161902939343
Unscheduled inspection
Start date: 2019-08-26, end date: 2019-08-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 27/12/2018 case 121120180133


# 161902902006
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-09, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of fulfillment of the order dated 16042019 1212035201, the deadline for which expired on 17072019, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations and other regulatory documents. legal acts and project documentationthe subject of this audit is to comply with the instructions of state control bodies, supervision bodies, and municipal control bodies.


# 161902866577
Unscheduled inspection
Start date: 2019-07-17, end date: —, duration:
Authority:
Purpose of inspection:


# 161902808727
Unscheduled inspection
Start date: 2019-07-01, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161902847378
Unscheduled inspection
Start date: 2019-07-05, end date: —, duration:
Authority:
Purpose of inspection:


# 161902902048
Unscheduled inspection
Start date: 2019-07-26, end date: 2019-07-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 08102018 case 121120180105the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts. acts


# 161902796353
Unscheduled inspection
Start date: 2019-07-08, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161902786221
Unscheduled inspection
Start date: 2019-06-17, end date: 2019-06-18, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program from 08082018 case 121120180077the objectives of this inspection are to prevent, identify and prevent violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer with the requirements of technical regulations and other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal authorities. legal acts


# 161902803378
Unscheduled inspection
Start date: 2019-06-21, end date: —, duration:
Authority:
Purpose of inspection:


# 161902803506
Unscheduled inspection
Start date: 2019-06-21, end date: —, duration:
Authority:
Purpose of inspection:


# 161902795832
Unscheduled inspection
Start date: 2019-06-24, end date: 2019-06-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 27/12/2018 case 121120180132


# 161902786343
Unscheduled inspection
Start date: 2019-06-28, end date: 2019-07-05, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 04052018 case 121120180040the objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation performed by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal authorities. legal acts


# 161902745579
Unscheduled inspection
Start date: 2019-06-05, end date: 2019-06-07, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 21112018 case 121120180119the objectives of this inspection are to prevent, identify and prevent violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of the works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentationthe subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts. acts


# 161902745510
Unscheduled inspection
Start date: 2019-06-05, end date: 2019-06-07, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 29/122018 case 121120180134the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts. acts


# 161902745427
Unscheduled inspection
Start date: 2019-05-31, end date: 2019-05-31, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: To establish that this inspection is carried out in order to determine the fact of compliance with the order dated 19042019 1212038401, the deadline for which expired 20052019, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations performed during the construction of a capital construction facility other regulatory legal acts and project documentationthe subject of this audit is to comply with the instructions of state control bodies, supervision bodies, and municipal control bodies.


# 161902740928
Unscheduled inspection
Start date: 2019-05-31, end date: —, duration:
Authority:
Purpose of inspection:


# 161902704084
Unscheduled inspection
Start date: 2019-05-15, end date: —, duration:
Authority:
Purpose of inspection:


# 161902709021
Unscheduled inspection
Start date: 2019-05-29, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161902691353
Unscheduled inspection
Start date: 2019-05-06, end date: —, duration:
Authority:
Purpose of inspection:


# 161902686995
Unscheduled inspection
Start date: 2019-05-06, end date: —, duration:
Authority:
Purpose of inspection:


# 161902683406
Unscheduled inspection
Start date: 2019-05-06, end date: 2019-05-14, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the verification program dated 05072018 case 121120180060


# 161902643412
Unscheduled inspection
Start date: 2019-04-11, end date: 2019-04-16, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 05042019 2850 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 15032019 1212024801 to 30042019 The objectives of this audit are to prevent as well as identify and suppress violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation committed by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. The subject of this audit is to select the necessary compliance with the requirements of state control bodies, supervision bodies, municipal control bodies


# 161902635523
Unscheduled inspection
Start date: 2019-04-12, end date: 2019-04-15, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules for determining the fact of execution of the order, as well as for the purpose of drawing up an act on the elimination of violations of the order based on the notice received by the Inspectorate from 20032019 2334 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which were ordered to be eliminated within the time limit set by regulation from 21022019 1212015702 to 21032019 and the expiration of the period of execution of the regulation from 21022019 1212015702, the period of execution of which expired 21032019


# 161902651174
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-04-19, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 21112018 case 121120180119 The objectives of this inspection are to prevent as well as identify and suppress violations of compliance with technical regulations, other regulatory legal acts and project documentation performed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 161902647670
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-04-19, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 29/122018 case 121120180134 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 161902637528
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-04-19, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 27/12/2018 case 121120180132


