Found 286 inspections:

# 001904017150
Unscheduled inspection
Start date: 2019-11-26, end date: 2019-12-20, duration:
Authority: Uralskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: this inspection is carried out in order to comply with the previously issued instruction dated 23102019 01190169the tasks of this inspection are to identify and suppress violations of regulatory legal normative technical acts standards and norms regulating the activities of the motor transport complexThe subject of this inspection is to comply with the instructions of state control bodies supervision of measures to prevent harm to life health of citizens harm to animals plants the environment


# 742101418412
Unscheduled inspection
Start date: 2021-12-13, end date: 2021-12-17, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on filling window openings, installation of internal and external networks and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and requirements the equipment of the capital construction facility with metering devices for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742101226805
Unscheduled inspection
Start date: 2021-10-26, end date: 2021-11-01, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on filling window and door openings, installation of internal and external networks, finishing works and construction materials used in the construction process, reconstruction of a capital construction facility, as well as the results of such work with the requirements of project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes, included in the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects for which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742101226780
Unscheduled inspection
Start date: 2021-10-26, end date: 2021-11-01, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of reinforced concrete on the 11th floor, the installation of the roof and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and equipment requirements of the facility capital construction with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742101218289
Unscheduled inspection
Start date: 2021-10-25, end date: —, duration:
Authority:
Purpose of inspection:


# 742100515093
Unscheduled inspection
Start date: 2021-09-10, end date: —, duration:
Authority:
Purpose of inspection:


# 742100335390
Unscheduled inspection
Start date: 2021-07-08, end date: 2021-07-14, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of basement structures and building materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements of equipment of the capital construction facility with devices accounting for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100365472
Unscheduled inspection
Start date: 2021-07-22, end date: 2021-07-28, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of reinforced concrete of 3-10 floors and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the design documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements of equipment of the capital construction facility with devices accounting for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100307122
Unscheduled inspection
Start date: 2021-06-29, end date: 2021-07-05, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of building structures during the work and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the design documentation in accordance with parts 3.8 and 3.9 of Articles 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and equipment requirements of the capital construction facility construction of metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100258153
Unscheduled inspection
Start date: 2021-06-07, end date: 2021-06-11, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Verification of the execution of the order dated 04/23/2021, the deadline for execution is 05/24/2021. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100185914
Unscheduled inspection
Start date: 2021-05-11, end date: 2021-05-17, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Verification of the execution of the order dated 03/15/2021, the deadline for execution is 04/19/2021. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100143222
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-04-23, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of the pile field and grillage and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and equipment requirements of the capital construction facility metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100143212
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-04-23, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Verification of the execution of the order dated 03/02/2021, the deadline for execution is 04/05/2021. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100128389
Unscheduled inspection
Start date: 2021-04-12, end date: 2021-04-16, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Verification of the execution of the order dated 03/02/2021, the deadline for execution is 04/01/2021. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100098875
Unscheduled inspection
Start date: 2021-04-06, end date: 2021-04-12, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of reinforced concrete on the 11th floor and the installation of the roof and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and equipment requirements of the facility capital construction with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100098867
Unscheduled inspection
Start date: 2021-04-06, end date: 2021-04-12, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of reinforced concrete of the ground floor, 1-2 floors and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and equipment requirements of the facility capital construction with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100092879
Unscheduled inspection
Start date: 2021-03-30, end date: 2021-04-05, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of the grillage during the work and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and equipment requirements of the capital construction facility metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100092199
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-02, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of the box during the work and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and equipment requirements of the capital construction facility metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100075496
Unscheduled inspection
Start date: 2021-03-25, end date: 2021-03-31, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on the installation of building structures from the 1st to the 3rd floor, bricklaying of walls and partitions (after installation of the floor overlap before sealing the mounting joints), installation of building structures from the 4th to the 7th floor, bricklaying of walls and partitions (after installation of the overlap before sealing the mounting joints joints). and the construction materials used in the process of construction, reconstruction of the capital construction facility, as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100024069
Unscheduled inspection
Start date: 2021-02-26, end date: —, duration:
Authority:
Purpose of inspection:


# 742100021241
Unscheduled inspection
Start date: 2021-02-24, end date: —, duration:
Authority:
Purpose of inspection:


# 742105339155
Unscheduled inspection
Start date: 2021-02-24, end date: 2021-03-02, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of reinforced concrete of 3-6 floors and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the design documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements of equipment of the capital construction facility with devices accounting for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742105317971
Unscheduled inspection
Start date: 2021-01-27, end date: 2021-02-02, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of basement structures and building materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and equipment requirements of the capital construction facility metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742005183912
Unscheduled inspection
Start date: 2020-10-15, end date: 2020-10-21, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of window blocks with the completed stage the device of internal finishing works of internal engineering systems the device of ventilation and smoke removal during the execution and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004482633
Unscheduled inspection
Start date: 2020-08-17, end date: 2020-08-21, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of window structures during the production of works and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004456714
Unscheduled inspection
Start date: 2020-07-31, end date: —, duration:
Authority:
Purpose of inspection:


# 742004435585
Unscheduled inspection
Start date: 2020-06-22, end date: 2020-06-26, duration: 4
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of technical floor structures after completion of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004434540
Unscheduled inspection
Start date: 2020-06-23, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742004437507
Unscheduled inspection
Start date: 2020-06-18, end date: —, duration:
Authority:
Purpose of inspection:


# 742004427157
Unscheduled inspection
Start date: 2020-06-19, end date: —, duration:
Authority:
Purpose of inspection:


# 742004417543
Unscheduled inspection
Start date: 2020-05-29, end date: 2020-06-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of structures of 16 floors in the course of work and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31st st52 of the Urban Planning Code of the Russian Federation


# 742004410938
Unscheduled inspection
Start date: 2020-05-20, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742004374029
Unscheduled inspection
Start date: 2020-03-25, end date: 2020-03-31, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of pile works the final stage is reinforcement and concreting of grillings in the axes "12" during the execution and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources2 The presence of a permit on construction3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004300059
Unscheduled inspection
Start date: 2020-03-03, end date: —, duration:
Authority:
Purpose of inspection:


# 742004344287
Unscheduled inspection
Start date: 2020-03-16, end date: 2020-03-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of internal and external enclosing structures of the 810th floor during the production of works and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation in accordance with in parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources2 The availability of a permit for construction3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004315627
Unscheduled inspection
Start date: 2020-03-16, end date: 2020-03-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of internal engineering networks in the process of installation of translucent structures completed stage of work on installation of the roof completed stage of work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Code of design documentation with taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipment of the capital construction facility construction with metering devices for used energy resources2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004315622
Unscheduled inspection
Start date: 2020-03-16, end date: 2020-03-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of internal engineering networks in the process of installation of translucent structures completed stage of work on installation of the roof completed stage of work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Code of design documentation with taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipment of the capital construction facility construction with metering devices for used energy resources2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004344306
Unscheduled inspection
Start date: 2020-03-19, end date: 2020-03-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of internal and external enclosing structures of 36 floors in the course of work and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004291629
Unscheduled inspection
Start date: 2020-02-26, end date: 2020-03-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed when filling window and door openings laying external engineering networks finishing facade surfaces and building materials used in the construction process reconstruction of a capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipping the capital construction facility with metering devices for energy resources used2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004289832
Unscheduled inspection
Start date: 2020-02-21, end date: —, duration:
Authority:
Purpose of inspection:


# 742004222951
Unscheduled inspection
Start date: 2020-01-29, end date: —, duration:
Authority:
Purpose of inspection:


# 742004221862
Unscheduled inspection
Start date: 2020-01-29, end date: 2020-02-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of reinforced concrete structures of the basement third floor during the production of works and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources2 Availability of a construction permit 3 Compliance with the requirements hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004221854
Unscheduled inspection
Start date: 2020-01-27, end date: —, duration:
Authority:
Purpose of inspection:


# 742004222848
Unscheduled inspection
Start date: 2020-01-28, end date: 2020-02-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of structures at the roof level waterproofing and thermal insulation of the attic the installation of window blocks with full readiness and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources2 Availability building permits 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004221832
Unscheduled inspection
Start date: 2020-01-30, end date: —, duration:
Authority:
Purpose of inspection:


# 742004221841
Unscheduled inspection
Start date: 2020-01-30, end date: —, duration:
Authority:
Purpose of inspection:


# 741904096962
Unscheduled inspection
Start date: 2019-12-20, end date: 2019-12-26, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of technical floor structures insulation of the attic room installation of the roof and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation in accordance with parts 38 and 39 Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741904114831
Unscheduled inspection
Start date: 2019-12-23, end date: 2019-12-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the basement of 59 floors and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning the Code of the Russian Federation


# 741904114853
Unscheduled inspection
Start date: 2019-12-23, end date: 2019-12-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the basement of 56 floors and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning the Code of the Russian Federation


# 741904063026
Unscheduled inspection
Start date: 2019-12-10, end date: 2019-12-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of structures at the roof level waterproofing and thermal insulation of the attic the installation of window blocks with full readiness and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources2 Availability building permits 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741904109577
Unscheduled inspection
Start date: 2019-12-18, end date: 2019-12-24, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of a pile field after completion of the work with the device of a monolithic grillage after completion of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used 2 The availability of a permit for construction 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 001904017150
Unscheduled inspection
Start date: 2019-11-26, end date: 2019-12-20, duration:
Authority: Uralskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: this inspection is carried out in order to comply with the previously issued instruction dated 23102019 01190169the tasks of this inspection are to identify and suppress violations of regulatory legal normative technical acts standards and norms regulating the activities of the motor transport complexThe subject of this inspection is to comply with the instructions of state control bodies supervision of measures to prevent harm to life health of citizens harm to animals plants the environment


# 741903975860
Unscheduled inspection
Start date: 2019-11-25, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741903975848
Unscheduled inspection
Start date: 2019-11-25, end date: —, duration:
Authority:
Purpose of inspection:


# 741903995789
Unscheduled inspection
Start date: 2019-11-28, end date: 2019-12-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of structures of the eighth and tenth technical stage during the production of works and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation in accordance with parts 38 and 39 Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code RF4 Verification of the execution of the regulation dated 21102019


# 741903950397
Unscheduled inspection
Start date: 2019-11-14, end date: —, duration:
Authority:
Purpose of inspection:


# 001903652595
Unscheduled inspection
Start date: 2019-10-01, end date: 2019-10-25, duration:
Authority: Uralskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: this inspection is carried out in order to comply with the previously issued instruction from 26082019 01190141the tasks of this inspection are to identify and suppress violations of regulatory legal normative technical acts standards and norms regulating the activities of the motor transport complex7 The subject of this inspection is the fulfillment of the instructions of the state control bodies supervision of measures to prevent harm to the life health of citizens harm to animals plants the environment


# 741903731403
Unscheduled inspection
Start date: 2019-10-11, end date: 2019-10-17, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of external and internal wall panels and ceilings in the axes "14" from the fifth to the technical floor with the device of internal engineering systems during the execution and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Code project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and requirements equipment of the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741903843213
Unscheduled inspection
Start date: 2019-10-15, end date: 2019-10-21, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of structures of 5-7 floors in the course of work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation in accordance with parts 38 and 39 Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Performance requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741903499039
Unscheduled inspection
Start date: 2019-09-20, end date: —, duration:
Authority:
Purpose of inspection:


# 741903080790
Unscheduled inspection
Start date: 2019-09-06, end date: 2019-09-12, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the construction of structures at the 2nd floor level and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of design documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23i 31 st52 of the Urban Planning Code of the Russian Federation


# 741902987513
Unscheduled inspection
Start date: 2019-08-30, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741902878535
Unscheduled inspection
Start date: 2019-08-06, end date: 2019-08-12, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of external and internal wall panels and ceilings in the axes "14" from the 7th to the technical floor with the installation of internal engineering systems during the execution and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902878528
Unscheduled inspection
Start date: 2019-08-06, end date: 2019-08-12, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of external and internal wall panels and ceilings in the axes "110" from the 7th to the technical floor with the installation of internal engineering systems during the execution and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902878490
Unscheduled inspection
Start date: 2019-08-07, end date: 2019-08-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of external and internal wall panels of floor slabs in the axes "14" from the first to the fourth floor installation of windows and building materials used during the construction of a capital construction facility as well as the results of such work with the requirements of design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902878523
Unscheduled inspection
Start date: 2019-08-07, end date: 2019-08-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of external and internal wall panels and ceilings in the axes "16" from the 5th floor to the technical floor installation of internal engineering systems during the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31st st52 of the Urban Planning Code of the Russian Federation


# 741902878510
Unscheduled inspection
Start date: 2019-07-30, end date: 2019-08-05, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of external and internal wall panels and ceilings in the axes "13" from the 5th floor to the technical floor Installation of internal engineering systems in the process of execution and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902897173
Unscheduled inspection
Start date: 2019-07-31, end date: 2019-08-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the regulation dated 27062019 g2 Compliance of the installation of 910 floors the completed stage and the construction materials used in the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation3 Availability of a construction permit 4 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 001902862073
Unscheduled inspection
Start date: 2019-07-31, end date: 2019-08-27, duration:
Authority: Uralskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: this inspection is carried out in order to comply with the previously issued instruction from 23052019 01190086the tasks of this inspection are to identify and suppress violations of regulatory legal normative technical acts standards and norms regulating the activities of the motor transport complex7 The subject of this inspection is the fulfillment of the instructions of the state control bodies supervision of measures to prevent harm to the life health of citizens harm to animals plants the environment


# 741902830828
Unscheduled inspection
Start date: 2019-07-05, end date: 2019-08-01, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the construction of concrete structures of the basement of 14 floors during the production of works and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation 4 Verification of the execution of the prescription from 04062019


