# 021903668712
Unscheduled inspection
Start date: 2019-09-26, end date: 2019-10-24, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: This inspection is carried out with the aim of following the notice of completion of construction 3 dated 050919 BX 23807 dated 11092019the objectives of this inspection are to identify prevent and suppress violations of legislation on urban development activities, including technical regulations and design documentationthe subject of this inspection is compliance with mandatory requirements or requirements established by municipal legal acts
# 021902758874
Unscheduled inspection
Start date: 2019-06-03, end date: 2019-07-02, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: This audit is conducted in accordance with the inspection program paragraph 12. The objectives of this audit are to identify, prevent and suppress violations of legislation on urban development, including technical regulations and project documentation. The purpose of this audit is to comply with mandatory requirements or requirements established by municipal legal acts
# 021801974296
Unscheduled inspection
Start date: 2018-10-17, end date: 2018-11-14, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: This inspection is carried out with the aim of following the notice of completion of construction 3 dated 050918 BX 21495 dated 03102018the objectives of this inspection are to identify prevent and suppress violations of legislation on urban development activities, including technical regulations and design documentationthe subject of this inspection is compliance with mandatory requirements or requirements established by municipal legal acts
# 021800241411
Unscheduled inspection
Start date: 2018-03-27, end date: 2018-04-23, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: This audit is conducted with the aim of following the notification of the elimination of violations 1 dated 12032/2018. The objectives of this audit are to identify, prevent and suppress violations of legislation on urban development activities, including technical regulations and project documentation. The purpose of this audit is to comply with the instructions of state control bodies, supervision bodies of municipal control
# 02180803053357
Unscheduled inspection
Start date: 2018-01-16, end date: 2018-02-12, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: identification prevention and suppression of violations of legislation on urban development, including technical regulations and project documentation
# 02180803053383
Unscheduled inspection
Start date: 2018-01-16, end date: 2018-02-12, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: identification prevention and suppression of violations of legislation on urban development, including technical regulations and project documentation
# 02170802641969
Unscheduled inspection
Start date: 2017-10-02, end date: 2017-10-30, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: carrying out an inspection of the execution of regulation 72 of 28082017 on notification 5 on the elimination of violations of 22092017 Bx 17620 of 220917 identification prevention and suppression of violations of legislation on urban development, including technical regulations and project documentation, compliance with the regulations of state control bodies, supervision of municipal control bodies
# 02170701794877
Unscheduled inspection
Start date: 2017-07-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 02170701351450
Unscheduled inspection
Start date: 2017-02-02, end date: 2017-03-03, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: according to the inspection program from 09082016, masonry walls, roof, facade insulation, internal and external engineering networks____________ identification prevention and suppression of violations of legislation on urban development, including technical regulations and project documentation, compliance with mandatory requirements or requirements established by municipal legal acts
# 742201503901
Unscheduled inspection
Start date: 2022-01-21, end date: 2022-02-03, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of the roof of the mill 2500 g.p. M-K-P axis 144-178 at the end of the work, on the installation of the wall fence of the mill 2500 g.p. row T axis 144-168 at the end of the work and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742201533593
Unscheduled inspection
Start date: 2022-01-24, end date: 2022-01-28, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the installation of the flue pipe diameter 5400 mm (in the process of work); the device of the bag filter DSP1 (in the process of work); the device of the built-in rooms (in the process of work); installation of the dust hopper (in the process of work). and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742201503855
Unscheduled inspection
Start date: 2022-01-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742201503814
Unscheduled inspection
Start date: 2022-01-26, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742201503931
Unscheduled inspection
Start date: 2022-01-28, end date: 2022-02-03, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the work performed on the foundations of the hydraulic fracturing building at the end of work; installation of supporting structures of the hydraulic fracturing building at the end of work; installation of enclosing structures and the roof of the hydraulic fracturing building during construction; external power supply of hydraulic fracturing during construction; installation of gas pipelines in the MMK hydraulic fracturing area, from MMK hydraulic fracturing to GRSZ, from CHP to MMK hydraulic fracturing (installation of foundations, supporting structures, pipelines) during construction and the construction materials used during construction, reconstruction of a capital construction facility, as well as the results of such work, according to the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the design documentation in accordance with parts 3.8 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and equipment requirements of the capital construction facility metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742201533545
Unscheduled inspection
Start date: 2022-01-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742201533749
Unscheduled inspection
Start date: 2022-01-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742101420817
Unscheduled inspection
Start date: 2021-12-16, end date: 2021-12-22, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the installation of gas purification equipment and pipelines behind converters No. 1,2,3. Installation of HF gas purification equipment and pipelines and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which the requirements energy efficiency does not apply) and the requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742101312911
Unscheduled inspection
Start date: 2021-11-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742101338829
Unscheduled inspection
Start date: 2021-11-30, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742101170081
Unscheduled inspection
Start date: 2021-10-12, end date: 2021-10-18, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of works on landscaping and landscaping of the territory, verification of compliance with sanitary and epidemiological requirements and fire safety issues and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (as amended included in the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements efficiency does not apply) and the requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.