# 161902635592
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-04-16, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 08102018 case 121120180105 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 161902651268
Unscheduled inspection
Start date: 2019-04-16, end date: 2019-04-17, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 05042019 2874 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 18022019 1212014901 to 15042019 The objectives of this audit are to prevent as well as identify and suppress violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation committed by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. The subject of this audit is to comply with the instructions of state control bodies, supervision bodies, and municipal control bodies


# 161902647409
Unscheduled inspection
Start date: 2019-04-18, end date: —, duration:
Authority:
Purpose of inspection:


# 161902597033
Unscheduled inspection
Start date: 2019-04-01, end date: —, duration:
Authority:
Purpose of inspection:


# 161902562075
Unscheduled inspection
Start date: 2019-03-11, end date: —, duration:
Authority:
Purpose of inspection:


# 161902555292
Unscheduled inspection
Start date: 2019-03-11, end date: —, duration:
Authority:
Purpose of inspection:


# 161902572171
Unscheduled inspection
Start date: 2019-03-15, end date: —, duration:
Authority:
Purpose of inspection:


# 161902572126
Unscheduled inspection
Start date: 2019-03-15, end date: 2019-03-15, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of fulfillment of the instruction from 07022019 1212009601, the deadline for which has expired 07032019, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations and other regulations. regulatory legal acts and project documentation The subject of this audit is to select the necessary fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 161902585345
Unscheduled inspection
Start date: 2019-03-20, end date: —, duration:
Authority:
Purpose of inspection:


# 161902530174
Unscheduled inspection
Start date: 2019-03-01, end date: —, duration:
Authority:
Purpose of inspection:


# 161902555728
Unscheduled inspection
Start date: 2019-03-06, end date: 2019-03-07, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 25022019 1671 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 22102018 1219101901 to 25022019 The objectives of this audit are to prevent as well as identify and suppress violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation committed by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. The subject of this audit is to select the necessary compliance with the instructions of state control bodies, supervision bodies, and municipal control bodies


# 161902452713
Unscheduled inspection
Start date: 2019-02-11, end date: 2019-02-13, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 08082018 case 121120180077 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 161902503021
Unscheduled inspection
Start date: 2019-02-12, end date: 2019-02-15, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 29/122017 case 121120170150 The objectives of this inspection are to prevent as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 161902511861
Unscheduled inspection
Start date: 2019-02-15, end date: —, duration:
Authority:
Purpose of inspection:


# 161902511666
Unscheduled inspection
Start date: 2019-02-15, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161902529830
Unscheduled inspection
Start date: 2019-02-21, end date: 2019-02-21, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 08102018 case 121120180105 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 161902449531
Unscheduled inspection
Start date: 2019-02-06, end date: —, duration:
Authority:
Purpose of inspection:


# 161902441761
Unscheduled inspection
Start date: 2019-02-04, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161902441807
Unscheduled inspection
Start date: 2019-02-04, end date: —, duration:
Authority:
Purpose of inspection:


# 161902419865
Unscheduled inspection
Start date: 2019-01-10, end date: 2019-01-11, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to establish compliance with the requirements of Part 5 of Article 52 of the Urban Planning Code of the Russian Federation, as well as to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and the implementation of requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of the notice received by the Inspectorate on the start of construction of a capital construction facility dated 24/122018 10316


# 161802188488
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-05, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 19/12/2018 case 80701 Objectives of this inspection are to prevent as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 161802164036
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-07, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The verification program dated 23052018 case 121120180052


# 161802215123
Unscheduled inspection
Start date: 2018-12-11, end date: 2018-12-12, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 301/12018 case 121120140060 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 161802175275
Unscheduled inspection
Start date: 2018-12-17, end date: 2018-12-21, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the verification program dated 05072018 case 121120180060


# 161801888277
Unscheduled inspection
Start date: 2018-10-10, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161801974981
Unscheduled inspection
Start date: 2018-10-17, end date: 2018-10-18, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the Inspection notification dated 10102018 7519 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 28092018 1219093001 to 29102018 The objectives of this audit are to prevent as well as identify and suppress violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation committed by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. The subject of this audit is to comply with the instructions of state control bodies, supervision bodies, and municipal control bodies


# 161801888308
Unscheduled inspection
Start date: 2018-10-17, end date: —, duration:
Authority:
Purpose of inspection:


# 161801981171
Unscheduled inspection
Start date: 2018-10-19, end date: 2018-10-22, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with energy metering devices, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program dated 15102018 case 30001, the objectives of this inspection are to prevent, identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer of the work performed during the construction of the capital construction facility. The subject of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 161801434276
Unscheduled inspection
Start date: 2018-09-17, end date: 2018-09-20, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with with the verification program from 23052018 case 121120180052


