Found 140 inspections:

# 742101387464
Unscheduled inspection
Start date: 2021-12-03, end date: —, duration:
Authority:
Purpose of inspection:


# 742101414994
Unscheduled inspection
Start date: 2021-12-13, end date: 2021-12-17, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on masonry exterior and interior walls of the 1st floor, masonry partitions of the 1st floor, installation of prefabricated w/w elements of the 1st floor, installation of external heating networks, installation of external power supply networks (after completion of work); masonry exterior and interior walls of the 2nd and 3rd floors, masonry partitions 2 and 3 floors, installation of prefabricated railway elements of the 2nd and 3rd floors (in the process of work); installation of window and door blocks, installation of internal power supply networks, installation of internal water supply and sewerage networks, installation of internal heating, ventilation and air conditioning networks, finishing works (in the process of work) and applied construction materials in the process of construction, reconstruction of a capital construction facility, as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (in the event that the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including the requirements of energy efficiency (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742101415083
Unscheduled inspection
Start date: 2021-12-13, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742101321318
Unscheduled inspection
Start date: 2021-11-15, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742101192419
Unscheduled inspection
Start date: 2021-10-18, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742101192409
Unscheduled inspection
Start date: 2021-10-18, end date: 2021-10-22, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the masonry of the exterior and interior walls of the 1st and 2nd floors, masonry partitions of the 1st and 2nd floors, installation of prefabricated w/w elements of the 1st and 2nd floors (in the process of work); installation of outdoor heating networks, installation of outdoor power supply networks, installation of communication networks (in the process of execution works) and the construction materials used in the process of construction, reconstruction of the capital construction facility, as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100710777
Unscheduled inspection
Start date: 2021-09-21, end date: —, duration:
Authority:
Purpose of inspection:


# 742100377464
Unscheduled inspection
Start date: 2021-08-02, end date: —, duration:
Authority:
Purpose of inspection:


# 742100338515
Unscheduled inspection
Start date: 2021-07-12, end date: —, duration:
Authority:
Purpose of inspection:


# 742100338492
Unscheduled inspection
Start date: 2021-07-12, end date: —, duration:
Authority:
Purpose of inspection:


# 742100285888
Unscheduled inspection
Start date: 2021-06-21, end date: 2021-06-25, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on the installation of masonry walls of the 4th floor (after completion of work), installation of prefabricated railway structures of the 4th floor (after completion of work), installation of masonry walls of the 5th floor (during work), installation of prefabricated railway structures of the 5th floor (during work), installation of wooden door blocks, finishing works, installation of internal heating and ventilation networks, installation of an internal water supply and sanitation system, installation of internal power supply networks (during work) and construction materials used during construction, reconstruction of a capital construction facility, as well as the results of such work to the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code of project documentation (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, which are not subject to energy efficiency requirements) and the requirements for equipping a capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100194439
Unscheduled inspection
Start date: 2021-05-24, end date: 2021-05-28, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on the installation of strip foundations (after completion of work), masonry exterior and interior walls of the technical and ground floors, masonry partitions of the technical and first floors, installation of prefabricated w/w elements of the technical and first floors (in the process of work) and used building materials during construction, reconstruction of the facility capital construction, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance information models are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100194457
Unscheduled inspection
Start date: 2021-05-24, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742100151625
Unscheduled inspection
Start date: 2021-04-26, end date: 2021-04-30, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on the installation of masonry walls of the 2nd floor (after completion of work), installation of prefabricated railway structures of the 2nd floor (after completion of work), installation of masonry walls of the 3rd floor (during work), installation of prefabricated railway structures of the 3rd floor (during work), installation of internal power supply networks (in the course of work) and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the design documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with devices accounting for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100073299
Unscheduled inspection
Start date: 2021-03-22, end date: 2021-03-26, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of masonry walls of the 1st floor (after completion of work); installation of prefabricated w/b structures of the 1st floor (after completion of work); installation of masonry walls of the 2nd floor (during work); installation of prefabricated w/b structures of the 2nd floor (during work) and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work, meet the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) information models (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742105305604
Unscheduled inspection
Start date: 2021-01-20, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742005259162
Unscheduled inspection
Start date: 2020-12-14, end date: —, duration:
Authority:
Purpose of inspection:


# 742005221409
Unscheduled inspection
Start date: 2020-11-16, end date: —, duration:
Authority:
Purpose of inspection:


# 742005196645
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-09, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of strip foundations in the course of work and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of the hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742005236232
Unscheduled inspection
Start date: 2020-11-27, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742005147216
Unscheduled inspection
Start date: 2020-10-05, end date: 2020-10-30, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742005145673
Unscheduled inspection
Start date: 2020-10-05, end date: 2020-10-09, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the foundation pit installation of strip foundations during the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Implementation requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004475858
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-08-14, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of masonry on the 3rd floor with the installation of staircases and platforms on the 3rd floor after completion of work installation of floor slabs on the 3rd floor roofing installation of floors on 13 floors finishing works on 13 floors in the process of work internal plumbing works on heating water supply sewerage on the 1st floor internal electrical work on the 1st floor after completion of work internal plumbing works on heating water supply sewerage of 23 floors internal electrical work of 23 floors in the course of work and construction materials used during construction reconstruction of a capital construction facility as well as the results of such work to the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Code of design documentation, taking into account the changes made to the design documentation in accordance with parts 38 and 39 Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004475854
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-08-14, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 the work on the stone walls of the 4th floor installation floor slabs 4th floor of the installation of staircases and platforms the 4th floor after completion of the masonry walls of the 5th floor installation floor slabs 5th floor during execution of works installation of staircases and platforms 5th floor installation window and balcony blocks of PVC in the process of performance device internal heating system in 13 floors for the device internal system of water supply and sanitation at 13 floors of electrical work at 13 floors flooring on 13 floors finishing at 13 floors works for the roofing landscaping of the adjacent territory in the process of work and construction materials used in the construction process of reconstruction of capital construction object and the results of such work requirements approved in accordance with paragraphs 152 and 153 of 15 of article 48 of this Code project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of this Code or information model in the case of the formation and maintenance of information models are required in accordance with the requirements of this Code, including the requirements of energy efficiency with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resources 2 a permission to строительство3 fulfillment of the requirements of CC 23 and 31 ст52 of the town planning code of the Russian Federation


# 742004444665
Unscheduled inspection
Start date: 2020-07-13, end date: 2020-07-17, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of foundations in the course of work with the installation of floor slabs of the technical underground in the course of work and the construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources2 The presence of a permit on construction3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004444636
Unscheduled inspection
Start date: 2020-07-13, end date: 2020-07-17, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the masonry of the 2nd floor after completion of the work with the installation of staircases and platforms of the 2nd floor after completion of the work with the installation of floor slabs of the 2nd floor during the work with the masonry of the 3rd floor during the work with the installation of staircases and platforms of the 3rd floor during the work with internal plumbing works on heating water supply sewerage of the 1st floor during the execution of works on the internal electrical installation of the 1st floor during the execution of works and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work to the requirements of the design documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code, taking into account the changes made to the design documentation in accordance with parts 38 and 39 article 49 of the Urban Planning Code and or information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of the hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004422480
Unscheduled inspection
Start date: 2020-06-05, end date: —, duration:
Authority:
Purpose of inspection:


# 742004422482
Unscheduled inspection
Start date: 2020-06-05, end date: 2020-06-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of foundations in the course of work with the installation of floor slabs of the technical underground in the course of work and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code, taking into account the changes made to the project documentation in in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements of equipping the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004421158
Unscheduled inspection
Start date: 2020-06-05, end date: 2020-06-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the masonry of the 1st floor after completion of the work with the installation of staircases and platforms of the 1st floor after completion of the work with the installation of floor slabs of the 1st floor after completion of the work with the masonry of the 2nd floor during the work installation of staircases and platforms of the 2nd floor during the work and the construction materials used during the construction of the reconstruction of the facility capital construction as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code the Code, including the requirements for energy efficiency, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004432837
Unscheduled inspection
Start date: 2020-06-23, end date: 2020-07-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004411854
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-05-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of door and window openings on the 1st and 3rd floors after completion of work to the installation of floors on the 1st and 3rd floors after completion of work to finishing works on the 1st and 3rd floors during the work internal electrical work on the 1st and 3rd floors during the work internal plumbing work on heating water supply sewerage on the 2nd and 3rd floors in the process of performing landscaping works in the process of performing works and building materials used in the process of construction reconstruction of a capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of the article 49 of the Urban Planning Code and or information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31st st52 of the Urban Planning Code of the Russian Federation