# 742101223956
Unscheduled inspection
Start date: 2021-10-28, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742101246684
Unscheduled inspection
Start date: 2021-10-29, end date: 2021-11-08, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the installation of supporting structures of the hydraulic fracturing plant during construction; installation of gas pipelines in the MMK hydraulic fracturing area, from MMK hydraulic fracturing to GRSZ, from CHP to MMK hydraulic fracturing plant (installation of foundations, supporting structures, pipeline) during construction and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work meet the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742101230602
Unscheduled inspection
Start date: 2021-10-26, end date: 2021-11-24, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742101224000
Unscheduled inspection
Start date: 2021-10-27, end date: 2021-11-02, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of a transformer substation and the separation of projects: M 32927.01-EN2, EM1, EM2, EM6, EM7, EM8 and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code. The Code of Project Documentation (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of facilities capital construction, which are not covered by energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100958812
Unscheduled inspection
Start date: 2021-10-01, end date: 2021-10-28, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100673843
Unscheduled inspection
Start date: 2021-09-13, end date: 2021-10-08, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100771323
Unscheduled inspection
Start date: 2021-09-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100554485
Unscheduled inspection
Start date: 2021-09-09, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742100554700
Unscheduled inspection
Start date: 2021-09-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100554638
Unscheduled inspection
Start date: 2021-09-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100796314
Unscheduled inspection
Start date: 2021-09-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100554535
Unscheduled inspection
Start date: 2021-09-21, end date: 2021-09-27, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the manufacture of the gas carrier site, the tanker site, landscaping. Verification of compliance with sanitary and epidemiological requirements and fire safety issues and the construction materials used during construction, reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the design documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and equipment requirements for capital construction facilities accounting for the energy resources used. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100435513
Unscheduled inspection
Start date: 2021-08-19, end date: 2021-08-25, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with site preparation work, installation of temporary passageways for the construction of the hydraulic fracturing plant, gas pipelines from the MMK hydraulic fracturing plant to the GRSZ, from the MMK hydraulic fracturing plant to the TPP hydraulic fracturing plant; installation of the foundations of the hydraulic fracturing plant during construction; installation of the gas pipeline from the MMK hydraulic fracturing plant to the GRSZ (installation of foundations, supporting structures, pipeline) during construction. and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100384671
Unscheduled inspection
Start date: 2021-08-10, end date: 2021-08-16, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on the installation of foundations for gas station equipment and canopy construction, electrical installation, installation of gas pipelines and speakers. Verification of compliance with sanitary and epidemiological requirements and fire safety, landscaping and construction materials used during construction, reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the design documentation in accordance with 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and facility equipment requirements capital construction with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.
# 742100384701
Unscheduled inspection
Start date: 2021-08-09, end date: 2021-08-13, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of the liquid fuel tank, installation of technological pipelines, installation of compartments and fuel dispensers and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities that are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100500805
Unscheduled inspection
Start date: 2021-08-26, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742100492450
Unscheduled inspection
Start date: 2021-08-26, end date: 2021-09-01, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the contact network: installation of rigid crossbars, reinforcement of supports with consoles, reinforcement of the bolt with a fixing cable and triangular suspensions, electrical centralization: preparation of the cable route, laying of the floor cable, installation of the cable network and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code, the project documentation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100492368
Unscheduled inspection
Start date: 2021-08-24, end date: 2021-08-30, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of LPG vessels and a technological system, installation of technological gas pipelines, installation of technological compartments and GRCs, manufacture of a gas carrier and tanker platform, verification of compliance with sanitary and epidemiological requirements and fire safety, landscaping - upon completion of work and the construction materials used during construction, reconstruction of a capital construction facility, and as well as the results of such work, the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.
# 742100302973
Unscheduled inspection
Start date: 2021-07-12, end date: 2021-07-16, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the performance of interior and exterior finishing works, external engineering networks and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements the equipment of the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100301170
Unscheduled inspection
Start date: 2021-07-06, end date: 2021-07-12, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the construction of railway tracks and stations stage 3.4: filling out the base of the second unloading dead end, dismantling of railway tracks and switches at Quarry station, installation of railway transfer tracks No. 4,8,9, railway exit 32/36, lane P65 M1/7 - 3 pcs., installation of the stage No. 2 RIS-Vostochnaya , p. P65 M1/7-1 pcs., installation of excavation pits and foundations of contact network supports in Vostochny settlement, acceptance railway tracks art. RIS No. 14,15, installation of CS supports. Installation of the SCB equipment at the station station Eastern: installation of block statics, cable stands, installation of a feeding unit and cross-country statics, installation of an external scoreboard, a remote control, installation of an internal cable, installation of relays and blocks and construction materials used during construction, reconstruction of a capital construction facility, as well as the results of such work to the requirements approved in accordance with parts 15, 15.2 and 15.3 Article 48 of this Code of the project documentation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100306062
Unscheduled inspection
Start date: 2021-07-07, end date: 2021-07-13, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of flue foundations and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices energy resources used. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100306050
Unscheduled inspection
Start date: 2021-07-07, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742100306030
Unscheduled inspection
Start date: 2021-07-07, end date: 2021-07-13, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on the installation of pipelines and wells of water supply and sewerage networks according to projects M 32927.01-NVK, M 32927.02-NVK, installation of railway tracks and construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 Article 48 of this Code of the project documentation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100374077
Unscheduled inspection
Start date: 2021-07-26, end date: 2021-08-06, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the roof of the building of the 2500 g.p. mill, E-Z-M axis 144-178 upon completion of work. installation of the roof of the building of the 2500 G.P. mill, M-K-P axis 144-178 in the course of work. the installation of the wall fence of the mill building 2500 g.p. row T, axes 144-168 in the process of work. and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100278276
Unscheduled inspection
Start date: 2021-06-18, end date: 2021-06-24, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of RMU metal structures, installation of metal structures for external networks, installation of external ventilation and sewerage networks, earthworks, installation of foundations of the welding site, general construction works of the KTP and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code of the project documentation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including the requirements energy efficiency (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.