# 161801665624
Unscheduled inspection
Start date: 2018-09-24, end date: —, duration:
Authority:
Purpose of inspection:


# 161800624966
Unscheduled inspection
Start date: 2018-09-03, end date: 2018-09-04, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program from 08082018 case 121120180077, the objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts


# 161800517681
Unscheduled inspection
Start date: 2018-07-05, end date: —, duration:
Authority:
Purpose of inspection:


# 161800554525
Unscheduled inspection
Start date: 2018-07-23, end date: —, duration:
Authority:
Purpose of inspection:


# 161800414980
Unscheduled inspection
Start date: 2018-06-04, end date: 2018-06-08, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to establish compliance with the requirements of Part 5 of Article 52 of the Urban Planning Code of the Russian Federation, as well as to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used. construction of compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of the notice received by the Inspectorate on the start of construction of the capital construction facility dated 22052018 3499, the objectives of this inspection are to prevent, identify and suppress violations of conformity committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer performed during the construction of the capital construction facility The purpose of this audit is to select the required compliance with the mandatory requirements and or requirements established by municipal legal acts.


# 001800414846
Unscheduled inspection
Start date: 2018-06-04, end date: 2018-06-08, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to establish compliance with the requirements of Part 5 of Article 52 of the Urban Planning Code of the Russian Federation, as well as to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used. construction of compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of the notice received by the Inspectorate on the start of construction of the capital construction facility dated 22052018 3499, the objectives of this inspection are to prevent, identify and suppress violations of conformity committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer performed during the construction of the capital construction facility The subject of this audit is to select the required compliance with the mandatory requirements and or requirements established by municipal legal acts.


# 161800293616
Unscheduled inspection
Start date: 2018-04-19, end date: 2018-04-20, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program dated 13122016 case 121120160112, the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts


# 161800177959
Unscheduled inspection
Start date: 2018-03-12, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 16170802992138
Unscheduled inspection
Start date: 2017-12-16, end date: 2017-12-20, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as for the purpose of drawing up an act of inspection of the completed facility in accordance with with the notice received by the Inspection dated 12122017 10396 on the completion of the construction of the capital construction facility, the objectives of this inspection are to prevent, identify and prevent violations of compliance of the works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation7 committed by the developer, the customer, the person carrying out the construction on the basis of a contract with the developer or the customer. select the required compliance with mandatory requirements and or requirements established by municipal legal acts


# 16170802896358
Unscheduled inspection
Start date: 2017-11-27, end date: 2017-11-29, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of fulfillment of the order dated 19092017 1219105801, the deadline for which expired in 2014-2017, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations and other regulatory documents performed during the construction of a capital construction facility. legal acts and project documentation7 The subject of this audit is to select the necessary fulfillment of the instructions of the state control bodies, supervision bodies of municipal control


# 16170802896549
Unscheduled inspection
Start date: 2017-11-27, end date: 2017-12-05, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program dated 20112017 case 121120140171, the objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation7 carried out by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations, other regulatory legal acts and project documentation7 The subject of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 16170802846803
Unscheduled inspection
Start date: 2017-11-17, end date: 2017-11-24, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program dated 09/12017 case 123520120103the objectives of this inspection are to prevent as well as identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation7 carried out by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of the works performed during the construction of the capital construction facility. The subject of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 16170802818776
Unscheduled inspection
Start date: 2017-11-13, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 16170802371735
Unscheduled inspection
Start date: 2017-09-18, end date: 2017-09-20, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction and reconstruction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with energy metering devices, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation. in accordance with the inspection program from 18072017 case 123520120103the objectives of this inspection are to prevent, as well as identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation7 carried out by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations, other regulatory legal acts and project documentation7the subject of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 16170701382735
Unscheduled inspection
Start date: 2017-02-17, end date: 2017-02-17, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the Inspection notification dated 27.012017 597 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 16/122016 1219139801 to 27.012017G Tasks The purpose of this audit is to prevent, as well as to identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, performed during the construction of a capital construction facility. The purpose of this audit is to comply with the requirements of the Inspection


# 16170701330240
Unscheduled inspection
Start date: 2017-01-30, end date: 2017-01-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the Inspection notification dated 10012017 94 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 06122016 1219132601 to 06022017G Tasks The purpose of this audit is to prevent, as well as to identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, performed during the construction of a capital construction facility. The purpose of this audit is to comply with the requirements of the Inspection


