Found 38 inspections:

# 001903991994
Unscheduled inspection
Start date: 2019-11-13, end date: 2019-12-12, duration:
Authority: Federalnaya antimonopolnaya sluzhba
Purpose of inspection: monitoring compliance with antimonopoly legislation


# 00170802841646
Unscheduled inspection
Start date: 2017-10-23, end date: 2017-11-03, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is carried out for the purpose of monitoring the execution of the order dated August 24, 2017 323477the objectives of this audit are to monitor the measures taken by a legal entity, an individual entrepreneur, to comply with the order, to take measures to eliminate violations of mandatory requirements if they are identified and to hold accountable persons who did not ensure the execution of the order. The subject of this audit is the fulfillment of the order of the state control supervision bodies


# 772100596141
Unscheduled inspection
Start date: 2021-09-03, end date: 2021-09-30, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100417050
Unscheduled inspection
Start date: 2021-08-05, end date: 2021-08-31, duration: 19
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772100246849
Unscheduled inspection
Start date: 2021-06-02, end date: —, duration:
Authority:
Purpose of inspection:


# 001903991994
Unscheduled inspection
Start date: 2019-11-13, end date: 2019-12-12, duration:
Authority: Federalnaya antimonopolnaya sluzhba
Purpose of inspection: monitoring compliance with antimonopoly legislation


# 77190803394400
Unscheduled inspection
Start date: 2019-04-11, end date: 2019-04-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803338593
Unscheduled inspection
Start date: 2019-02-18, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803245409
Unscheduled inspection
Start date: 2018-10-05, end date: 2018-10-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803182443
Unscheduled inspection
Start date: 2018-07-17, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803187110
Unscheduled inspection
Start date: 2018-07-26, end date: 2018-08-10, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803185097
Unscheduled inspection
Start date: 2018-07-23, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803169426
Unscheduled inspection
Start date: 2018-06-27, end date: 2018-07-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803158591
Unscheduled inspection
Start date: 2018-06-08, end date: 2018-06-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803147350
Unscheduled inspection
Start date: 2018-05-25, end date: 2018-05-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803115508
Unscheduled inspection
Start date: 2018-04-09, end date: 2018-04-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803117147
Unscheduled inspection
Start date: 2018-04-23, end date: 2018-05-11, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803087690
Unscheduled inspection
Start date: 2018-02-19, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802941230
Unscheduled inspection
Start date: 2017-12-14, end date: 2017-12-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802958295
Unscheduled inspection
Start date: 2017-12-12, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 00170802841646
Unscheduled inspection
Start date: 2017-10-23, end date: 2017-11-03, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is carried out for the purpose of monitoring the execution of the order dated August 24, 2017 323477the objectives of this audit are to monitor the measures taken by a legal entity, an individual entrepreneur, to comply with the order, to take measures to eliminate violations of mandatory requirements if they are identified and to hold accountable persons who did not ensure the execution of the order. The subject of this audit is the fulfillment of the order of the state control supervision bodies


# 77170802721523
Unscheduled inspection
Start date: 2017-10-12, end date: 2017-10-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802039692
Unscheduled inspection
Start date: 2017-09-06, end date: 2017-09-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 00170801947071
Unscheduled inspection
Start date: 2017-08-16, end date: 2017-08-24, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to comply with Rostechnadzor Order No. 85 dated March 15, 2017 "On inspections of organizations operating tower cranes" on the basis of instructions from Deputy Prime Minister of the Russian Federation AG Khloponin dated February 8, 2017 AHP9682 "On the organization and conduct of unscheduled inspections of organizations operating tower cranes from 2017 to 2019" The objectives of this inspection are to prevent identification and suppression of violations of mandatory requirements established by federal laws and other regulatory acts of the Russian Federation in the field of industrial safety and technical regulation of mandatory requirements, taking measures to eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have violated the requirements of federal laws and other regulatory legal acts, the subject of this audit is compliance by a legal entity in the process of implementation activities of mandatory industrial safety requirements in the design construction operation conservation and liquidation of hazardous production facilities manufacture installation commissioning maintenance and repair of technical devices of lifting cranes used at hazardous production facilities compliance with the specified requirements of buildings premises structures equipment and materials used as well as requirements for machinery and equipment and related requirements for these products of operation and disposal processes


# 77170701873915
Unscheduled inspection
Start date: 2017-08-09, end date: 2017-09-05, duration:
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: Protection of the rights and interests of employees in connection with the receipt of an employee's appeal to the Inspectorate dated 24072017 73008617OB


# 77170701739757
Unscheduled inspection
Start date: 2017-07-25, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701637029
Unscheduled inspection
Start date: 2017-05-17, end date: 2017-05-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701521724
Unscheduled inspection
Start date: 2017-04-18, end date: 2017-04-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701413727
Unscheduled inspection
Start date: 2017-02-28, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77170701298997
Unscheduled inspection
Start date: 2017-01-16, end date: 2017-02-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701315295
Unscheduled inspection
Start date: 2017-01-24, end date: 2017-01-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77160701199362
Unscheduled inspection
Start date: 2016-12-15, end date: 2016-12-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77160701199381
Unscheduled inspection
Start date: 2016-12-02, end date: 2016-12-12, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77160701112956
Unscheduled inspection
Start date: 2016-11-14, end date: 2016-11-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the inspection is carried out in order to eliminate violations specified in the order issued by Mosgosstroynadzor on the basis of the expiration of the deadline for the execution by a legal entity, an individual entrepreneur, of an order issued by the state construction supervision authority to eliminate an identified violation of mandatory requirements. The objectives of this inspection are to prevent, identify and suppress violations of technical regulations and project documentation committed by the person being audited. The subject of this inspection is to verify the elimination of violations specified in the order issued by Mosgosstroynadzor 1113116 from 13102016


# 77160701015042
Unscheduled inspection
Start date: 2016-10-13, end date: 2016-10-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used


# 77160700996725
Unscheduled inspection
Start date: 2016-10-14, end date: 2016-10-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the inspection is carried out in order to eliminate violations specified in the instruction issued by Mosgosstroynadzor on the basis of the expiration of the deadline for the execution by a legal entity, an individual entrepreneur, of an instruction issued by the state construction supervision authority to eliminate an identified violation of mandatory requirements. The objectives of this inspection are to prevent, identify and suppress violations of technical regulations and project documentation committed by the person being audited. The subject of this inspection is to verify the elimination of violations specified in the instruction issued by Mosgosstroynadzor 943216 from 13092016


# 77160700120172
Unscheduled inspection
Start date: 2016-09-05, end date: 2016-09-12, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used


# 77160601737920
Unscheduled inspection
Start date: 2016-07-25, end date: 2016-08-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.