# 741902830646
Unscheduled inspection
Start date: 2019-07-05, end date: —, duration:
Authority:
Purpose of inspection:


# 741902806523
Unscheduled inspection
Start date: 2019-06-21, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741902809884
Unscheduled inspection
Start date: 2019-06-24, end date: —, duration:
Authority:
Purpose of inspection:


# 741902823607
Unscheduled inspection
Start date: 2019-06-28, end date: 2019-07-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of external and internal wall panels and ceilings in the axes "16" from the second to the fourth floor in the course of work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902823629
Unscheduled inspection
Start date: 2019-06-28, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741902769167
Unscheduled inspection
Start date: 2019-06-06, end date: 2019-06-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the regulation from 03042019 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902751859
Unscheduled inspection
Start date: 2019-06-04, end date: 2019-06-10, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of 35 floors the completed stage and the construction materials used in the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902820409
Unscheduled inspection
Start date: 2019-06-27, end date: 2019-07-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of external and internal wall panels and ceilings in axes 13 from the second to the fourth floor and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902742580
Unscheduled inspection
Start date: 2019-05-30, end date: 2019-06-05, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the prescription from 03042019 g2 Compliance of the work on the installation of the technical floor during the production of works and the construction materials used during the construction of the capital construction facility as well as the results of such work with the design documentation3 Availability of a construction permit 4 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902742571
Unscheduled inspection
Start date: 2019-05-31, end date: 2019-06-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the regulation dated 16042019 g2 Compliance of the work on the installation of structures of 9 technical floors during the production of works and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of design documentation3 Availability of a construction permit 4 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 001902711509
Unscheduled inspection
Start date: 2019-05-13, end date: 2019-05-29, duration:
Authority: Uralskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: this check is carried out in order to comply with the previously issued instruction from 11032019 01190040the tasks of this check are to identify and suppress violations of regulatory legal normative technical acts standards and norms regulating the activities of the motor transport complex7 The subject of this check is to comply with the instructions of the state control bodies supervision of measures to prevent harm to the life health of citizens harm to animals plants the environment


# 741902717220
Unscheduled inspection
Start date: 2019-05-20, end date: 2019-05-24, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the execution of the regulation from 19032019 2 Availability of a building permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902717210
Unscheduled inspection
Start date: 2019-05-20, end date: 2019-05-24, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the execution of the regulation from 19032019 2 Availability of a building permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902724863
Unscheduled inspection
Start date: 2019-05-24, end date: 2019-05-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of window installation works with the device of internal engineering systems of elevator equipment, finishing works and construction materials used during the construction of a capital construction facility, as well as the results of such work, with design documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902740307
Unscheduled inspection
Start date: 2019-05-29, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741902735313
Unscheduled inspection
Start date: 2019-05-29, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741902735296
Unscheduled inspection
Start date: 2019-05-29, end date: 2019-06-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of external and internal wall panels and ceilings in the axes "16" from the ground floor to the overlap of the 1st floor during the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning the Code of the Russian Federation


# 741902735326
Unscheduled inspection
Start date: 2019-05-29, end date: 2019-06-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of external and internal wall panels and ceilings in axes 13 from the ground floor to the first floor and the construction materials used during the construction of the capital construction facility as well as the results of such work with design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902715592
Unscheduled inspection
Start date: 2019-05-27, end date: —, duration:
Authority:
Purpose of inspection:


# 741902732275
Unscheduled inspection
Start date: 2019-05-28, end date: —, duration:
Authority:
Purpose of inspection:


# 741902732392
Unscheduled inspection
Start date: 2019-05-28, end date: 2019-06-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of external and internal wall panels and ceilings in the axes "14" from the ground floor to the overlap of the 3rd floor during the execution of work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning the Code of the Russian Federation


# 741902678358
Unscheduled inspection
Start date: 2019-04-30, end date: 2019-05-08, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of prefabricated concrete 910 floors, the installation of the technical floor and roof when installing external and internal water supply networks, heating mains, sewerage when performing electrical work, finishing work, installation of windows, doors, etc. and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of design documentation 2 Availability of a construction permit 3 Execution requirements of hh 23i 31 st52 of the Urban Planning Code of the Russian Federation


# 741902629004
Unscheduled inspection
Start date: 2019-04-10, end date: 2019-04-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of structures of 24 floors in the course of work and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902629030
Unscheduled inspection
Start date: 2019-04-18, end date: 2019-04-24, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of structures of the 10th and technical floors during the production process and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902659492
Unscheduled inspection
Start date: 2019-04-22, end date: —, duration:
Authority:
Purpose of inspection:


# 741902611621
Unscheduled inspection
Start date: 2019-04-04, end date: —, duration:
Authority:
Purpose of inspection:


# 741902656013
Unscheduled inspection
Start date: 2019-04-25, end date: 2019-05-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of structures of 58 floors in the course of work and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902652961
Unscheduled inspection
Start date: 2019-04-25, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741902663543
Unscheduled inspection
Start date: 2019-04-29, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741902562010
Unscheduled inspection
Start date: 2019-03-12, end date: 2019-03-18, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the grillage the completed stage of the installation of the structures of the ground 1st floor during the production of works and the construction materials used during the construction of the capital construction facility as well as the results of such work with the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902561993
Unscheduled inspection
Start date: 2019-03-12, end date: 2019-03-18, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the structures of the basement of the 3rd floor and the building materials used in the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902563812
Unscheduled inspection
Start date: 2019-03-13, end date: 2019-03-19, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the construction of reinforced concrete structures of the technical floor with the roof structure and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902563804
Unscheduled inspection
Start date: 2019-03-13, end date: —, duration:
Authority:
Purpose of inspection:


# 741902570941
Unscheduled inspection
Start date: 2019-03-15, end date: 2019-03-21, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on pile driving in the axes "110" with the reinforcement and concreting of the grillage and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902574090
Unscheduled inspection
Start date: 2019-03-18, end date: 2019-03-22, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of pile driving, reinforcement and concreting of the grillage in the axes "14" and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902590127
Unscheduled inspection
Start date: 2019-03-27, end date: 2019-04-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the grillage with the installation of structures of the ground floor during the production of works and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902591393
Unscheduled inspection
Start date: 2019-03-28, end date: 2019-04-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the preparation of the foundation for pile driving with the work on pile driving in the axes "16" reinforcement and concreting of the grillage and the construction materials used during the construction of the capital construction facility as well as the results of such work with the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902591294
Unscheduled inspection
Start date: 2019-03-28, end date: —, duration:
Authority:
Purpose of inspection:


# 741902591283
Unscheduled inspection
Start date: 2019-03-28, end date: —, duration:
Authority:
Purpose of inspection:


# 741902550359
Unscheduled inspection
Start date: 2019-03-06, end date: —, duration:
Authority:
Purpose of inspection:


# 741902541269
Unscheduled inspection
Start date: 2019-03-06, end date: 2019-03-12, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of reinforced concrete structures of 79 floors and the building materials used during the construction of a capital construction facility as well as the results of such work with the requirements of design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23i 31 st52 of the Urban Planning Code of the Russian Federation