# 742004411839
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-05-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed on the masonry walls of the 2nd floor after completion of the work to the installation of floor slabs of the 2nd floor after completion of the work to the installation of staircases and platforms of the 2nd floor after completion of the work to the masonry walls of the 3rd floor after completion of the work to the installation of floor slabs of the 3rd floor after completion of the work to the installation of staircases and platforms of the 3rd floor after completion of the work to the masonry walls on the 4th floor in the course of work, installation of floor slabs on the 4th floor in the course of work, installation of staircases and platforms on the 4th floor in the course of work and construction materials used in the construction process, reconstruction of a capital construction facility, as well as the results of such work, requirements approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the project documentation, taking into account changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipment of the capital construction facility metering devices for used energy resources2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004396772
Unscheduled inspection
Start date: 2020-04-22, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742004396762
Unscheduled inspection
Start date: 2020-04-22, end date: 2020-04-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of masonry on the 3rd floor after completion of work with the installation of staircases and platforms on the 3rd floor after completion of work with the installation of floor slabs on the 3rd floor after completion of work with the roof installation during the work internal electrical work on the 1st floor during the work installation of door and window openings on the 1st and 3rd floors internal plumbing work for heating water supply sewerage on the 1st and 2nd floors of the building materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code and or information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation


# 742004271808
Unscheduled inspection
Start date: 2020-02-25, end date: 2020-03-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of masonry on the 2nd floor after completion of work installation of staircases and platforms on the 2nd floor after completion of work installation of floor slabs on the 2nd floor installation of masonry on the 3rd floor during the work installation of staircases and platforms on the 3rd floor during the work installation of floor slabs on the 3rd floor during the work internal electrical work on on the 1st floor during the execution of works and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004271868
Unscheduled inspection
Start date: 2020-02-25, end date: —, duration:
Authority:
Purpose of inspection:


# 742004271603
Unscheduled inspection
Start date: 2020-02-25, end date: 2020-03-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed on the masonry walls of the 2nd floor in the process of work installation of floor slabs of the 2nd floor in the process of work installation of staircases and platforms of the 2nd floor in the process of work on the masonry walls of the 3rd floor in the process of work installation of floor slabs of the 3rd floor in the process of work installation of staircases and platforms the 3rd floor in the process of performing works and building materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code, including the requirements of energy efficiency, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipping the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004196949
Unscheduled inspection
Start date: 2020-01-20, end date: 2020-01-24, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the foundation after completion of the work with the installation of floor slabs and underground masonry of the 1st floor during the work, installation of staircases and platforms of the 1st floor during the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Project Documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code, including the requirements of energy efficiency, with the exception of capital construction projects for which the requirements of energy efficiency efficiency does not apply to the requirements of equipping a capital construction facility with metering devices for used energy resources2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741904196948
Unscheduled inspection
Start date: 2019-12-23, end date: 2019-12-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the foundation during the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code Code and or information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741904115202
Unscheduled inspection
Start date: 2019-12-23, end date: 2019-12-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the foundation during the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code Code and or information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741904042085
Unscheduled inspection
Start date: 2019-12-09, end date: 2020-01-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741904042067
Unscheduled inspection
Start date: 2019-12-09, end date: 2020-01-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741904034375
Unscheduled inspection
Start date: 2019-12-09, end date: 2020-01-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st 52 of the Urban Planning Code of the Russian Federation


# 741903898180
Unscheduled inspection
Start date: 2019-11-01, end date: 2019-11-08, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the roof installation work after completion with finishing work on the 5th floor, installation of floors on 45 floors, installation of wooden door blocks of entrances and apartments on 35 floors, installation of an internal water supply and sanitation system on the 5th floor, electrical installation work on the 5th floor, landscaping of the adjacent territory after completion of work, compliance with fire and sanitary epidemiological measures to ensure access for low-mobility groups of the population and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of information models are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st 52 of the Urban Planning Code of the Russian Federation


