# 242101339995
Unscheduled inspection
Start date: 2021-11-11, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out for the purpose of: carrying out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notice (No. 232 dated 11/10/2021) on the completion of the construction of the capital construction facility;
The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development activities, including project documentation.
7. The subject of this audit is compliance with:
7.1. Compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation);
7.2. Building permit requirements;
7.3. Requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation;
7.4. Requirements to the construction control procedure established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.
# 242101178819
Unscheduled inspection
Start date: 2021-10-08, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out for the purpose of: carrying out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notice (No. 169 dated 01.10.2021) on the completion of the construction of the capital construction facility;
The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation.
7. The subject of this audit is compliance with:
7.1. Compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation);
7.2. Building permit requirements;
7.3. Requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation;
7.4. Requirements to the construction control procedure established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.
# 242100576039
Unscheduled inspection
Start date: 2021-09-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 242004405721
Unscheduled inspection
Start date: 2020-05-13, end date: 2020-06-09, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 55 dated 29042020 on the completion of the construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development activities, including project documentation
# 242004405716
Unscheduled inspection
Start date: 2020-05-13, end date: 2020-06-09, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification No. 54 dated 29042020 on the completion of the construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development activities, including project documentation
# 242004383531
Unscheduled inspection
Start date: 2020-04-01, end date: 2020-04-28, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 15122014 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including design Documentation
# 242004238649
Unscheduled inspection
Start date: 2020-01-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 242004238676
Unscheduled inspection
Start date: 2020-01-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 241903868449
Unscheduled inspection
Start date: 2019-11-01, end date: 2019-11-15, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 30082019 2264/2001 previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 31/102019the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period
# 241904001541
Unscheduled inspection
Start date: 2019-11-26, end date: 2019-12-23, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 262 dated 18112019 on the completion of the construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation
# 241903919877
Unscheduled inspection
Start date: 2019-11-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 241903630943
Unscheduled inspection
Start date: 2019-10-04, end date: 2019-10-31, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 04062013 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation
# 241903847580
Unscheduled inspection
Start date: 2019-10-17, end date: 2019-11-14, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: the purpose of state control and supervision in the field of shared-equity construction of apartment buildings and or other real estate objects based on the identification during the analysis of the developer's quarterly reports on activities related to attracting funds from participants in shared-equity construction for the construction of apartment buildings and or other real estate objects of signs of violation of mandatory requirements motivated submission based on the results of a preliminary audit dated 01102019 299 tasks prevention detection and suppression of violations of the requirements of legislation in the field of shared-equity construction of apartment buildings and or other real estate objects subject to compliance with mandatory requirements and or requirements established by municipal legal acts
# 24190803485262
Unscheduled inspection
Start date: 2019-09-02, end date: 2019-09-27, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the deadline for completion of work that is subject to verification in accordance with the approved program of 04062013 inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction
# 24190803468653
Unscheduled inspection
Start date: 2019-08-05, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 24190803453176
Unscheduled inspection
Start date: 2019-07-05, end date: 2019-07-18, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being checked regulation 1624/2003 dated 21062019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 04072019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision
# 24190803449373
Unscheduled inspection
Start date: 2019-07-03, end date: 2019-07-16, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued regulation 1624/2003 dated 21062019 on the elimination of identified violations at the specified capital construction facility in connection with the received notification 33 dated 26062019 on the elimination of violations before the expiration of the period specified in the regulation of the audit task to establish the fact of elimination of previously identified violations to verify the actual work performed in accordance with the prescribed measures The subject of the audit is the fulfillment of the lawful order of the body carrying out Regional State construction supervision
# 24190803424719
Unscheduled inspection
Start date: 2019-05-31, end date: 2019-06-14, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being audited Regulation No. 938OZHS of 19042019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 30052019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision
# 241902733062
Unscheduled inspection
Start date: 2019-05-20, end date: 2019-06-17, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out state control and supervision in the field of shared-equity construction of apartment buildings and or other real estate objects based on the results of a preliminary audit on the failure to eliminate violations specified in the regulation dated 28032019 60DS within the prescribed time frame reasoned submission dated 13052019 115 the objectives of this audit are to establish the elimination of previously identified violations and verify the work actually performed in accordance with the prescribed measures taken within the time limit prescribed by the prescription7 The subject of this audit is the fulfillment of the instructions of the state control and supervision bodies