# 742100278300
Unscheduled inspection
Start date: 2021-06-17, end date: 2021-06-23, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of a slag base with a seal according to the project M 32927.01-KZH 15, plumbing work, installation of heating and ventilation in the ABC, finishing work in the ABC, installation of automation of the heat metering unit, heating and ventilation, alarm system in the ABC - during the production process and the construction materials used in the process construction, reconstruction of a capital construction facility, as well as the results of such work, according to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (in the case, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.
# 742100278347
Unscheduled inspection
Start date: 2021-06-22, end date: 2021-06-28, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on roofing, flooring, installation of windows, doors, gates, installation of internal engineering systems and building materials used during construction, reconstruction of a capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (with taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100194386
Unscheduled inspection
Start date: 2021-05-19, end date: 2021-05-25, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of gas purification foundations behind converters No. 1,2,3, the installation of gas purification foundations and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities that are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100231951
Unscheduled inspection
Start date: 2021-05-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100187792
Unscheduled inspection
Start date: 2021-05-07, end date: 2021-05-14, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on compliance with sanitary and epidemiological requirements and fire safety issues and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements the equipment of the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100227296
Unscheduled inspection
Start date: 2021-05-25, end date: 2021-05-31, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of load-bearing and enclosing structures, internal partitions and building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and equipment requirements a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100194377
Unscheduled inspection
Start date: 2021-05-20, end date: 2021-05-26, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of foundations for external networks and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and equipment requirements of the capital construction facility metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100104885
Unscheduled inspection
Start date: 2021-04-13, end date: 2021-04-19, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of windows on the 3rd floor, the installation of floors on the 3rd floor, the installation of m/k fire protection, finishing works on the 3rd floor and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code documentation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities which are not covered by energy efficiency requirements) and the requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.
# 742100099007
Unscheduled inspection
Start date: 2021-04-07, end date: 2021-04-13, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the excavation work, the installation of foundations of the RMU and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Articles 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and equipment requirements of the capital construction facility construction of metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100099089
Unscheduled inspection
Start date: 2021-04-06, end date: 2021-04-12, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of excavation work, foundations and building materials used during construction, reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with Parts 3.8 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and equipment requirements of the capital construction facility metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100094542
Unscheduled inspection
Start date: 2021-03-31, end date: 2021-04-13, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the roof of the 2500 g.p. mill building, C-T axis 144-178 at the end of the work, the wall fencing of the 2500 g.p. mill building, row T axis 144-168 during the work, the control posts No. 1 and No. 2 (axes 132, M-K), electric lighting of the electrical installation5 (axes 129-134, W), transformer chambers, control panel rooms, pumping and storage station (axes 134-136, W), ventilation rooms, cable floor of the agr. insp. otb. prob. building of mill 2500 in the process of work. and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100092730
Unscheduled inspection
Start date: 2021-03-30, end date: 2021-04-05, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of excavation work on a closed equipment warehouse, parking box building, ABC building and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements are not they are distributed) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100092514
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-02, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the work performed on the installation of a strapping beam on the 3rd floor, installation of an m/c attic superstructure, installation of wall panels, installation of roofing panels, installation of stairwell foundations, installation of m/c, staircases, wall panels, roof panels of a stairwell, installation of a monolithic slab, monolithic belt, monolithic floors, installation the wall and roof panels of the elevator shaft and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742005212182
Unscheduled inspection
Start date: 2020-11-17, end date: 2020-11-23, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the railway track laying works Stage I with the installation of pneumatic blowing pipelines stage I with the installation of foundations of contact network supports stage I with the installation of electrical centralization stage I with the construction of the EC post building stage II with the lightning protection and grounding of the EC post stage II with the foundation of the compressor station stage II with the foundation of the diesel generator stage II with the vertical layout of the base for railway tracks Stage III and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of information models are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742005239186
Unscheduled inspection
Start date: 2020-11-27, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742004499861
Unscheduled inspection
Start date: 2020-08-25, end date: 2020-09-07, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the performance of work on the construction of the wall fence of the building of the 2500 gp mill Row T axis 144168 in the process of work execution of work on the roof of the building of the 2500 gp mill EZHM axis 144178 in the process of work Execution of work on the installation of the floors of the room PLS mu axes 100101 y axis N HSE building 2500 at the end of work Execution improvement of the territory of the building of the chemical treated water pumping and filtration station and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the design documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Meeting the requirements of hh 23 and 31 st52 The Urban Planning Code of the Russian Federation
# 742004459967
Unscheduled inspection
Start date: 2020-07-28, end date: 2020-08-03, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the vertical layout of the base for railway tracks Stage I vertical layout of the territory of the EC post and highways stage II installation of the foundations of the EC post stage II laying of external water supply and sewerage networks of the EC post stage II during the production of works and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the approved in accordance with parts 15 152 and 153 of Article 48 of this Code of the project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities that are not covered by energy efficiency requirements and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004460309