# 741903966299
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-11-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the development of soil in the excavation with the foundation structure during the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources2 Availability of a construction permit 3 Compliance with the requirements hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741903966078
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-11-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of masonry on the 2nd floor during the execution of work with the installation of staircases and platforms on the 2nd floor during the execution of work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account changes included in the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements of equipment of the capital construction facility with devices accounting for the energy resources used2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741903965779
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-11-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on roofing after completion of work to the device of door and window openings on the 1st and 2nd floors after completion of work to the installation of floors on the 3rd floor finishing work on the 3rd floor internal electrical work on the 3rd floor internal plumbing work on heating water supply sewerage on the 3rd floor landscaping after completion of work compliance with fire and sanitary epidemiological measures to ensure access for low-mobility groups of the population and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with hh 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with hh 38 and 39 st49 of this Code and or the information model in if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741903842930
Unscheduled inspection
Start date: 2019-10-28, end date: 2019-11-01, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of masonry on the 2nd floor after completion of work, installation of staircases and platforms on the 2nd floor after completion of work, installation of floor slabs on the 2nd floor landscaping during the work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of the article 48 of this Code of project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements are not They also apply to the requirements of equipping a capital construction facility with metering devices for used energy resources2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741903842924
Unscheduled inspection
Start date: 2019-10-28, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741903666140
Unscheduled inspection
Start date: 2019-10-03, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741903665283
Unscheduled inspection
Start date: 2019-10-03, end date: —, duration:
Authority:
Purpose of inspection:


# 741903523362
Unscheduled inspection
Start date: 2019-09-25, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741903525003
Unscheduled inspection
Start date: 2019-09-25, end date: 2019-10-01, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of masonry on the 3rd floor after completion of the work with the installation of staircases and platforms on the 3rd floor after completion of the work with the installation of floor slabs on the 3rd floor after completion of the work with the installation of floors on the 2nd floor during the work with finishing works on the 2nd floor during the work with internal electrical work on the 2nd floor during the work with internal plumbing work on heating, water supply, sewerage of the 2nd floor in the process of work, the device of door and window openings on the first floor, the roof in the process of work, landscaping in the process of work and building materials used in the construction of a capital construction facility, as well as the results of such work, project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741903014425
Unscheduled inspection
Start date: 2019-09-05, end date: 2019-09-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of masonry on the 2nd floor during the work with the installation of staircases and platforms on the 2nd floor during the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with design documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741903014389
Unscheduled inspection
Start date: 2019-09-05, end date: —, duration:
Authority:
Purpose of inspection:


# 741903014378
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-09-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the masonry walls of the 5th floor after completion of the installation of staircases and platforms of the 5th floor installation of floor slabs of the 5th floor roofing work during the work installation of PVC window and balcony blocks of 15 floors installation of wooden door blocks of entrances and apartments of 12 floors during the work finishing work on 4 installation of floors on 13 floors after completion of work, installation of an internal water supply and sanitation system on 34 floors, electrical installation work on the 4th floor, landscaping of the adjacent territory during the execution of works and construction materials used during the construction of a capital construction facility, as well as the results of such work, project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation


# 741902900360
Unscheduled inspection
Start date: 2019-08-12, end date: 2019-08-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of masonry on the 3rd floor during the execution of work with the installation of staircases and platforms on the 3rd floor during the execution of work with internal plumbing works on heating water supply sewerage of the 1st floor after completion of work with finishing works on the 1st floor after completion of work with the installation of floors of the 1st floor during the execution of work with internal plumbing works on heating water supply sewerage of the 2nd floor finishing works of the 2nd floor in the course of work and the construction materials used in the construction of the capital construction facility as well as the results of such work project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902900325
Unscheduled inspection
Start date: 2019-08-12, end date: 2019-08-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the masonry of the 1st floor after completion of the work with the installation of staircases and platforms of the 1st floor after completion of the work with the masonry of the 2nd floor during the work with the installation of staircases and platforms of the 2nd floor during the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with design documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902851912
Unscheduled inspection
Start date: 2019-07-17, end date: —, duration:
Authority:
Purpose of inspection:


# 741902819651
Unscheduled inspection
Start date: 2019-07-01, end date: —, duration:
Authority:
Purpose of inspection:


# 741902819565
Unscheduled inspection
Start date: 2019-07-01, end date: —, duration:
Authority:
Purpose of inspection:


# 741902873881
Unscheduled inspection
Start date: 2019-07-24, end date: 2019-07-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of masonry walls of the 4th floor after completion of the installation of staircases and platforms of the 4th floor installation of floor slabs of the 4th floor finishing work on the 3rd floor installation of floors on 12 floors during the work installation of an internal heating and ventilation system on the 3rd floor installation of an internal water supply and sanitation system on 12 floors after completion electrical installation works on the 3rd floor of the masonry walls of the 5th floor in the course of work and the construction materials used during the construction of the capital construction facility as well as the results of such work project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902885109
Unscheduled inspection
Start date: 2019-07-29, end date: 2019-08-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of masonry on the 2nd floor after completion of work with the installation of staircases and platforms on the 2nd floor after completion of work with the installation of floor slabs on the 2nd floor after completion of work with internal electrical work on the 2nd floor internal plumbing work on heating water supply sewerage of the 1st floor during the execution of work finishing work on the 1st floor during the execution of work to the device of masonry 3 floors in the process of work and construction materials used in the construction of a capital construction facility as well as the results of such work project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902785480
Unscheduled inspection
Start date: 2019-06-18, end date: 2019-06-24, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the foundation after completion of the work with the installation of floor slabs and underground masonry of the 1st floor during the work, installation of staircases and platforms of the 1st floor during the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31st st52 of the Urban Planning Code of the Russian Federation


# 741902785470
Unscheduled inspection
Start date: 2019-06-18, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741902785535
Unscheduled inspection
Start date: 2019-06-28, end date: —, duration:
Authority:
Purpose of inspection:


# 741902663193
Unscheduled inspection
Start date: 2019-05-13, end date: 2019-05-17, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The correspondence of the work performed on the foundation after completion of the work to the installation of floor slabs of the technical underground after completion of the work to the installation of masonry walls of the 1st floor to the installation of floor slabs of the 1st floor to the installation of staircases and platforms of the 1st floor to the installation of masonry walls of the 2nd floor during the work installation of floor slabs of the 2nd floor during the work installation of staircases and platforms on the 2nd floor in the process of performing works and building materials used in the construction of a capital construction facility as well as the results of such work project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902663216
Unscheduled inspection
Start date: 2019-05-13, end date: 2019-05-17, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the masonry walls of the 3rd floor after completion of the work with the installation of staircases and platforms of the 3rd floor after completion of the work with the installation of floor slabs of the 3rd floor after completion of the work with the masonry walls of the 4th floor during the work finishing works on 12 floors the device of the internal heating and ventilation system on 12 floors the device of the internal water supply system and drainage on 12 floors electrical work on 12 floors in the process of performing works and building materials used during the construction of a capital construction facility as well as the results of such work project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902720338
Unscheduled inspection
Start date: 2019-05-27, end date: 2019-05-31, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the development of soil in the excavation with the foundation installation installation of floor slabs and underground installation of masonry on the 1st floor during the work installation of staircases and platforms on the 1st floor during the work installation of floor slabs on the 1st floor and building materials used during the construction of a capital construction facility as well as the results of such work with design documentation2 Availability of a permit on construction3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902719617
Unscheduled inspection
Start date: 2019-05-27, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741902560546
Unscheduled inspection
Start date: 2019-03-13, end date: —, duration:
Authority:
Purpose of inspection:


# 741902583439
Unscheduled inspection
Start date: 2019-03-25, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741902490112
Unscheduled inspection
Start date: 2019-02-11, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741902490159
Unscheduled inspection
Start date: 2019-02-11, end date: —, duration:
Authority:
Purpose of inspection:


# 741902524882
Unscheduled inspection
Start date: 2019-02-26, end date: —, duration:
Authority:
Purpose of inspection:


# 741902460008
Unscheduled inspection
Start date: 2019-01-28, end date: —, duration:
Authority:
Purpose of inspection:


# 741902455505
Unscheduled inspection
Start date: 2019-01-28, end date: —, duration:
Authority:
Purpose of inspection:


# 741802310236
Unscheduled inspection
Start date: 2018-12-24, end date: 2018-12-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of staircases and platforms of the 1st floor with the masonry walls of the 1st floor after completion of the work with the masonry walls of the 2nd floor during the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2The presence of a construction permit 3Fulfilling the requirements of hh 23 and 31 st52 The Urban Planning Code of the Russian Federation


# 741802310187
Unscheduled inspection
Start date: 2018-12-24, end date: 2018-12-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the foundation after the completion of the installation of floor slabs of the technical underground during the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation 2The presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802282196
Unscheduled inspection
Start date: 2018-12-12, end date: 2019-01-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction of the facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802131454
Unscheduled inspection
Start date: 2018-11-26, end date: 2018-11-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on compliance with fire-fighting and sanitary and epidemiological measures to ensure access for low-mobility groups of the population and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 The presence of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802131363
Unscheduled inspection
Start date: 2018-11-26, end date: —, duration:
Authority:
Purpose of inspection:


# 741802131313
Unscheduled inspection
Start date: 2018-11-26, end date: —, duration:
Authority:
Purpose of inspection:


# 741802008405
Unscheduled inspection
Start date: 2018-10-29, end date: 2018-11-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the works on landscaping after the actual completion of the work and the construction materials used in the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 The presence of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802008176
Unscheduled inspection
Start date: 2018-10-30, end date: 2018-11-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the masonry work on the walls of the 1st floor in the course of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 The presence of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802008126
Unscheduled inspection
Start date: 2018-10-30, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741801634918
Unscheduled inspection
Start date: 2018-09-26, end date: 2018-10-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of finishing works in the second entrance during the execution of work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2The presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741801634736
Unscheduled inspection
Start date: 2018-09-27, end date: 2018-10-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the development of soil in the pit with the foundation during the work, the installation of floor slabs during the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2The presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741801630766
Unscheduled inspection
Start date: 2018-09-27, end date: 2018-10-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the development of soil in the excavation foundation installation of floor slabs and building materials used in the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2The presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800670054
Unscheduled inspection
Start date: 2018-08-29, end date: 2018-09-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of finishing works in the first entrance during the execution of works and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2The presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800511612
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-07-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of finishing works in the course of work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 The presence of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800471102
Unscheduled inspection
Start date: 2018-06-13, end date: 2018-06-19, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of internal power supply systems, water supply and sanitation after the actual completion of work to the device of finishing works during the execution of work, the installation of floors after the actual completion of work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2The presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation


# 741800449960
Unscheduled inspection
Start date: 2018-06-13, end date: 2018-06-19, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of internal power supply systems, water supply and sanitation after the actual completion of work to the device of finishing works during the execution of work, the installation of floors after the actual completion of work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2The presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation


# 741800363886
Unscheduled inspection
Start date: 2018-05-15, end date: 2018-05-21, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of internal power supply systems, water supply and sanitation in the course of work, the arrangement of finishing works in the course of work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 The presence of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800377896
Unscheduled inspection
Start date: 2018-05-29, end date: 2018-06-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of internal power supply systems, water supply and sanitation during the execution of works to the device of finishing works during the execution of works to the roof device after the actual completion of work to the device of door blocks after the actual completion of work to the installation of window and balcony blocks made of PVC after the actual completion of work and the construction materials used during the construction of the capital construction facility as well as the results of such works according to the requirements of the technical regulations of the project documentation 2The presence of a construction permit 3The fulfillment of the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800252166
Unscheduled inspection
Start date: 2018-04-09, end date: 2018-04-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of PVC window and balcony blocks in the course of work with the installation of floors during construction, installation of an internal heating and ventilation system during work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800306723
Unscheduled inspection
Start date: 2018-04-24, end date: 2018-04-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of the internal heating and ventilation system after the actual completion of the work with the device of finishing works during the execution of works and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2The presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800201744
Unscheduled inspection
Start date: 2018-03-26, end date: 2018-03-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on masonry walls of the 5th floor and installation of prefabricated reinforced concrete structures of the 5th floor lintels of floor slabs of staircases and platforms in the course of work with Masonry walls of the 5th floor and installation of prefabricated reinforced concrete structures of the 5th floor lintels of floor slabs of staircases and platforms after the actual completion of work and the construction materials used during the construction of the capital facility construction as well as the results of such work to the requirements of the technical regulations of the project documentation 2The presence of a construction permit 3The fulfillment of the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800075534
Unscheduled inspection
Start date: 2018-02-21, end date: 2018-02-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on masonry walls of the 4th floor and installation of prefabricated reinforced concrete structures of the 4th floor lintels of floor slabs of staircases and platforms in the course of work Masonry walls of the 4th floor and installation of prefabricated reinforced concrete structures of the 4th floor lintels of floor slabs of staircases and platforms after the actual completion of work Masonry walls of the 5th floor and installation of prefabricated reinforced concrete structures 5 floors of lintels, floor slabs, staircases and platforms in the course of work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, requirements of technical regulations of project documentation 2 The presence of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800003145
Unscheduled inspection
Start date: 2018-01-23, end date: —, duration:
Authority:
Purpose of inspection:


# 74170802914055
Unscheduled inspection
Start date: 2017-12-04, end date: —, duration:
Authority:
Purpose of inspection:


# 74170802913995
Unscheduled inspection
Start date: 2017-12-04, end date: 2017-12-08, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Installation of floors after the actual completion of work Installation of internal power supply systems of water supply and sanitation after the actual completion of work Completion of finishing works after the actual completion of work Observance of fire-fighting and sanitary epidemiological measures to ensure access for low-mobility groups of the population 2 Availability of construction permits 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802992716
Unscheduled inspection
Start date: 2017-12-19, end date: 2018-01-23, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802802654
Unscheduled inspection
Start date: 2017-11-09, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74170802802503
Unscheduled inspection
Start date: 2017-11-09, end date: 2017-11-15, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work Installation of internal power supply systems, water supply and sanitation in the process of work Installation of internal heating systems after the actual completion of work Roof installation after the actual completion of work Installation of window and balcony blocks made of PVC after the actual completion of work and the construction materials used during the construction of the capital construction facility as well as the results of such work to the requirements of technical regulations of project documentation 2The presence of a construction permit 3fulfilling requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802673698
Unscheduled inspection
Start date: 2017-10-06, end date: 2017-10-12, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work masonry walls of the 5th floor and installation of precast reinforced concrete structures of the 5th floor lintels slabs of staircases and platforms after the actual completion of work installation of door blocks during the work installation of window and balcony blocks made of PVC during the work and the construction materials used during the construction of the capital construction facility as well as the results of such work requirements technical regulations of the project documentation 2 Availability of a construction permit 3 Fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802673806
Unscheduled inspection
Start date: 2017-10-06, end date: —, duration:
Authority:
Purpose of inspection:


# 74170802109069
Unscheduled inspection
Start date: 2017-09-11, end date: 2017-09-15, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work masonry walls of the 2nd floor installation of prefabricated reinforced concrete structures of the 2nd floor lintels of floor slabs of staircases and platforms after the actual completion of work before the start of masonry walls of the 3rd floor landscaping during the work and the construction materials used during the construction of the capital construction facility as well as the results of such work to the requirements of technical regulations design documentation 2 Availability building permits 3Compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802106300
Unscheduled inspection
Start date: 2017-09-11, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74170802515382
Unscheduled inspection
Start date: 2017-09-22, end date: 2017-09-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work masonry walls of the 5th floor and installation of prefabricated reinforced concrete structures of the 5th floor intersections of floor slabs of staircases and platforms during the production of work installation of an electrical panel together with distributing devices and building materials used during the construction of a capital construction facility as well as the results of such work to the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802515507
Unscheduled inspection
Start date: 2017-09-22, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701871299
Unscheduled inspection
Start date: 2017-08-11, end date: 2017-08-17, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of the internal electricity supply system during the execution of works and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170701871200
Unscheduled inspection
Start date: 2017-08-11, end date: 2017-08-17, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the masonry work on the walls of the 4th floor and the installation of prefabricated reinforced concrete structures of the 4th floor lintels of floor slabs of staircases and platforms during the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning the Code of the Russian Federation


# 74170801920640
Unscheduled inspection
Start date: 2017-08-25, end date: 2017-08-31, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the masonry walls of the 2nd floor in the course of work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170801919259
Unscheduled inspection
Start date: 2017-08-25, end date: 2017-08-31, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of an internal power supply system during the execution of work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170701788701
Unscheduled inspection
Start date: 2017-07-14, end date: 2017-07-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701756043
Unscheduled inspection
Start date: 2017-07-12, end date: 2017-07-18, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work Masonry walls of the 3rd floor and installation of prefabricated reinforced concrete structures of the 3rd floor lintels of floor slabs of staircases and platforms after the actual completion of work before the start of masonry walls of the 4th floor installation of the internal heating system of the basement during the work and the building materials used during the construction of the capital construction facility as well as the results of such work to the requirements of technical regulations project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701756092
Unscheduled inspection
Start date: 2017-07-12, end date: 2017-07-18, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work Masonry walls of the 1st floor and the installation of prefabricated reinforced concrete structures of the 1st floor lintels slabs of staircases and platforms after the actual completion of work before the masonry walls of the 2nd floor and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 The availability of a construction permit 3 Compliance with the requirements hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701799031
Unscheduled inspection
Start date: 2017-07-26, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74170701798959
Unscheduled inspection
Start date: 2017-07-26, end date: 2017-08-01, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the installation of an internal heating ventilation system of an individual heat node in the course of work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701681795
Unscheduled inspection
Start date: 2017-06-08, end date: 2017-06-15, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of internal power supply systems, water supply, heating, sanitation after the actual completion of work, finishing works and construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701681853
Unscheduled inspection
Start date: 2017-06-08, end date: 2017-06-15, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of foundation blocks and floor slabs of the technical underground after the actual completion of work before the masonry of the walls of the 1st floor and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701681739
Unscheduled inspection
Start date: 2017-06-08, end date: 2017-06-15, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on masonry walls of the 1st floor and on the installation of prefabricated reinforced concrete structures of the 1st floor lintels of floor slabs of staircases and platforms after the actual completion of the work before the masonry walls of the 2nd floor and the building materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701697945
Unscheduled inspection
Start date: 2017-06-23, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701698164
Unscheduled inspection
Start date: 2017-06-20, end date: 2017-06-26, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work Masonry walls of the 1st floor installation of prefabricated reinforced concrete structures of the 1st floor lintels of floor slabs of staircases and platforms during the work before the masonry walls of the 2nd floor installation of the internal heating system of the basement during the work and the building materials used during the construction of the capital construction facility as well as the results of such work to the requirements of technical regulations of the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701698309
Unscheduled inspection
Start date: 2017-06-20, end date: 2017-06-26, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work with the installation of external water supply and sewerage networks after the actual completion of the work masonry walls of the 3rd floor and installation of prefabricated reinforced concrete structures of the 3rd floor during the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 st52 Urban Planning the Code of the Russian Federation