# 24190803420941
Unscheduled inspection
Start date: 2019-05-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24190803417404
Unscheduled inspection
Start date: 2019-05-24, end date: 2019-06-06, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being checked regulation No. 1086EN dated 30042019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 23052019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the work actually performed in accordance with the prescribed measures within the time period established by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision
# 24190803403761
Unscheduled inspection
Start date: 2019-04-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24190803377930
Unscheduled inspection
Start date: 2019-04-03, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 24190803391926
Unscheduled inspection
Start date: 2019-04-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24190803391925
Unscheduled inspection
Start date: 2019-04-09, end date: 2019-05-13, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the inspection is to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification No. 20 dated 01042019 on the completion dates of works subject to inspection during the construction of the capital construction facility. The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation. The subject of the inspection is to verify the compliance of the work performed and the construction materials used materials during the construction of the capital construction facility, as well as the results of such work, requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources, compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, verification of the availability of a construction permit
# 241902570102
Unscheduled inspection
Start date: 2019-03-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 241902570134
Unscheduled inspection
Start date: 2019-03-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 241902467834
Unscheduled inspection
Start date: 2019-02-01, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 241902447241
Unscheduled inspection
Start date: 2019-01-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 241902447076
Unscheduled inspection
Start date: 2019-01-25, end date: 2019-02-07, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited order No. 12112018 4475OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 24.012019. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision
# 241802178508
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-28, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 15122014 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of the compliance of the work performed and the construction materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit
# 241802030602
Unscheduled inspection
Start date: 2018-11-02, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 241801992527
Unscheduled inspection
Start date: 2018-10-26, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 241801992499
Unscheduled inspection
Start date: 2018-10-26, end date: 2018-11-09, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction issued earlier to the person being checked from 20082018 2987OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 25/102018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision
# 241802021226
Unscheduled inspection
Start date: 2018-10-30, end date: 2018-11-27, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 203 dated 22102018 on the completion of construction of the capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation. 7 The subject of this audit is 71 Verification of compliance with the works and construction materials used during the construction of a capital construction facility, as well as the results of such work, meet the requirements of project documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used, all acts regulations notices on the elimination of violations deficiencies identified during implementation of regional state construction supervision 72 Compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Verification of the availability of a building permit
# 241801917717
Unscheduled inspection
Start date: 2018-10-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 241801917711
Unscheduled inspection
Start date: 2018-10-11, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 241801644687
Unscheduled inspection
Start date: 2018-09-19, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 241801359064
Unscheduled inspection
Start date: 2018-09-21, end date: 2018-10-04, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 20082018 2909OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires in 20092018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision
# 241800586920
Unscheduled inspection
Start date: 2018-08-03, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 241800586180
Unscheduled inspection
Start date: 2018-08-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 241800583368
Unscheduled inspection
Start date: 2018-08-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 241800582422
Unscheduled inspection
Start date: 2018-07-06, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 241800507031
Unscheduled inspection
Start date: 2018-07-06, end date: 2018-06-19, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 20032018 760OZHS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 05072018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision
# 241800507166
Unscheduled inspection
Start date: 2018-07-06, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 241800507019
Unscheduled inspection
Start date: 2018-07-06, end date: 2018-07-19, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 20032018 759OZHS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 05072018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision
# 241800507011
Unscheduled inspection
Start date: 2018-07-06, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 241800507004
Unscheduled inspection
Start date: 2018-07-06, end date: 2018-07-19, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction issued earlier to the person being checked from 16032018 495OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 05072018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision
# 241800506992
Unscheduled inspection
Start date: 2018-07-06, end date: 2018-07-19, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the instruction issued earlier to the person being checked from 16032018 496OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 05072018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision
# 241800507198
Unscheduled inspection