Unscheduled inspection
Start date: 2020-07-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004436103
Unscheduled inspection
Start date: 2020-06-26, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742004427903
Unscheduled inspection
Start date: 2020-06-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004413789
Unscheduled inspection
Start date: 2020-05-29, end date: 2020-06-11, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 matching carry out the following work on the device of floors plot roughing stands on the site of NFE plot winders section of the line cleaning of the building of the mill 2500 in the process of implementation of works on the engine space ventilation 1ЭМП2 1ЭМП2 built premises in the axes 6165 in the span of the infrared space meters plot roughing stands built premises mu осями119120100 from the axis of NP premises KTP mu axes 98100 y-axis N the premises PLS mu axes 100101 from the axis N of the premises mu осями7581 from the axis of NP NFE building mill 2500 in the process of performance insulation and finish cap device of the ventilation system of sewage buildings filtration plant at the end made roboto device ventilation painted metal frame and grounds maintenance of building a pumping station 14000м3час at the end of the work performed and used building materials in the construction process of reconstruction of capital construction object and the results of such work requirements approved in accordance with paragraphs 152 and 153 of 15 of article 48 of this Code project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of this Code or information model in the case of the formation and maintenance of information models are required in accordance with the requirements of this Code, including the requirements of energy efficiency with the exception of capital construction objects, for which the requirements energy efficiency is not subject to requirements of the equipment of the facility metering devices of energy ресурсов2 have permission to строительство3 fulfillment of the requirements of CC 23 and 31 ст52 of the town planning code of the Russian Federation
# 742004306316
Unscheduled inspection
Start date: 2020-02-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004231226
Unscheduled inspection
Start date: 2020-01-30, end date: 2020-02-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the assembly and installation of supports for the installation of linear reinforcement wires Verification of compliance with sanitary and epidemiological requirements and fire safety issues and the construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices used for energy resource2 The availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741904127986
Unscheduled inspection
Start date: 2019-12-26, end date: 2020-01-09, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of finishing works, installation of windows, doors, installation of exterior porches and canopies of signage, installation of internal engineering networks, Verification of compliance with sanitary and epidemiological requirements and fire safety of building materials used during construction, reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation subject to the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Development Code of the Russian Federation and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction projects to which energy efficiency requirements do not apply, and equipment of the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741904148570
Unscheduled inspection
Start date: 2019-12-30, end date: 2020-01-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the excavation work, the installation of reinforced concrete foundations and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 The Urban Planning Code of the Russian Federation
# 741903990984
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-11-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the foundations and basin of the pool with the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used2 The availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning the Code of the Russian Federation
# 741904030892
Unscheduled inspection
Start date: 2019-11-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741903928946
Unscheduled inspection
Start date: 2019-11-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741903940678
Unscheduled inspection
Start date: 2019-11-12, end date: 2019-11-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of excavation work installation of foundations for equipment and canopy installation of technological underground pipelines of construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of the Articles 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Meeting the requirements of hr 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903857953
Unscheduled inspection
Start date: 2019-10-23, end date: 2019-10-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of the operator's building, the vessel of the GRC technological system, Verification of compliance with sanitary and epidemiological requirements and fire safety issues of the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation in accordance with in accordance with parts 38 and 39 of Articles 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources2 The availability of permits for building3 Meeting the requirements of hr 23 and 31st52 of the Urban Planning Code of the Russian Federation
# 741903670205
Unscheduled inspection
Start date: 2019-10-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741903878590
Unscheduled inspection
Start date: 2019-10-31, end date: 2019-11-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the following works with the building of the 2500 gp mill in axes 86178 EZHIMPN spans Roof installation wall fencing of the workshop building during the work process Building of the pumping station 14000m3h Installation of technological equipment fire alarm during the work process lighting at the end of the work performed Building of the water cooling complex lighting fire alarm at the end of the work performed Building of the pumping and filtration station of chemically treated water Lighting fire alarm upon completion of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model in the case of if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for used energy resources,2 The availability of a construction permit,3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 021903668712
Unscheduled inspection
Start date: 2019-09-26, end date: 2019-10-24, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: This inspection is carried out with the aim of following the notice of completion of construction 3 dated 050919 BX 23807 dated 11092019the objectives of this inspection are to identify prevent and suppress violations of legislation on urban development activities, including technical regulations and design documentationthe subject of this inspection is compliance with mandatory requirements or requirements established by municipal legal acts
# 741902755550
Unscheduled inspection
Start date: 2019-06-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 021902758874
Unscheduled inspection
Start date: 2019-06-03, end date: 2019-07-02, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: This audit is conducted in accordance with the inspection program paragraph 12. The objectives of this audit are to identify, prevent and suppress violations of legislation on urban development, including technical regulations and project documentation. The purpose of this audit is to comply with mandatory requirements or requirements established by municipal legal acts