# 741902587810
Unscheduled inspection
Start date: 2019-03-25, end date: 2019-03-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of pile driving, reinforcement and concreting of the grillage in the axes "14" and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902541721
Unscheduled inspection
Start date: 2019-03-04, end date: 2019-03-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on pile driving in the axes "110" with the reinforcement and concreting of the grillage and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902505819
Unscheduled inspection
Start date: 2019-02-14, end date: —, duration:
Authority:
Purpose of inspection:


# 741902491046
Unscheduled inspection
Start date: 2019-02-11, end date: 2019-02-15, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of internal and external enclosing structures of 46 floors and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902487661
Unscheduled inspection
Start date: 2019-02-11, end date: —, duration:
Authority:
Purpose of inspection:


# 001902486538
Unscheduled inspection
Start date: 2019-02-11, end date: 2019-03-11, duration:
Authority: Uralskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: this inspection is carried out in order to comply with the previously issued instruction dated 19122018 01180257 the objectives of this inspection are to identify and suppress violations of regulatory legal normative technical acts standards and norms regulating the activities of the motor transport complex 7 The subject of this inspection is to comply with the instructions of state control and supervision bodies to take measures to prevent harm to the life health of citizens harm to animals plants and the environment


# 741902514355
Unscheduled inspection
Start date: 2019-02-21, end date: 2019-02-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed on the installation of structures of the technical floor of the roof and the building materials used in the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902512118
Unscheduled inspection
Start date: 2019-02-25, end date: 2019-03-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of internal and external enclosing structures 7 technical floors and building materials used in the construction of a capital construction facility as well as the results of such work with the requirements of design documentation 2 Verification of compliance with the requirements of 24.012019 3 Availability of a construction permit 4 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902465838
Unscheduled inspection
Start date: 2019-02-01, end date: —, duration:
Authority:
Purpose of inspection:


# 741902535559
Unscheduled inspection
Start date: 2019-02-28, end date: 2019-03-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of internal and external enclosing structures of 37 floors and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902535548
Unscheduled inspection
Start date: 2019-02-28, end date: 2019-03-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the grillage the completed stage of the installation of the structures of the ground floor of the 1st floor during the production of works and the construction materials used during the construction of the capital construction facility as well as the results of such work with the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902535539
Unscheduled inspection
Start date: 2019-02-28, end date: 2019-03-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the structures of the basement of the 3rd floor and the building materials used in the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902340933
Unscheduled inspection
Start date: 2019-01-10, end date: 2019-01-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed on the installation of external and internal wall panels and floor slabs from the 7th to the technical floor installation of internal engineering systems in the process of execution and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 The Urban Planning Code of the Russian Federation


# 741902433599
Unscheduled inspection
Start date: 2019-01-18, end date: 2019-01-24, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the basement, installation of internal and external enclosing structures of 13 floors and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902433580
Unscheduled inspection
Start date: 2019-01-18, end date: 2019-01-24, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed on the installation of internal wall panels and ceilings from the fourth to the overlap of the sixth floor during the production of works and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902433636
Unscheduled inspection
Start date: 2019-01-18, end date: 2019-01-24, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the basement, the installation of internal and external enclosing structures of 12 floors and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902429123
Unscheduled inspection
Start date: 2019-01-16, end date: —, duration:
Authority:
Purpose of inspection:


# 741902416150
Unscheduled inspection
Start date: 2019-01-16, end date: 2019-01-22, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of external and internal wall panels floor slabs of 56 floors and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23i 31 st52 of the Urban Planning Code of the Russian Federation


# 741902437319
Unscheduled inspection
Start date: 2019-01-21, end date: 2019-01-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the construction of reinforced concrete structures of 610 floors and the building materials used in the construction of a capital construction facility as well as the results of such work with the requirements of design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902437339
Unscheduled inspection
Start date: 2019-01-21, end date: —, duration:
Authority:
Purpose of inspection:


# 741802163470
Unscheduled inspection
Start date: 2018-12-04, end date: 2018-12-10, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed on the installation of internal wall panels and ceilings from the basement to the overlap of the third floor during the production of works and building materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802180563
Unscheduled inspection
Start date: 2018-12-05, end date: 2018-12-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on roofing, filling of window openings, glazing of loggias after completion of work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802210673
Unscheduled inspection
Start date: 2018-12-07, end date: 2018-12-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the completed work on the installation of reinforced concrete from the 2nd to the 9th floors upon completion of work on the 10th floor during the production of works and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802187571
Unscheduled inspection
Start date: 2018-12-10, end date: 2018-12-14, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed on the installation of external and internal wall panels and floor slabs from the 3rd to the 6th floor and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802215050
Unscheduled inspection
Start date: 2018-12-11, end date: 2018-12-17, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the construction of reinforced concrete structures of 10 technical floors and the building materials used in the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802215035
Unscheduled inspection
Start date: 2018-12-11, end date: 2018-12-17, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the ground floor and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802292092
Unscheduled inspection
Start date: 2018-12-17, end date: 2019-01-18, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the execution of the instruction dated 29102018 on the notification of the elimination of violations during the construction of capital construction facilities bx1004 dated 28112018 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802096978
Unscheduled inspection
Start date: 2018-11-21, end date: 2018-11-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of external and internal wall panels of floor slabs of 14 floors and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23i 31 st52 of the Urban Planning Code of the Russian Federation


# 741802028016
Unscheduled inspection
Start date: 2018-11-01, end date: 2018-11-08, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of internal and external enclosing structures of 810 floors after completion of work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802028000
Unscheduled inspection
Start date: 2018-11-01, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741802027971
Unscheduled inspection
Start date: 2018-11-01, end date: 2018-11-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of a monolithic grillage after completion of work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802027809
Unscheduled inspection
Start date: 2018-11-01, end date: 2018-11-08, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed on the installation of the pile field and the device of the grillage during the production of works and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 001802105565
Unscheduled inspection
Start date: 2018-11-26, end date: 2018-12-21, duration:
Authority: Uralskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: this inspection is carried out in order to comply with the previously issued instruction from 19102018 01180207 the objectives of this inspection are to identify and suppress violations of regulatory legal normative technical acts standards and norms regulating the activities of the motor transport complex 7 The subject of this inspection is to comply with the instructions of state control and supervision bodies to take measures to prevent harm to the life health of citizens harm to animals plants and the environment


# 741802046299
Unscheduled inspection
Start date: 2018-11-06, end date: 2018-11-12, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of structures of 10 technical floors with the roof arrangement after completion of work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation 4 Compliance with the regulations of 151018


# 741802051654
Unscheduled inspection
Start date: 2018-11-07, end date: —, duration:
Authority:
Purpose of inspection:


# 741802051641
Unscheduled inspection
Start date: 2018-11-07, end date: 2018-11-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the grillage, the installation of the ground floor and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802051631
Unscheduled inspection
Start date: 2018-11-07, end date: —, duration:
Authority:
Purpose of inspection:


# 741802078421
Unscheduled inspection
Start date: 2018-11-13, end date: 2018-11-19, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the organization of the construction site removal of networks from the construction site removal of the axes of the object in kind to earthworks installation of foundations and building materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802091282
Unscheduled inspection
Start date: 2018-11-15, end date: 2018-11-21, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the construction of reinforced concrete structures of 59 floors and the building materials used in the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802091221
Unscheduled inspection
Start date: 2018-11-15, end date: 2018-12-12, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the construction of concrete structures of 1-5 floors and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741801976214
Unscheduled inspection
Start date: 2018-10-23, end date: —, duration:
Authority:
Purpose of inspection:


# 741801976188
Unscheduled inspection
Start date: 2018-10-23, end date: 2018-10-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the pile field after the completion of the monolithic grillage during the completion of the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741801976172
Unscheduled inspection
Start date: 2018-10-23, end date: 2018-10-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the pile foundation after completion of the work with the grillage device during the completion of the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741801976085
Unscheduled inspection
Start date: 2018-10-23, end date: 2018-10-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed on the installation of the pile field and the device of the grillage during the production of works and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 001801732646
Unscheduled inspection
Start date: 2018-10-02, end date: 2018-10-26, duration:
Authority: Uralskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: this inspection is carried out in order to comply with the previously issued instruction from 31082018 01180174 the objectives of this inspection are to identify and suppress violations of regulatory legal normative technical acts standards and norms regulating the activities of the motor transport complex 7 The subject of this inspection is to comply with the instructions of state control and supervision bodies to take measures to prevent harm to the life health of citizens harm to animals plants and the environment


# 741801998724
Unscheduled inspection
Start date: 2018-10-26, end date: 2018-11-01, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Inspection of the interior decoration of the premises Installation of internal engineering systems Installation of elevator equipment Compliance with fire and sanitary epidemiological measures measures to ensure access for low-mobility groups of the population Facade decoration Landscaping of the house territory and installation of small architectural forms During the production of works as well as the results of such work to the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741801998705
Unscheduled inspection
Start date: 2018-10-26, end date: 2018-11-01, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Inspection of the interior decoration of the premises Installation of internal engineering systems Installation of elevator equipment Compliance with fire and sanitary epidemiological measures measures to ensure access for low-mobility groups of the population Facade decoration Landscaping of the house territory and installation of small architectural forms During the production of works As well as the construction materials used during the construction of the capital construction facility as well as the results of such work to the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802018566
Unscheduled inspection
Start date: 2018-10-29, end date: 2018-11-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed on the installation of external and internal wall panels and ceilings from the basement to the overlap of its 3rd floor and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741801906473
Unscheduled inspection
Start date: 2018-10-09, end date: 2018-10-15, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of structures of 48 floors in the ABV axes of the installation of structures of 69 floors in the 14GJ axes during the completion of work and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation 4 Fulfillment of the prescription from 06082018 extended to 19092018


# 741801906464
Unscheduled inspection
Start date: 2018-10-09, end date: 2018-10-15, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Installation of structures of the technical floor of the roof and the building materials used during the construction of the capital construction facility as well as the results of such work to the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation 4 Compliance with the regulations of 06082018


# 741801906430
Unscheduled inspection
Start date: 2018-10-09, end date: 2018-10-15, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the technical floor with the roof arrangement after completion of the work Filling of window openings glazing of loggias during the work process As well as the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741801914138
Unscheduled inspection
Start date: 2018-10-12, end date: —, duration:
Authority:
Purpose of inspection:


# 741801928461
Unscheduled inspection
Start date: 2018-10-16, end date: —, duration:
Authority:
Purpose of inspection:


# 741801928357
Unscheduled inspection
Start date: 2018-10-16, end date: —, duration:
Authority:
Purpose of inspection:


# 741801928344
Unscheduled inspection
Start date: 2018-10-16, end date: 2018-10-22, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the pile foundation after completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741801902814
Unscheduled inspection
Start date: 2018-10-16, end date: 2018-10-22, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the decoration of facade surfaces and interior spaces landscaping of the adjacent territory and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741801339182
Unscheduled inspection
Start date: 2018-09-18, end date: —, duration:
Authority:
Purpose of inspection:


# 741800648590
Unscheduled inspection
Start date: 2018-09-05, end date: 2018-09-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of internal engineering systems of power supply heating cold and hot water supply sanitation, finishing works and construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800620233
Unscheduled inspection
Start date: 2018-08-14, end date: 2018-08-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed when filling window openings fencing and glazing balconies and loggias from the 6th to the 10th floors installation of elevator equipment and building materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 001800592804
Unscheduled inspection
Start date: 2018-08-14, end date: 2018-09-10, duration:
Authority: Uralskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: this inspection is carried out in order to comply with the previously issued instruction from 11072018 01180139 the objectives of this inspection are to identify and suppress violations of regulatory legal normative technical acts standards and norms regulating the activities of the motor transport complex The subject of this inspection is to comply with the instructions of state control and supervision bodies to take measures to prevent harm to the life health of citizens harm to animals plants and the environment


# 741800620506
Unscheduled inspection
Start date: 2018-08-16, end date: 2018-08-22, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the works on the improvement of the adjacent territory of the installation of small architectural forms as well as the construction materials used in construction as well as the results of such work with the requirements of technical regulations and design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800665171
Unscheduled inspection
Start date: 2018-08-28, end date: —, duration:
Authority:
Purpose of inspection:


# 741800665164
Unscheduled inspection
Start date: 2018-08-28, end date: 2018-09-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of concrete structures of the basement 1 3 floors in the ABV axes of the installation of the 35th floor in the 14GJ axes during the production of works and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation


# 741800665105
Unscheduled inspection
Start date: 2018-08-28, end date: 2018-09-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of internal and external reinforced concrete structures of the basement 710 floors during the production of works And the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800638249
Unscheduled inspection
Start date: 2018-08-20, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741800629951
Unscheduled inspection
Start date: 2018-08-21, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741800569334
Unscheduled inspection
Start date: 2018-08-01, end date: —, duration:
Authority:
Purpose of inspection:


# 741800583860
Unscheduled inspection
Start date: 2018-07-31, end date: —, duration:
Authority:
Purpose of inspection:


# 741800583867
Unscheduled inspection
Start date: 2018-07-31, end date: 2018-08-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the grillage in the ABV axes after completion of the work, the grillage device installation of the basement and 12 floors in the 14J axes during the work, the grillage device installation of the basement and 1 floors in the DG axes during the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800583814
Unscheduled inspection
Start date: 2018-07-31, end date: —, duration:
Authority:
Purpose of inspection:


# 741800575455
Unscheduled inspection
Start date: 2018-07-31, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741800500593
Unscheduled inspection
Start date: 2018-07-10, end date: 2018-07-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of reinforced concrete structures from the seventh to the sixteenth floors in the axes 12 1s13s AB ASZHS in the course of work and the construction materials used during the construction of the capital construction facility as well as the construction materials used during the construction of the capital construction facility results of such work with the requirements of technical regulations design documentation 2 Availability of a construction permit 3 Compliance with the requirements hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800536275
Unscheduled inspection
Start date: 2018-07-12, end date: —, duration:
Authority:
Purpose of inspection:


# 741800536199
Unscheduled inspection
Start date: 2018-07-13, end date: 2018-07-19, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The actual condition of the capital construction facility 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800533298
Unscheduled inspection
Start date: 2018-07-13, end date: —, duration:
Authority:
Purpose of inspection:


# 741800533289
Unscheduled inspection
Start date: 2018-07-13, end date: —, duration:
Authority:
Purpose of inspection:


# 741800533424
Unscheduled inspection
Start date: 2018-07-13, end date: 2018-07-19, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The actual condition of the capital construction facility 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800533263
Unscheduled inspection
Start date: 2018-07-13, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 001800499937
Unscheduled inspection
Start date: 2018-07-03, end date: 2018-07-27, duration:
Authority: Uralskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: this inspection is carried out in order to comply with the previously issued instruction from 31052018 01180096 the objectives of this inspection are to identify and suppress violations of regulatory legal normative technical acts standards and norms regulating the activities of the motor transport complex The subject of this inspection is to comply with the instructions of state control and supervision bodies to take measures to prevent harm to the life health of citizens harm to animals plants and the environment


# 741800404091
Unscheduled inspection
Start date: 2018-06-05, end date: 2018-06-09, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of reinforced concrete structures from the first to the sixth floors in the axes "12 1s13s AB ASZHS" and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800418688
Unscheduled inspection
Start date: 2018-06-08, end date: 2018-06-15, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of internal and external enclosing structures of those floors in the "14" axes from 9 floors in the "AB" axes after completion of the work to the roof and the construction materials used in construction, as well as the results of such work, with the requirements of technical regulations and design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800401772
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-06-07, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the masonry of internal walls and partitions with the installation of lintels of 47 floors of the building materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800350852
Unscheduled inspection
Start date: 2018-05-10, end date: 2018-05-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of masonry internal walls and partitions, the installation of lintels of 13 floors and the construction materials used in the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 001800363887
Unscheduled inspection
Start date: 2018-05-14, end date: 2018-06-08, duration:
Authority: Uralskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: this inspection is carried out in order to comply with the previously issued instruction from 10042018 01180057 the objectives of this inspection are to identify and suppress violations of regulatory legal normative technical acts standards and norms regulating the activities of the motor transport complex The subject of this inspection is to comply with the instructions of state control and supervision bodies to take measures to prevent harm to the life health of citizens harm to animals plants and the environment


# 741800366785
Unscheduled inspection
Start date: 2018-05-16, end date: 2018-05-22, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of internal and external enclosing structures 510 floors in the axes "14" 58 floors in the axes "AB" after completion of the work and the construction materials used in construction, as well as the results of such work, with the requirements of technical regulations and design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation


# 741800405569
Unscheduled inspection
Start date: 2018-05-29, end date: 2018-06-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the pile foundation after completion of the work and the installation of the grillage during the production of work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800405554
Unscheduled inspection
Start date: 2018-05-29, end date: 2018-06-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the pile foundation of the pile grillage after completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800405475
Unscheduled inspection
Start date: 2018-05-29, end date: 2018-06-15, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the pile field in the AB axes after completion of the work on the installation of the pile field in the 14GJ axes during the production of works and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800404279
Unscheduled inspection
Start date: 2018-05-29, end date: 2018-06-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the completed work on the installation of reinforced concrete of the technical floor in the axes of AG 27 and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800290994
Unscheduled inspection
Start date: 2018-04-18, end date: 2018-04-24, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of a monolithic grillage, backfilling and installation of reinforced concrete structures of the basement in the axes "12 1s13s A B ASZHS" and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation


# 741800249920
Unscheduled inspection
Start date: 2018-04-09, end date: 2018-04-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of load-bearing and enclosing structures of external and internal wall panels of internal partitions of the technical floor parapet roofing panels of work on waterproofing the roof and building materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 The Urban Planning Code of the Russian Federation


# 741800295170
Unscheduled inspection
Start date: 2018-04-25, end date: 2018-05-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of technical floor structures, installation of windows, roofing after completion of work and the construction materials used in construction, as well as the results of such work, with the requirements of technical regulations and design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800312249
Unscheduled inspection
Start date: 2018-04-26, end date: 2018-05-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the completed works on the installation of the building box in the axes AG from 5 to 10 floors in the axes 27 from 7 to 10 floors in the axes 810 from 9 to 10 floors technical floor in the axes 1113 10th floor technical floor and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 3 Availability of a construction permit 4 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 001800187359
Unscheduled inspection
Start date: 2018-03-19, end date: 2018-04-13, duration:
Authority: Uralskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: this inspection is carried out in order to comply with the previously issued instruction from 15022018 01180027 the objectives of this inspection are to identify and suppress violations of regulatory legal normative technical acts standards and norms regulating the activities of the motor transport complex The subject of this inspection is to comply with the instructions of state control and supervision bodies to take measures to prevent harm to the life health of citizens harm to animals plants and the environment


# 741800220104
Unscheduled inspection
Start date: 2018-03-28, end date: 2018-04-10, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the completed work on the installation of the building box in axes 27 from the 2nd to the 6th floors in axes 810 from the 3rd to the 8th floors in axes 1113 from the basement to the 9th floors and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800220156
Unscheduled inspection
Start date: 2018-03-29, end date: —, duration:
Authority:
Purpose of inspection:


# 741800060829
Unscheduled inspection
Start date: 2018-02-21, end date: 2018-02-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the ground floor 1-2 floors after completion of the work and the construction materials used in construction, as well as the results of such work, with the requirements of technical regulations and design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 001800015428
Unscheduled inspection
Start date: 2018-01-30, end date: 2018-02-27, duration:
Authority: Uralskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: this inspection is carried out in order to comply with the previously issued instruction from 14112017 01170204 the objectives of this inspection are to identify and suppress violations of regulatory legal normative technical acts standards and norms regulating the activities of the motor transport complex 7 The subject of this inspection is the fulfillment of the instructions of the state control and supervision bodies


# 74170802956117
Unscheduled inspection
Start date: 2017-12-14, end date: 2017-12-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the completed stages of the construction of the building box as well as the construction materials used in the construction of the capital construction facility with the results of such work with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802767190
Unscheduled inspection
Start date: 2017-10-30, end date: —, duration:
Authority:
Purpose of inspection:


# 74170802274702
Unscheduled inspection
Start date: 2017-09-19, end date: 2017-09-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the completed stage of foundation construction with the process of building the first floor of the building as well as the construction materials used in the construction of the capital construction facility, the results of such work, with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802484479
Unscheduled inspection
Start date: 2017-09-25, end date: 2017-09-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the construction of 910 floors of those floors and roofs and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802484477
Unscheduled inspection
Start date: 2017-09-25, end date: 2017-09-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on filling window openings of 610 floors waterproofing of the roof and the building materials used in the construction process reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code RF4THE verification of the execution of the prescription from 19062017