# 74170701572268
Unscheduled inspection
Start date: 2017-05-02, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74170701624551
Unscheduled inspection
Start date: 2017-05-22, end date: 2017-05-26, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the foundation pit and foundation and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701624288
Unscheduled inspection
Start date: 2017-05-22, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74170701440503
Unscheduled inspection
Start date: 2017-03-15, end date: 2017-03-21, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of works on the installation of window blocks and building materials used in the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701380559
Unscheduled inspection
Start date: 2017-02-20, end date: 2017-02-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the masonry walls of the 5th floor installation of prefabricated reinforced concrete structures of the 5th floor lintels floor slabs staircases and platforms and the construction materials used in the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2The presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701222040
Unscheduled inspection
Start date: 2016-12-12, end date: 2016-12-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of external power supply systems installation of window blocks installation of internal power supply systems water supply drainage installation of internal heating and ventilation system installation of door blocks finishing work installation of floors of the roof after the actual completion of work compliance with fire and sanitary epidemiological measures to ensure access for low-mobility groups of the territory landscaping after the actual completion of work and applied building materials during construction the object of capital construction as well as the results of such work to the requirements of technical regulations of project documentation 2The presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701272282
Unscheduled inspection
Start date: 2016-12-28, end date: —, duration:
Authority:
Purpose of inspection:


# 74160701182629
Unscheduled inspection
Start date: 2016-12-01, end date: 2016-12-07, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the masonry walls of the 5th floor installation of prefabricated reinforced concrete structures of the 5th floor lintels floor slabs staircases and platforms and the construction materials used in the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2The presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701031208
Unscheduled inspection
Start date: 2016-10-21, end date: 2016-10-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the masonry walls of the 4th floor installation of prefabricated reinforced concrete structures of the 4th floor lintels floor slabs staircases and platforms and the construction materials used in the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2The presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701031271
Unscheduled inspection
Start date: 2016-10-21, end date: —, duration:
Authority:
Purpose of inspection:


# 74160601724737
Unscheduled inspection
Start date: 2016-07-22, end date: 2016-07-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the masonry walls of the 3rd floor before the installation of prefabricated reinforced concrete structures of the 3rd floor and the building materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160601724697
Unscheduled inspection
Start date: 2016-07-22, end date: 2016-07-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the masonry walls of the 3rd floor before the installation of prefabricated reinforced concrete structures of the 3rd floor and the building materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2The presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160601724806
Unscheduled inspection
Start date: 2016-07-29, end date: —, duration:
Authority:
Purpose of inspection:


# 74160601724767
Unscheduled inspection
Start date: 2016-07-29, end date: 2016-08-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of work on the installation of prefabricated reinforced concrete structures on the 3rd floor of lintels, floor slabs, staircases and platforms before the installation of masonry walls on the 4th floor with the installation of external water supply and sanitation systems after the actual completion of work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2The presence of a construction permit 3The fulfillment of the requirements of the hh 23 st52 of the Urban Planning Code of the Russian Federation


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.