# 741902698265
Unscheduled inspection
Start date: 2019-05-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902646011
Unscheduled inspection
Start date: 2019-04-18, end date: 2019-04-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The conformity of the installation of the building frame, the installation of wall fencing, gates, windows, roof, installation of built-in rooms, fire protection of metal structures, installation of metal structures, overpasses, installation of external engineering networks and construction materials used during the construction of a capital construction facility, as well as the results of such work, with project documentation 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902581971
Unscheduled inspection
Start date: 2019-03-20, end date: 2019-03-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The conformity of the installation of the building frame, the installation of wall fencing, gates, windows, roof, the installation of built-in rooms, fire protection of metal structures, the installation of metal structures, overpasses and building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902525908
Unscheduled inspection
Start date: 2019-03-01, end date: 2019-03-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the actual condition of the object 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902526430
Unscheduled inspection
Start date: 2019-02-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 021902471663
Unscheduled inspection
Start date: 2019-01-30, end date: 2019-02-26, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: This audit is conducted in accordance with the inspection program paragraph 12The objectives of this audit are to identify prevent and suppress violations of legislation on urban development, including technical regulations and project documentation. The purpose of this audit is to comply with mandatory requirements or requirements established by municipal legal acts
# 741902437681
Unscheduled inspection
Start date: 2019-01-23, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741802301787
Unscheduled inspection
Start date: 2018-12-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741802096710
Unscheduled inspection
Start date: 2018-11-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741801993595
Unscheduled inspection
Start date: 2018-10-23, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741801947795
Unscheduled inspection
Start date: 2018-10-26, end date: 2018-11-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of a heating point ventilation system finishing works landscaping compliance with fire and sanitary and epidemiological safety requirements during the production process and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741801997971
Unscheduled inspection
Start date: 2018-10-30, end date: 2018-11-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 021801974326
Unscheduled inspection
Start date: 2018-10-17, end date: 2018-11-14, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: This inspection is carried out with the aim of following the notice of completion of construction 2 dated 050918 BX 21493 dated 03102018the objectives of this inspection are to identify prevent and suppress violations of legislation on urban development, including technical regulations and design documentationthe subject of this inspection is compliance with mandatory requirements or requirements established by municipal legal acts
# 021801974296
Unscheduled inspection
Start date: 2018-10-17, end date: 2018-11-14, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: This inspection is carried out with the aim of following the notice of completion of construction 3 dated 050918 BX 21495 dated 03102018the objectives of this inspection are to identify prevent and suppress violations of legislation on urban development activities, including technical regulations and design documentationthe subject of this inspection is compliance with mandatory requirements or requirements established by municipal legal acts
# 741801460446
Unscheduled inspection
Start date: 2018-09-24, end date: 2018-09-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the breakdown of the route, the development of trenches, the installation of beds, the laying of pipes along the streets of Embankment, School, Youth, Sadovaya, Club and Nameless lanes during the production process and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800620360
Unscheduled inspection
Start date: 2018-08-17, end date: 2018-08-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the work on the breakdown of the route, the development of trenches, the installation of beds, the laying of pipes along the streets of Nagornaya Stepnaya Zelenaya Sovetskaya Lugovaya during the production process and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation
# 741800711366
Unscheduled inspection
Start date: 2018-08-31, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741800637078
Unscheduled inspection
Start date: 2018-08-24, end date: 2018-08-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the electrical installation of the automated control system and fire alarm system upon completion of work, landscaping, fire and sanitary safety and energy efficiency requirements during the production of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation 2 Availability of a construction permit 3 Implementation of requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800585924
Unscheduled inspection
Start date: 2018-07-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800570002
Unscheduled inspection
Start date: 2018-07-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800542695
Unscheduled inspection
Start date: 2018-07-13, end date: 2018-07-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the compliance of work on roofing, installation of technological equipment for pipelines, heating, ventilation, water supply, sewerage, as well as the results of such work with the requirements of technical regulations and project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800513062
Unscheduled inspection
Start date: 2018-07-06, end date: 2018-07-12, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of metal structures of the filter and technological air ducts 2nd stage in the production process and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800412270
Unscheduled inspection
Start date: 2018-06-09, end date: 2018-06-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of works on the installation of engineering networks, finishing works, fire protection of buildings during the construction process and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800408456
Unscheduled inspection
Start date: 2018-06-04, end date: 2018-06-08, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of metal structures of the building up to the mark of +30,000 upon completion of the work on the installation of metal structures of the building up to the mark of +34,000 metal structures of the filter and technological air ducts 1st stage in the process of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability building permits 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 001800338386
Unscheduled inspection