Start date: 2018-07-06, end date: 2018-07-19, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction issued earlier to the person being checked from 22052018 1569OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 05072018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision
# 241800424992
Unscheduled inspection
Start date: 2018-06-05, end date: 2018-07-03, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification No. 65 dated 28052018 on the completion dates of works subject to inspection during the construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation. 7 The subject of this inspection is 71 Checking the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used 72 Meeting the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking for a building permit
# 241800391927
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-06-29, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 17072015 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit
# 241800391962
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-06-29, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 17072015 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit
# 241800391944
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-06-29, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 17072015 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit
# 241800473221
Unscheduled inspection
Start date: 2018-06-25, end date: 2018-07-06, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction issued earlier to the person being checked from 22052018 1362SENiEK on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 22062018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision
# 241800329708
Unscheduled inspection
Start date: 2018-05-11, end date: 2018-05-24, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction issued earlier to the person being checked from 16032018 498OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 10052018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision
# 241800307357
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-31, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 04062013 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit
# 241800271625
Unscheduled inspection
Start date: 2018-04-20, end date: 2018-05-07, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 28022018 182OZHS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 19042018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision
# 241800305943
Unscheduled inspection
Start date: 2018-04-23, end date: 2018-05-23, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: implementation of regional state construction supervision during the construction of the specified capital construction facility based on the received notification 44 dated 16042018 on the completion dates of works subject to verification during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of compliance with works and construction materials used during the construction of a capital construction facility, as well as the results of such work, requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with energy metering devices 72 Meeting the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a construction permit
# 241800195109
Unscheduled inspection
Start date: 2018-03-16, end date: 2018-03-29, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked dated 01022018 98OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 15032018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision
# 241800193107
Unscheduled inspection
Start date: 2018-03-16, end date: 2018-03-29, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 01022018 90OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 15032018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision
# 241800193072
Unscheduled inspection
Start date: 2018-03-16, end date: 2018-03-29, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction issued earlier to the person being checked from 01022018 84OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 15032018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period
# 241800090552
Unscheduled inspection
Start date: 2018-03-01, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 241800087003
Unscheduled inspection
Start date: 2018-03-02, end date: 2018-03-19, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: establishment of the fact of elimination of previously identified violations verification of the work actually performed in accordance with the prescribed measures within the prescribed period
# 241800086992
Unscheduled inspection
Start date: 2018-03-02, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 241800086984
Unscheduled inspection
Start date: 2018-03-02, end date: 2018-03-19, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: establishment of the fact of elimination of previously identified violations verification of the work actually performed in accordance with the prescribed measures within the prescribed period
# 241800086979
Unscheduled inspection
Start date: 2018-03-02, end date: 2018-03-19, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: establishment of the fact of elimination of previously identified violations verification of the work actually performed in accordance with the prescribed measures within the prescribed period
# 241800083335
Unscheduled inspection
Start date: 2018-03-02, end date: 2018-03-19, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction dated 14122017 5329OZHS on the elimination of identified violations at the specified capital construction facility, which expires on 01032018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is the fulfillment of the instruction of the authority carrying out regional state construction supervision
# 241800083331
Unscheduled inspection
Start date: 2018-03-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 241800026249
Unscheduled inspection
Start date: 2018-02-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 241800011055
Unscheduled inspection
Start date: 2018-01-26, end date: 2018-02-08, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: establishment of the fact of elimination of previously identified violations verification of the work actually performed in accordance with the prescribed measures within the prescribed period
# 241800010904
Unscheduled inspection
Start date: 2018-01-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 241800010749
Unscheduled inspection
Start date: 2018-01-26, end date: 2018-02-08, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: establishment of the fact of elimination of previously identified violations verification of the work actually performed in accordance with the prescribed measures within the prescribed period
# 24170802927062
Unscheduled inspection
Start date: 2017-12-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170802927048
Unscheduled inspection