# 16160701210446
Unscheduled inspection
Start date: 2016-12-19, end date: 2016-12-20, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: The subject of this audit is compliance with mandatory requirements. The objectives of this audit are to prevent, as well as to identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. This audit is conducted in order to establish compliance with the requirements of Part 5 of Article 52 The Urban Planning Code of the Russian Federation on the basis of the notice received by the Inspectorate on the start of construction of a capital construction facility dated 24112016 10467


# 16160701225016
Unscheduled inspection
Start date: 2016-12-15, end date: 2016-12-16, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 16112016 10167 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 28102016 1219111801 to 22112016G Tasks The purpose of this audit is to prevent, as well as to identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, performed during the construction of a capital construction facility. The subject of this audit is to comply with the requirements of the Inspection


# 16160701218520
Unscheduled inspection
Start date: 2016-12-12, end date: 2016-12-12, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determining the fact of execution of the order dated 01112016 1219112101, the deadline for which expired on 28112016, and drawing up an act based on the results of the inspection, preventing as well as detecting and suppressing violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation, performed during the construction of the capital construction facility.


# 16160701155714
Unscheduled inspection
Start date: 2016-12-05, end date: 2016-12-06, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction and reconstruction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with energy metering devices, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation. in accordance with the inspection program dated 17112014 case 121120140171the objectives of this inspection are to prevent, as well as identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, performed during the construction of a capital construction facility. The purpose of this inspection is to select the necessary compliance with mandatory requirements


# 16160701105686
Unscheduled inspection
Start date: 2016-11-15, end date: 2016-11-15, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction and reconstruction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with energy metering devices, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation. in accordance with the inspection program dated 13112014 case 121120140172the tasks of this inspection are to prevent as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility


# 16160701045836
Unscheduled inspection
Start date: 2016-10-18, end date: —, duration:
Authority:
Purpose of inspection:


# 16160701055607
Unscheduled inspection
Start date: 2016-10-31, end date: —, duration:
Authority:
Purpose of inspection:


# 16160700997189
Unscheduled inspection
Start date: 2016-10-12, end date: 2016-10-12, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of fulfillment of the order dated 20092016 1219090001, the deadline for which expired on 04102016, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations and other regulatory documents performed during the construction of a capital construction facility. legal acts and project documentation The subject of this audit is the fulfillment of Inspection regulations


# 16160701039269
Unscheduled inspection
Start date: 2016-10-26, end date: 2016-10-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used during the construction and reconstruction of the capital construction facility comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation. in accordance with the inspection program dated 13112014 case 121120140172, the objectives of this inspection are to prevent, identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. The subject of this inspection is compliance with mandatory requirements


# 16160700914791
Unscheduled inspection
Start date: 2016-09-29, end date: —, duration:
Authority:
Purpose of inspection:


# 16160700353036
Unscheduled inspection
Start date: 2016-09-19, end date: 2016-09-20, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed with the construction materials used in the construction and reconstruction of the capital construction facility and the results of such work with the requirements of technical regulations and project documentation, including energy efficiency requirements and equipment requirements for capital construction facilities with metering devices for energy resources used based on the Inspection notification dated 05092016 7712 on the completion dates that are subject to verification at the capital construction facility, the objectives of this audit are to prevent, identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts


# 00160700522453
Unscheduled inspection
Start date: 2016-08-10, end date: 2016-08-11, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 28072016 6231 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 25072016 1219961001 to 22082016G Tasks The purpose of this audit is to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, while eliminating previously identified violations. The purpose of this audit is to comply with the instructions of state control bodies, municipal control bodies


# 00160601729571
Unscheduled inspection
Start date: 2016-07-20, end date: 2016-07-25, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed with the construction materials used in the construction and reconstruction of the capital construction facility and the results of such work with the requirements of technical regulations and project documentation, including energy efficiency requirements and equipment requirements for capital construction facilities with metering devices for energy resources used based on the notice received by the Inspectorate dated 22092015 9099 on the completion dates that are subject to verification At the capital construction facility, the objectives of this audit are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts


# 16160601729562
Unscheduled inspection
Start date: 2016-07-22, end date: —, duration:
Authority:
Purpose of inspection:


# 00160601752156
Unscheduled inspection
Start date: 2016-07-29, end date: 2016-08-02, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the Inspection notification dated 15072016 5788 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 08072016 1219056202 to 05082016G Tasks This audit is aimed at preventing as well as detecting and suppressing violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of a capital construction facility, while eliminating previously identified violations. The subject of this audit is compliance with the instructions of state control bodies, supervision bodies, municipal control bodies


# 00160601604709
Unscheduled inspection
Start date: 2016-04-27, end date: 2016-05-27, duration:
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: protection of workers' rights


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.