Start date: 2018-05-28, end date: 2018-06-01, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 1 execution of Rostechnadzor Order No. 28022018 86 "On the organization of Unscheduled on-site inspections of organizations Licensed to carry out industrial Safety Expertise activities" on the basis of instructions from Deputy Chairman of the Government of the Russian Federation AG Khloponin dated 13022018 AHP9771 2 license control by the licensee of NPO Reliability LLC license DE00007289 dated 17042007 DE00010203 dated 03062009 DE00011247 dated 04022010 the license for the following type of activity is the activity of conducting an industrial safety examination by types of work services performed provided as part of the licensed type of activity conducting an examination of buildings and structures at a hazardous production facility conducting an industrial safety examination of project documentation for the development construction expansion reconstruction technical re-equipment conservation and liquidation of a hazardous production facility conducting an examination of technical devices used at a hazardous production facility Paragraphs 3 to 2 of Part 2 of Article 10 of the Federal Law of 26122008 294 FZ "On the Protection of the Rights of Legal Entities and Individual Entrepreneurs in the Exercise of State Control, Supervision and Municipal Control" Article 19 of the Federal Law of 04052011 99 FZ "On Licensing certain types of Activities"
# 741800290635
Unscheduled inspection
Start date: 2018-05-04, end date: 2018-05-11, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of metal structures of the building up to the mark of +24,000 upon completion of the work on the installation of metal structures of the building up to the mark of +30,000 during the production of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800287048
Unscheduled inspection
Start date: 2018-04-16, end date: 2018-04-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the wall fencing of the building bricklaying of walls installation of doors windows gates the construction materials used during the construction of the capital construction facility as well as the results of such work to the requirements of the technical regulations of the project documentation 2 Availability of building permits 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code of the Russian Federation
# 741800179462
Unscheduled inspection
Start date: 2018-03-16, end date: 2018-03-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of metal structures of the building up to the mark of +16,000 upon completion of work up to the mark of +24,000 during the production of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation
# 021800241411
Unscheduled inspection
Start date: 2018-03-27, end date: 2018-04-23, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: This audit is conducted with the aim of following the notification of the elimination of violations 1 dated 12032/2018. The objectives of this audit are to identify, prevent and suppress violations of legislation on urban development activities, including technical regulations and project documentation. The purpose of this audit is to comply with the instructions of state control bodies, supervision bodies of municipal control
# 741800067123
Unscheduled inspection
Start date: 2018-02-16, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 02180803053357
Unscheduled inspection
Start date: 2018-01-16, end date: 2018-02-12, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: identification prevention and suppression of violations of legislation on urban development, including technical regulations and project documentation
# 02180803053383
Unscheduled inspection
Start date: 2018-01-16, end date: 2018-02-12, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: identification prevention and suppression of violations of legislation on urban development, including technical regulations and project documentation
# 74180803050038
Unscheduled inspection
Start date: 2018-01-19, end date: 2018-01-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of foundations for the building frame upon completion of work on the installation of foundations for equipment during the production process and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800016162
Unscheduled inspection
Start date: 2018-01-26, end date: 2018-02-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the actual condition of the object 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802925815
Unscheduled inspection
Start date: 2017-12-08, end date: 2017-12-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the preparation of the excavation site, the work on the foundation and foundations for the building frame during the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802742398
Unscheduled inspection
Start date: 2017-10-26, end date: 2017-11-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of technological equipment and fuel dispensers 2 pcs of oil and gas pumps installation of technological equipment and GRC 2 pcs of LPG installation of emergency tanks and sewage treatment plant systems installation of fire tanks V =100 m3 2 pcs landscaping of the territory verification of safety systems used building materials during the construction of a capital construction facility, as well as the results of such work to the requirements of technical regulations and project documentation2the receipt of a construction permit3compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 02170802641969
Unscheduled inspection
Start date: 2017-10-02, end date: 2017-10-30, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: carrying out an inspection of the execution of regulation 72 of 28082017 on notification 5 on the elimination of violations of 22092017 Bx 17620 of 220917 identification prevention and suppression of violations of legislation on urban development, including technical regulations and project documentation, compliance with the regulations of state control bodies, supervision of municipal control bodies
# 74170802695756
Unscheduled inspection
Start date: 2017-10-10, end date: 2017-10-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the compliance of the installation of external and on-site networks of the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2The receipt of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802753910
Unscheduled inspection
Start date: 2017-10-30, end date: 2017-11-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of works on landscaping installation of safety systems of building materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 The presence of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802754368
Unscheduled inspection
Start date: 2017-10-31, end date: 2017-11-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of external networks of the naphthalene fraction warehouse and technical naphthalene installation of metal structures and platforms of the naphthalene fraction warehouse installation of supports and pipelines of the naphthalene fraction warehouse installation and strapping of pumps of pipelines of the pumping station installation of the roof of the pumping station building finishing works of ventilation in the pumping station building electrical installation of outdoor lighting of the loading ramp installation of railway tracks paving of the loading ramp installation of metal structures of a fire extinguishing pumping station installation of a roof of a fire extinguishing pumping station installation and strapping of pumps and pipelines of a fire extinguishing pumping station finishing and ventilation of a fire extinguishing pumping station electrical installation of technological equipment for electric heating of pipelines commissioning of a warehouse of naphthalene fraction electrical ventilation automation of fire control systems of a pumping station building commissioning of communication networks water irrigation loading ramp commissioning of electrical automation equipment accounting systems, management of the fire automation system of the fire extinguishing pumping station, verification of compliance with sanitary and epidemiological requirements and fire safety2 Receipt of building permits3compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802754213
Unscheduled inspection
Start date: 2017-10-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802209162
Unscheduled inspection