Start date: 2017-12-08, end date: 2017-12-21, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked dated 05102017 4059OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 07122017. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision
# 24170802926756
Unscheduled inspection
Start date: 2017-12-08, end date: 2017-12-21, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited order No. 05102017 4058OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 07122017 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision
# 24170802926913
Unscheduled inspection
Start date: 2017-12-08, end date: 2017-12-21, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited order No. 05102017 4056OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 07122017 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision
# 24170802926805
Unscheduled inspection
Start date: 2017-12-08, end date: 2017-12-21, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked dated 05102017 4057OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 07122017. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision
# 24170802926885
Unscheduled inspection
Start date: 2017-12-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170802908638
Unscheduled inspection
Start date: 2017-12-04, end date: 2017-12-29, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 15122014 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit
# 24170802903306
Unscheduled inspection
Start date: 2017-12-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170802962849
Unscheduled inspection
Start date: 2017-12-12, end date: 2018-01-16, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction from 01122017 5224OZHS on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 05122017 vx 287 on the elimination of violations before the expiration of the period specified in the instruction. The purpose of this inspection is to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures. The purpose of the audit is to comply with the legal order of the body carrying out regional state construction supervision
# 24170802830541
Unscheduled inspection
Start date: 2017-11-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170802882337
Unscheduled inspection
Start date: 2017-11-22, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 24170802761737
Unscheduled inspection
Start date: 2017-11-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170802830755
Unscheduled inspection
Start date: 2017-11-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170802795889
Unscheduled inspection
Start date: 2017-11-10, end date: 2017-11-23, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the previously issued to the person being audited order No. 4391OZHS dated 18102017 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 09112017. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is to comply with the instructions of the body carrying out Regional State construction supervision
# 24170802646860
Unscheduled inspection
Start date: 2017-10-13, end date: 2017-10-26, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 06092017 3910OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 12102017. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision
# 24170802646849
Unscheduled inspection
Start date: 2017-10-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170801950199
Unscheduled inspection
Start date: 2017-09-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170801950134
Unscheduled inspection
Start date: 2017-09-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170802405072
Unscheduled inspection
Start date: 2017-09-22, end date: 2017-10-05, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 02082017 3056OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 21092017 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision
# 24170802402175
Unscheduled inspection
Start date: 2017-09-22, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 24170802401929
Unscheduled inspection
Start date: 2017-09-22, end date: 2017-10-05, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 02082017 3050OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 21092017 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision
# 24170802401763
Unscheduled inspection
Start date: 2017-09-22, end date: 2017-10-05, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 02082017 3048OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 21092017 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision
# 24170802399127
Unscheduled inspection
Start date: 2017-09-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170701832171
Unscheduled inspection
Start date: 2017-08-04, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 24170701776396
Unscheduled inspection
Start date: 2017-07-28, end date: 2017-08-10, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited instruction No. 17032017 787OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 27072017the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is the fulfillment of the instruction of the body carrying out Regional State construction supervision
# 24170701776388
Unscheduled inspection
Start date: 2017-07-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170701776348
Unscheduled inspection
Start date: 2017-07-28, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 24170701776463
Unscheduled inspection
Start date: 2017-07-28, end date: 2017-08-10, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the previously issued to the person being audited order No. 17032017 788OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 27072017 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is to comply with the instructions of the authority responsible for Regional State construction supervision
# 24170701776422
Unscheduled inspection
Start date: 2017-07-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170701776414
Unscheduled inspection
Start date: 2017-07-28, end date: 2017-08-10, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited instruction from 30052017 2128OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 27072017the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the body carrying out Regional State construction supervision
# 24170701776194
Unscheduled inspection
Start date: 2017-07-28, end date: 2017-08-10, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 07062017 786OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 27072017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision
# 24170701716957
Unscheduled inspection
Start date: 2017-07-04, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 24170701629995
Unscheduled inspection
Start date: 2017-06-01, end date: 2017-06-29, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 17072015 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this audit is71 Checking the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources 72 Checking the availability of a construction permit 73 Checking the availability of a certificate of admission to the types of works on the construction of a capital construction facility that have an impact on the safety of the capital construction facility