# 74170802484468
Unscheduled inspection
Start date: 2017-09-25, end date: 2017-09-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of internal and external enclosing structures of 610 floors of those floors and roofs and the building materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802484467
Unscheduled inspection
Start date: 2017-09-25, end date: 2017-09-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of the technical floor and roof filling of window openings of 110 floors and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation2 The presence of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code RF4 Verification of the execution of the prescription from 20062017


# 74170801941524
Unscheduled inspection
Start date: 2017-09-04, end date: 2017-09-08, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of internal and external load-bearing enclosing structures of 910 floors and the building materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170801941520
Unscheduled inspection
Start date: 2017-09-04, end date: 2017-09-08, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of internal and external enclosing structures of 15 floors and the building materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170801941517
Unscheduled inspection
Start date: 2017-09-01, end date: 2017-09-07, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on filling window openings of 15 floors and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170801941516
Unscheduled inspection
Start date: 2017-09-01, end date: 2017-09-07, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the arrangement of 18 floors and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170701814212
Unscheduled inspection
Start date: 2017-08-02, end date: 2017-08-08, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of internal and external load-bearing enclosing structures of 68 floors and the building materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701814209
Unscheduled inspection
Start date: 2017-08-02, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701813989
Unscheduled inspection
Start date: 2017-08-01, end date: 2017-08-07, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of internal and external load-bearing enclosing structures of 610 floors of those floors and the building materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701814213
Unscheduled inspection
Start date: 2017-08-01, end date: 2017-08-07, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the ground floor and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701734191
Unscheduled inspection
Start date: 2017-07-03, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701734189
Unscheduled inspection
Start date: 2017-07-03, end date: 2017-07-07, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of a monolithic grillage and the construction materials used in the construction process of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701734185
Unscheduled inspection
Start date: 2017-07-03, end date: 2017-07-07, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of internal and external enclosing structures of the third and fifth floors and the building materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701810595
Unscheduled inspection
Start date: 2017-07-20, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701707657
Unscheduled inspection
Start date: 2017-06-16, end date: 2017-06-22, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of work on the installation of structures of 10 technical floors and roofs and the construction materials used in the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701671568
Unscheduled inspection
Start date: 2017-06-13, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701671562
Unscheduled inspection
Start date: 2017-06-14, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74170701671434
Unscheduled inspection
Start date: 2017-06-14, end date: 2017-06-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the development of the foundation pit, the installation of a pile foundation and a monolithic grillage and the construction materials used in the construction process of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701724376
Unscheduled inspection
Start date: 2017-06-22, end date: 2017-06-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of foundations, the installation of a grillage in the axes 4 to 5 of a residential building and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701554328
Unscheduled inspection
Start date: 2017-05-10, end date: 2017-05-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the installation of reinforced concrete structures of the 9th and 10th floors and the construction materials used in the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701629800
Unscheduled inspection
Start date: 2017-05-24, end date: 2017-05-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of a pile foundation and a monolithic grillage and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701554323
Unscheduled inspection
Start date: 2017-05-02, end date: 2017-05-10, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the installation of reinforced concrete structures of the 9th and 10th floors and the construction materials used in the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701563590
Unscheduled inspection
Start date: 2017-04-28, end date: 2017-05-05, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of structures of 79 floors and the building materials used in the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701554325
Unscheduled inspection
Start date: 2017-04-26, end date: 2017-05-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of reinforced concrete structures of the 58th floor and the building materials used in the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701554319
Unscheduled inspection
Start date: 2017-04-26, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701559845
Unscheduled inspection
Start date: 2017-04-25, end date: 2017-05-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the fulfillment of the prescription from 21032017G2THE compliance of the work on the installation of the 810th floor of the technical floor of the roof insulation of the technical floor and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation3the presence of a construction permit4the fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701554321
Unscheduled inspection
Start date: 2017-04-21, end date: 2017-04-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of reinforced concrete structures of the 58th floor and the building materials used in the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701441368
Unscheduled inspection
Start date: 2017-03-15, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701491028
Unscheduled inspection
Start date: 2017-03-31, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701491025
Unscheduled inspection
Start date: 2017-03-31, end date: 2017-04-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed in the axes "47" for the installation of reinforced concrete structures of the technical floor to the roof and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701485807
Unscheduled inspection
Start date: 2017-03-29, end date: 2017-04-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the completed works on the installation of monolithic reinforced concrete grillings with the installation of the 14th floor during the production of works and building materials used in the construction of a residential building 11 str. in the residential district 49A of the residential district 11 Krasnopolskaya site 1 at Musa Jalil street in the Kurchatov district of Chelyabinsk, Chelyabinsk region, as well as the results of such work with the requirements of technical regulations and design documentation2 Availability building permits 3 Compliance with the requirements of hh 2 3 art 52 of the Urban Planning Code of the Russian Federation


# 74170701485804
Unscheduled inspection
Start date: 2017-03-29, end date: 2017-04-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the completed works on the installation of monolithic reinforced concrete grillings with the installation of the 14th floor during the production of works and building materials used in the construction of a residential building 10 pages in the residential district 49A of the residential district 11 Krasnopolskaya site 1 at Musa Jalil Street in the Kurchatov district of Chelyabinsk, Chelyabinsk region, as well as the results of such work with the requirements of technical regulations and design documentation2 Availability building permits 3 Compliance with the requirements of hh 2 3 art 52 of the Urban Planning Code of the Russian Federation


# 74170701485802
Unscheduled inspection
Start date: 2017-03-29, end date: 2017-04-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed on the sinking of piles to the device of monolithic reinforced concrete grillings in the course of work and the construction materials used in the construction of a residential building 12 pages in the residential district 49A of the residential district 11 Krasnopolskaya site 1 at Musa Jalil Street in the Kurchatov district of Chelyabinsk, Chelyabinsk region, as well as the results of such work with the requirements of technical regulations and design documentation2 Availability of a permit on construction3 Compliance with the requirements of hh 2 3 st 52 of the Urban Planning Code of the Russian Federation


# 74170701472315
Unscheduled inspection
Start date: 2017-03-24, end date: 2017-03-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of work on the installation of structures of 46 floors and the construction materials used in the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701378252
Unscheduled inspection
Start date: 2017-02-15, end date: 2017-02-21, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The presence of a construction permit 2The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code RF3THE compliance of the installation of the 1st and 2nd floor technical floor and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation


# 74170701335049
Unscheduled inspection
Start date: 2017-02-06, end date: 2017-02-10, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of prefabricated reinforced concrete structures of 510 floors, masonry partitions and building materials used in the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701403324
Unscheduled inspection
Start date: 2017-02-27, end date: 2017-03-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed on the sinking of piles to the device of monolithic reinforced concrete grillings in the course of work and the construction materials used in the construction of a residential building 11 str. in the residential district 49A of the residential district 11 Krasnopolskaya site 1 at Musa Jalil Street in the Kurchatov district of Chelyabinsk, Chelyabinsk region, as well as the results of such work with the requirements of technical regulations and design documentation2 Availability of a permit on construction3 Compliance with the requirements of hh 2 3 st 52 of the Urban Planning Code of the Russian Federation