Start date: 2017-09-14, end date: 2017-09-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of the work on the installation of 2 MLT tanks during the installation of vessels V=10 m3 2 pcs during the work of the construction materials used during the construction of the capital construction facility, as well as the results of such work, to the requirements of technical regulations and project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802211506
Unscheduled inspection
Start date: 2017-09-29, end date: 2017-10-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of metal structures during the production process of the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802206965
Unscheduled inspection
Start date: 2017-09-27, end date: 2017-10-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of technological pipelines and engineering networks upon completion of the installation of the operator's office building during the work, the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802484564
Unscheduled inspection
Start date: 2017-09-22, end date: 2017-09-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of fire-fighting and sanitary-epidemiological requirements with the compliance of landscaping work upon completion of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 02170701882080
Unscheduled inspection
Start date: 2017-08-09, end date: 2017-09-05, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: according to the notice of completion of the construction of the capital construction facility 5 dated 10072017 bx 14593 dated 030817, the identification, prevention and suppression of violations of legislation on urban development activities, including technical regulations and project documentation, compliance with mandatory requirements or requirements established by municipal legal acts
# 74170701838870
Unscheduled inspection
Start date: 2017-08-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170801919360
Unscheduled inspection
Start date: 2017-08-25, end date: 2017-08-31, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of work on the improvement of fire and sanitary epidemiological requirements for the completion of completed works and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701784866
Unscheduled inspection
Start date: 2017-07-18, end date: 2017-07-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of the work on the foundation for fuel tanks 2 pcs. installation of the operator's building, installation of the foundation for LPG tanks 2 pcs. construction materials used during the construction of the capital construction facility, as well as the results of such work, to the requirements of technical regulations and project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701806989
Unscheduled inspection
Start date: 2017-07-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701776289
Unscheduled inspection
Start date: 2017-07-12, end date: 2017-07-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the compliance of the work on the foundations of the building during the execution of the work of the building materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation 2The receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 02170701794877
Unscheduled inspection
Start date: 2017-07-11, end date: 2017-08-07, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: carrying out an inspection of the execution of regulation 37 dated 22052017 on notification 4 on the elimination of violations dated 29062017 identification prevention and suppression of violations of legislation on urban development activities, including technical regulations and project documentation, compliance with the regulations of state control bodies, supervision of municipal control bodies
# 74170701697458
Unscheduled inspection
Start date: 2017-06-15, end date: 2017-06-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the foundation for the operator's building with the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701737091
Unscheduled inspection
Start date: 2017-06-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701724829
Unscheduled inspection
Start date: 2017-06-26, end date: 2017-06-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of metal structures of the frame and half-timbered wall panels, the roof of the stairwells of the pedestal, the installation of a collection dust hopper, the device of a scrubber cooler, the device of flues, electrical installation work, gas cleaning, APK2 and particle board32 upon completion of the work performed to meet fire and sanitary and epidemiological requirements landscaping, as well as the results of such work, to the requirements of technical regulations, project documentation2the receipt of a construction permit3compliance with the requirements of HH 23 st52 of the Urban Planning Code Russian Federation
# 74170701652925
Unscheduled inspection
Start date: 2017-06-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701652413
Unscheduled inspection
Start date: 2017-05-31, end date: 2017-06-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of metal structures of the frame and half-timbered wall panels to the roofing of the stairwells of chipboard 32 to the installation of metal structures of the frame and half-timbered wall panels to the roof of the agro-industrial complex 2 to the device of the scrubber cooler to the device of flues and the construction materials used during the construction of the capital construction facility as well as the results of such work to the requirements of technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 Urban Planning the Code of the Russian Federation
# 74170701623312
Unscheduled inspection
Start date: 2017-05-31, end date: 2017-06-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the development of the soil for the foundations of the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701622192
Unscheduled inspection
Start date: 2017-05-24, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170701622119
Unscheduled inspection
Start date: 2017-05-24, end date: 2017-05-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1confirmation of the conformity of work electrical installation of technological equipment and ventilation commissioning ventilation oxygen control fire automation system of the building flaking naphthalene electrical installation automation of accounting systems for content management video surveillance communication networks water irrigation verification of compliance with sanitary and epidemiological requirements and fire safety after completion of work materials used during the construction of a capital construction facility as well as the results of such work requirements technical regulations and project documentation2 Obtaining a construction permit3compliance with the requirements of HH 23 ST52 of the Urban Planning Code of the Russian Federation
# 74170701486988
Unscheduled inspection
Start date: 2017-04-05, end date: 2017-04-11, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of foundations for duct supports upon completion of work on the installation of foundations for the installation and exhaust tower during the work installation of air ducts and equipment during the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, to the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 02170701569251
Unscheduled inspection
Start date: 2017-04-25, end date: 2017-05-25, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify notification 3 dated 12042017 bx6915 dated 170417 on the completion dates of works subject to inspection during the construction of a capital construction facility roof installation interior wall masonry facade installation compliance with fire-fighting sanitary and epidemiological requirements installation of electrical installations verification of measures taken to work during the spring flood period interior finishing workthe objectives of this inspection are to identify prevent and suppress violations legislation on urban planning activities, including technical regulations and project documentationthe subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts
# 74170701560027
Unscheduled inspection
Start date: 2017-04-25, end date: 2017-05-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1confirmation of the conformity of work on the installation of building frame equipment up to OTM +13400 roofing finishing works ventilation heating electrical equipment of the building flaking naphthalene for the installation of equipment and pipelines landscaping of the naphthalene rectification plant of materials used during the construction of the capital construction facility, as well as the results of such work, to the requirements of technical regulations and project documentation2 Receipt of a construction permit 3compliance with the requirements of hh 23 st52 Urban Planning the Code of the Russian Federation
# 74170701559931
Unscheduled inspection
Start date: 2017-04-25, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170701528707
Unscheduled inspection
Start date: 2017-04-21, end date: 2017-04-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of gas purification equipment for particle board32, filters, smoke pumps, etc. electrical installation of gas purification for agro-industrial complex2 and particle board32 fulfillment of fire and sanitary and epidemiological requirements landscaping upon completion of completed work2 Receipt of a construction permit3compliance with the requirements of HH 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701441855
Unscheduled inspection
Start date: 2017-03-17, end date: 2017-03-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of gas purification sites and bunkers for the agro-industrial complex2 installation of a scrubber installation of a gas duct in the west of the charge yard construction of premises and enclosing structures installation of a dust bunker and gas purification drains for particle board32 construction of a receiver and the construction materials used during the construction of a capital construction facility as well as the results of such work to the requirements of technical regulations of the project documentation2 Receipt of a construction permit 3compliance with the requirements of hh 23 st52 The Urban Planning Code of the Russian Federation
# 74170701422427
Unscheduled inspection
Start date: 2017-03-14, end date: 2017-03-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of the technological equipment of the gas station with the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the receipt of a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701393217
Unscheduled inspection
Start date: 2017-03-03, end date: 2017-03-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on dismantling the chimney cabin of the hog, the installation of foundations for duct supports and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701363569
Unscheduled inspection
Start date: 2017-02-15, end date: 2017-02-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of the installation of the gas purification building frame for agribusiness 2 for the installation of gas purification equipment for agribusiness 2 for the construction of a pumping gas purification room for agribusiness 2 up to mm0000 for the construction of a compressor gas purification room for agribusiness 2 up to otm 0000 for the installation of a chipboard gas purification building frame 32 sites bunkers and building materials used during the construction of a capital construction facility as well as the results of such work to the technical requirements regulations of project documentation2 Obtaining a construction permit3compliance with the requirements of HH 23 ST52 of the Urban Planning Code of the Russian Federation
# 74170701334610
Unscheduled inspection
Start date: 2017-02-07, end date: 2017-02-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1confirmation of the compliance of the work on the installation of foundations for the building of the operator's office of technological equipment and the canopy of materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation2 Receipt of a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 02170701351450
Unscheduled inspection
Start date: 2017-02-02, end date: 2017-03-03, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: according to the inspection program from 09082016, masonry walls, roof, facade insulation, internal and external engineering networks____________ identification prevention and suppression of violations of legislation on urban development, including technical regulations and project documentation, compliance with mandatory requirements or requirements established by municipal legal acts
# 74170701268295
Unscheduled inspection
Start date: 2017-01-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701309178
Unscheduled inspection
Start date: 2017-01-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701308683
Unscheduled inspection
Start date: 2017-01-25, end date: 2017-01-31, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1confirmation of the conformity of work on the manufacture and installation of metal structures, bookcases and construction sites, naphthalene rectification plants, materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation2 Receipt of a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701199270
Unscheduled inspection
Start date: 2016-12-15, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74160701199177
Unscheduled inspection
Start date: 2016-12-15, end date: 2016-12-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1confirmation of the compliance of the work with the installation of foundations of the FOM 1 FOM 2 channel from the warehouse to the pumping station for the warehouse of naphthalene fraction and technical naphthalene installation of external networks installation of pipeline diameter 530 mm installation of foundations of the FOm1 FOm2 pumping station building installation of enclosing structures of the loading ramp installation of the frame of the pumping station building of fire extinguishing made of bricks used in the construction of the capital construction facility as well as the same results of such work as the requirements of technical regulations and project documentation2 Obtaining a construction permit3compliance with the requirements of HH 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701142716
Unscheduled inspection
Start date: 2016-11-28, end date: 2016-12-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1confirmation of compliance of work on the installation of metal structures of bookcases and naphthalene rectification sites of materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation2 Receipt of a construction permit3compliance with the requirements of HR 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701142277
Unscheduled inspection
Start date: 2016-11-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160701151865
Unscheduled inspection
Start date: 2016-11-25, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 00160601698842
Unscheduled inspection
Start date: 2016-07-04, end date: 2016-07-29, duration: —
Authority: Federalnaya sluzhba po akkreditacii
Purpose of inspection: verification of possible violations by the Limited Liability Company NPO Reliability accredited for the right to conduct a non-governmental examination of the results of engineering surveys of the requirements of Article 50 of the Urban Planning Code of the Russian Federation identified during the analysis of applications for accreditation for the right to conduct a non-governmental examination of project documentation and or the results of engineering surveys of applications for amendments to the register of accredited persons