Found 7 inspections:

# 74170701737624
Unscheduled inspection
Start date: 2017-06-27, end date: 2017-06-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of finishing works after the actual completion of work, landscaping of the adjacent territory before the laying of asphalt concrete, the device of the power supply system for low-current switchboard systems after the actual completion of work, compliance with fire and sanitary epidemiological measures after the actual completion of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2 Availability of a construction permit 3 Meeting the requirements of hr 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701380585
Unscheduled inspection
Start date: 2017-02-15, end date: 2017-02-21, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of monolithic foundations and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701327784
Unscheduled inspection
Start date: 2017-01-30, end date: 2017-02-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of the BNS in axes 1430AE, the installation of the base plate of the PFM1, the installation of grillings in axes 219AJ, the installation of the support wall in axes 1619E, the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701226070
Unscheduled inspection
Start date: 2016-12-15, end date: —, duration:
Authority:
Purpose of inspection:


# 74160701243085
Unscheduled inspection
Start date: 2016-12-20, end date: 2016-12-26, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the grillwork and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701248888
Unscheduled inspection
Start date: 2016-12-21, end date: —, duration:
Authority:
Purpose of inspection:


# 74160701120006
Unscheduled inspection
Start date: 2016-11-22, end date: 2016-11-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the excavation work, the monolithic foundation slab, and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.