# 74170701365570
Unscheduled inspection
Start date: 2017-02-21, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701305297
Unscheduled inspection
Start date: 2017-01-19, end date: 2017-01-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed on the installation of external and internal wall panels in the axes "13" of the second and third floor and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701322419
Unscheduled inspection
Start date: 2017-01-31, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74170701329591
Unscheduled inspection
Start date: 2017-01-27, end date: 2017-02-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed on the sinking of piles to the device of monolithic reinforced concrete grillings in the course of work and the construction materials used in the construction of a residential building 10 pages in the residential district 49A of the residential district 11 Krasnopolskaya site 1 at Musa Jalil Street in the Kurchatov district of Chelyabinsk, Chelyabinsk region, as well as the results of such work with the requirements of technical regulations and design documentation2 Availability of a permit on construction3 Compliance with the requirements of hh 2 3 st 52 of the Urban Planning Code of the Russian Federation


# 74170701322415
Unscheduled inspection
Start date: 2017-01-26, end date: 2017-02-01, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of external and internal wall panels in axes 47 from the second to the tenth floors and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701305299
Unscheduled inspection
Start date: 2017-01-20, end date: 2017-01-26, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the completed works on the installation of reinforced concrete structures of external and internal wall panels and floor slabs in the axes "1c7c" "ASZHS" on the 17th floor and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701224039
Unscheduled inspection
Start date: 2016-12-14, end date: 2016-12-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of prefabricated reinforced concrete structures of the basement of 14 floors and the building materials used in the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701246456
Unscheduled inspection
Start date: 2016-12-26, end date: 2016-12-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701269365
Unscheduled inspection
Start date: 2016-12-28, end date: 2016-12-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of external and internal wall panels in the axes "19" from the 4th to the technical floor, as well as floor slabs and partitions and building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701228315
Unscheduled inspection
Start date: 2016-12-20, end date: 2016-12-26, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed in the installation of the roof of machine rooms installation of fire-fighting window blocks in the 3rd block section when finishing slopes and installing window sills glazing loggias installation of elevator equipment when performing finishing works and building materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation2 Fulfillment of the basic requirements of technical regulations on fire and sanitary and epidemiological safety 3The difference building permits 4fulfilling the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701089690
Unscheduled inspection
Start date: 2016-11-15, end date: —, duration:
Authority:
Purpose of inspection:


# 74160701037278
Unscheduled inspection
Start date: 2016-11-01, end date: 2016-11-07, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed during the installation of roof panels of the parapet of machine rooms during waterproofing and insulation of the technical floor when installing internal heat supply networks of HVAC and DHW on 67 floors when installing an internal drainage network and building materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code Russian Federation


# 74160701131601
Unscheduled inspection
Start date: 2016-11-25, end date: —, duration:
Authority:
Purpose of inspection:


# 74160700930643
Unscheduled inspection
Start date: 2016-10-11, end date: 2016-10-17, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed during the installation of roof panels of the parapet during the installation of waterproofing during the insulation of the roof and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160700823417
Unscheduled inspection
Start date: 2016-09-23, end date: 2016-09-26, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160700430612
Unscheduled inspection
Start date: 2016-09-14, end date: 2016-09-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed on the installation of external and internal wall panels in the axes "67" of the ground floor and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160700430252
Unscheduled inspection
Start date: 2016-09-14, end date: 2016-09-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of external and internal wall panels and floor slabs in the axes "1c7c" "ASZHS" from the basement to the first floor to the overlap of the 2nd floor and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160700054046
Unscheduled inspection
Start date: 2016-09-13, end date: 2016-09-19, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed in the installation of the control unit, the insulation of heat supply networks according to the technical field, the device of radon protection and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2The observance of fire-fighting and sanitary epidemiological measures 3The presence of a construction permit 4The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160700054017
Unscheduled inspection
Start date: 2016-09-13, end date: 2016-09-19, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed during the installation of roof panels of the parapet during the installation of waterproofing during the insulation of the roof and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160700430572
Unscheduled inspection
Start date: 2016-09-16, end date: 2016-09-22, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed during the installation of reinforced concrete structures of external and internal wall panels and floor slabs in the axes of the building "19" "AD" from the fourth to the technical floor and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160700430543
Unscheduled inspection
Start date: 2016-09-16, end date: 2016-09-22, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the insulation of the technical floor, the roofing and the construction materials used in the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160700430432
Unscheduled inspection
Start date: 2016-09-15, end date: 2016-09-21, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of external and internal wall panels in the axes "19" from 1 to the overlap of the third floor and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160700056845
Unscheduled inspection
Start date: 2016-08-26, end date: 2016-09-01, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed on the installation of external and internal wall panels in the axes "15" and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160700056831
Unscheduled inspection
Start date: 2016-08-26, end date: —, duration:
Authority:
Purpose of inspection:


# 74160700053340
Unscheduled inspection
Start date: 2016-08-25, end date: 2016-08-31, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on reinforcement and concreting of the grillings in the axes "19" and the construction materials used in the construction process of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160601766035
Unscheduled inspection
Start date: 2016-08-09, end date: 2016-08-15, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed during the installation of load-bearing and enclosing structures of external and internal wall panels floor slabs of stair lift shafts sanitary cabins ventilation units of the 7th floor and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160601766056
Unscheduled inspection
Start date: 2016-08-09, end date: 2016-08-15, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed in the installation of external power supply networks insulation of internal hot water supply networks heating in the technical field the device of the control unit when performing radon protection in the technical field the device of nodes for entering networks into the house and the building materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2 The presence of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code Russian Federation


# 74160700056882
Unscheduled inspection
Start date: 2016-08-29, end date: 2016-09-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the completed stage of work on reinforcement of grillings and the process of concreting grillings in the axes "1c7c" "ASZHS" and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160700056872
Unscheduled inspection
Start date: 2016-08-29, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74160601788588
Unscheduled inspection
Start date: 2016-08-17, end date: —, duration:
Authority:
Purpose of inspection:


# 74160601708186
Unscheduled inspection
Start date: 2016-07-14, end date: 2016-07-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of external and internal wall panels in the axes "46" from the 1st to the 6th floors, as well as the installation of external and internal wall panels in the axes "79" from the 10th to the technical floor and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2 Building permits 3fulfilling the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160601708575
Unscheduled inspection
Start date: 2016-07-14, end date: 2016-07-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed on the reinforcement and concreting of the grillings in the axes "57" and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160601705720
Unscheduled inspection
Start date: 2016-07-15, end date: 2016-07-21, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the insulation of the attic and the building materials used in the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160601708678
Unscheduled inspection
Start date: 2016-07-19, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74160601708700
Unscheduled inspection
Start date: 2016-07-19, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.