# 24170701630181
Unscheduled inspection
Start date: 2017-06-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170701417854
Unscheduled inspection
Start date: 2017-05-25, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 24170701622265
Unscheduled inspection
Start date: 2017-05-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170701617843
Unscheduled inspection
Start date: 2017-05-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170701617879
Unscheduled inspection
Start date: 2017-05-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170701540582
Unscheduled inspection
Start date: 2017-04-18, end date: 2017-05-18, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification dated 10042017 bx 53 on the completion dates of works subject to inspection during the construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation, and verify compliance with the work and construction materials used during the construction of the capital construction facility, as well as the results of such work, requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Verification of a construction permit, Verification of a certificate of admission to the types of work on the construction of the capital construction facility that have an impact on the safety of the capital construction facility
# 24170701535563
Unscheduled inspection
Start date: 2017-04-17, end date: 2017-05-17, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction from 04042017 790OZHS on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 10042017 bx 33 on the elimination of violations before the expiration of the period specified in the instruction. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the actual work performed in accordance with the prescribed measures. The purpose of this audit is to comply with the legal order of the body carrying out the regional state construction supervision, the deadline for which is about to expire
# 24170701567044
Unscheduled inspection
Start date: 2017-04-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170701417862
Unscheduled inspection
Start date: 2017-04-04, end date: 2017-04-17, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 04052016 786OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 03042017 The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period
# 24170701478123
Unscheduled inspection
Start date: 2017-04-03, end date: 2017-04-28, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 17072015 inspections during the construction of the capital construction facility The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and The subject of this audit is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Checking the availability of a certificate of admission to the types of work on the construction of the capital construction facility that have an impact on the safety of a capital construction facility
# 24170701478113
Unscheduled inspection
Start date: 2017-04-03, end date: 2017-04-28, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 17072015 inspections during the construction of the capital construction facility The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and The subject of this audit is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, and to verify the availability of a certificate of admission to the types of work on the construction of the capital construction facility that provide impact on the safety of a capital construction facility
# 24170701474827
Unscheduled inspection
Start date: 2017-04-03, end date: 2017-04-28, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 17072015 inspections during the construction of the capital construction facility The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and The subject of this audit is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, and to verify the availability of a certificate of admission to the types of work on the construction of the capital construction facility that provide impact on the safety of a capital construction facility
# 24170701417856
Unscheduled inspection
Start date: 2017-03-10, end date: 2017-03-23, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked order No. 05122016 2280OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 09032017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period
# 24170701412255
Unscheduled inspection
Start date: 2017-03-10, end date: 2017-03-23, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked dated 05122016 2279OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 09032017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out the regional State construction supervision
# 24170701412286
Unscheduled inspection
Start date: 2017-03-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170701388836
Unscheduled inspection
Start date: 2017-03-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170701460310
Unscheduled inspection
Start date: 2017-03-24, end date: 2017-04-06, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the previously issued to the person being audited order No. 27022017 420OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 23032017the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is to comply with the instructions of the body carrying out the regional State construction supervision
# 24170701477997
Unscheduled inspection
Start date: 2017-03-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170701469290
Unscheduled inspection
Start date: 2017-03-22, end date: 2017-04-18, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification dated 15032017 BX 31 on the completion dates of works subject to inspection during the construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentationthe subject of this inspection is to verify compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used Verification of the availability of a construction permit Verification of the availability of a certificate of admission to the types of work on the construction of the capital construction facility that provide impact on the safety of a capital construction facility
# 24170701469254
Unscheduled inspection
Start date: 2017-03-22, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:
# 24170701368862
Unscheduled inspection
Start date: 2017-02-22, end date: 2017-02-27, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to verify the fulfillment of an order previously issued to the person being audited to eliminate identified violations at a capital construction facility, the deadline for which expires. The objectives of this audit are to establish the fact of eliminating previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is to comply with the lawful order of the body carrying out regional state construction supervision