Found 82 inspections:

# 00170701669919
Unscheduled inspection
Start date: 2017-05-31, end date: 2017-06-28, duration:
Authority: Komitet goroda Moskvy po obespecheniyu realizacii investicionnyh proektov v stroitelstve i kontrolyu v oblasti dolevogo stroitelstva
Purpose of inspection: Control over the activities of Remstroytrest LLC related to the attraction and expenditure of funds from participants in shared-equity construction control over compliance with the provisions established by Federal Law No. 30122004 214 FZ


# 772101520504
Unscheduled inspection
Start date: 2021-12-27, end date: 2021-12-28, duration: 2
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772101365334
Unscheduled inspection
Start date: 2021-11-19, end date: 2021-11-19, duration: 1
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772101336212
Unscheduled inspection
Start date: 2021-11-16, end date: —, duration:
Authority:
Purpose of inspection:


# 772101216812
Unscheduled inspection
Start date: 2021-10-18, end date: 2021-11-15, duration: 19
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100732092
Unscheduled inspection
Start date: 2021-09-14, end date: —, duration:
Authority:
Purpose of inspection:


# 772100429564
Unscheduled inspection
Start date: 2021-09-06, end date: —, duration:
Authority:
Purpose of inspection:


# 772100459830
Unscheduled inspection
Start date: 2021-08-13, end date: —, duration:
Authority:
Purpose of inspection:


# 772100323604
Unscheduled inspection
Start date: 2021-07-05, end date: —, duration:
Authority:
Purpose of inspection:


# 772100228969
Unscheduled inspection
Start date: 2021-05-19, end date: —, duration: 20
Authority: Komitet goroda Moskvy po obespecheniyu realizacii investicionnyh proektov v stroitelstve i kontrolyu v oblasti dolevogo stroitelstva
Purpose of inspection: To establish that the purpose and objective of this audit is to verify compliance with the mandatory requirements of the legislation on participation in the shared-equity construction of apartment buildings and (or) other real estate objects. The subject of an unscheduled documentary check is compliance with the requirements of the legislation on participation in the shared-equity construction of apartment buildings and (or) other real estate objects.


# 772100226478
Unscheduled inspection
Start date: 2021-05-24, end date: 2021-06-21, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772004404731
Unscheduled inspection
Start date: 2020-05-06, end date: —, duration:
Authority:
Purpose of inspection:


# 772004404727
Unscheduled inspection
Start date: 2020-05-06, end date: 2020-05-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notice from the developer to the customer. The tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban development by the person being audited. The subject of the audit is to ensure that the developer fulfills the requirements of part 31 of Article 52 of the Urban Planning Code. The presence of construction specialists, chief engineers of the project, the conformity of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, are fulfilled by the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code


# 772004382900
Unscheduled inspection
Start date: 2020-04-02, end date: 2020-04-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used


# 772004375613
Unscheduled inspection
Start date: 2020-03-24, end date: 2020-04-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notice from the developer to the customer. The tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban development by the person being audited. The subject of the audit is the fulfillment by the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code. The presence of construction specialists, chief engineers of the project, the conformity of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such works meet the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources.


# 772004237266
Unscheduled inspection
Start date: 2020-01-31, end date: 2020-02-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notice from the developer to the customer. The tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person. The subject is to verify the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction accounting devices for used energy resources the involvement of specialists in the organization of construction, chief engineers of the project, and the fulfillment by the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code


# 771904149035
Unscheduled inspection
Start date: 2019-12-27, end date: 2020-01-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notice from the developer to the customer. The tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban development by the person being audited. The subject of the audit is to comply with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation. The presence of construction specialists, chief engineers of the project, the conformity of the work performed and the construction materials used during the construction and reconstruction of the capital construction facility, and as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the compliance of the capital construction facility with the requirements specified in the construction permit


# 771903884119
Unscheduled inspection
Start date: 2019-11-05, end date: —, duration:
Authority:
Purpose of inspection:


# 771903623429
Unscheduled inspection
Start date: 2019-09-17, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803483981
Unscheduled inspection
Start date: 2019-08-26, end date: 2019-09-06, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, the subject of verification is the fulfillment by the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code, compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation in accordance with the requirements of the technical regulations of the project documentation in accordance with the requirements of the technical regulations of the project documentation in accordance with the requirements of the technical regulations of the project documentation in accordance with the requirements of the technical regulations of the project documentation in accordance with the requirements of the technical regulations of the project documentation in accordance with the requirements of the technical regulations of the project documentation in accordance with the requirements of the including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803470911
Unscheduled inspection
Start date: 2019-08-09, end date: 2019-09-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program. The tasks of the audit are to prevent the identification and suppression of violations committed by the person being audited of the requirements of the design documentation of the legislation on urban development. The subject of the audit is to ensure that the person carrying out the construction fulfills the requirements of part 3 of Article 52 of the Urban Planning Code. The verification of the elimination of violations specified in the order issued by the Moscow City Construction Supervision. The compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources


# 77190803427284
Unscheduled inspection
Start date: 2019-06-05, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803399876
Unscheduled inspection
Start date: 2019-04-22, end date: 2019-05-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, compliance by the developer with the requirements of part 31 of Article 52 of the Urban Planning Code


# 77190803367814
Unscheduled inspection
Start date: 2019-03-13, end date: 2019-03-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803378453
Unscheduled inspection
Start date: 2019-03-25, end date: 2019-04-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803345574
Unscheduled inspection
Start date: 2019-02-28, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77190803323300
Unscheduled inspection
Start date: 2019-01-31, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803316451
Unscheduled inspection
Start date: 2019-01-21, end date: 2019-02-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to eliminate violations specified in the order issued by Mosgosstroynadzor. The tasks of the audit are to prevent the detection and suppression of violations of technical regulations and project documentation committed by the person being audited. The subject of the audit is to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803316639
Unscheduled inspection
Start date: 2019-01-22, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803318097
Unscheduled inspection
Start date: 2019-01-23, end date: 2019-02-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: prevention detection and suppression of violations of technical regulations and project documentation committed by the person being checked verification of elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803317629
Unscheduled inspection
Start date: 2019-01-23, end date: 2019-01-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803291472
Unscheduled inspection
Start date: 2018-12-07, end date: 2019-01-11, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803264628
Unscheduled inspection
Start date: 2018-11-02, end date: 2018-11-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803250315
Unscheduled inspection
Start date: 2018-10-12, end date: 2018-11-09, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803250856
Unscheduled inspection
Start date: 2018-10-16, end date: 2018-10-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803222390
Unscheduled inspection
Start date: 2018-09-12, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77180803217968
Unscheduled inspection
Start date: 2018-09-05, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803194602
Unscheduled inspection
Start date: 2018-08-08, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803189817
Unscheduled inspection
Start date: 2018-08-01, end date: 2018-08-07, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803182524
Unscheduled inspection
Start date: 2018-07-20, end date: 2018-08-16, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803182523
Unscheduled inspection
Start date: 2018-07-20, end date: 2018-08-16, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803173005
Unscheduled inspection
Start date: 2018-07-03, end date: 2018-07-04, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803160722
Unscheduled inspection
Start date: 2018-06-20, end date: 2018-06-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803142455
Unscheduled inspection
Start date: 2018-05-18, end date: 2018-06-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803139773
Unscheduled inspection
Start date: 2018-05-16, end date: 2018-06-14, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803134203
Unscheduled inspection
Start date: 2018-05-08, end date: 2018-06-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803134151
Unscheduled inspection
Start date: 2018-05-08, end date: 2018-06-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803145193
Unscheduled inspection
Start date: 2018-05-24, end date: 2018-05-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor, compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 771800289768
Unscheduled inspection
Start date: 2018-04-23, end date: 2018-05-23, duration:
Authority: Komitet goroda Moskvy po obespecheniyu realizacii investicionnyh proektov v stroitelstve i kontrolyu v oblasti dolevogo stroitelstva
Purpose of inspection: the purpose and objective of this audit is to verify compliance with the mandatory requirements of the legislation on participation in the shared construction of apartment buildings and or other real estate objects The subject of an unscheduled documentary audit is compliance with the requirements of the legislation on participation in the shared construction of apartment buildings and or other real estate objects


# 77180803127455
Unscheduled inspection
Start date: 2018-04-24, end date: 2018-04-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803128700
Unscheduled inspection
Start date: 2018-04-26, end date: 2018-05-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803097465
Unscheduled inspection
Start date: 2018-03-12, end date: 2018-03-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803097418
Unscheduled inspection
Start date: 2018-03-12, end date: 2018-03-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803088479
Unscheduled inspection
Start date: 2018-02-26, end date: 2018-03-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803067623
Unscheduled inspection
Start date: 2018-01-25, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803067622
Unscheduled inspection
Start date: 2018-01-25, end date: 2018-02-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170803017872
Unscheduled inspection
Start date: 2017-12-22, end date: 2018-01-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802896828
Unscheduled inspection
Start date: 2017-11-27, end date: 2017-12-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802896825
Unscheduled inspection
Start date: 2017-11-27, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77170802699553
Unscheduled inspection
Start date: 2017-10-16, end date: 2017-11-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802699543
Unscheduled inspection
Start date: 2017-10-16, end date: 2017-11-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802788040
Unscheduled inspection
Start date: 2017-10-31, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802562659
Unscheduled inspection
Start date: 2017-09-21, end date: 2017-10-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701881376
Unscheduled inspection
Start date: 2017-08-14, end date: 2017-09-08, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701881375
Unscheduled inspection
Start date: 2017-08-14, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701849346
Unscheduled inspection
Start date: 2017-08-03, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701843909
Unscheduled inspection
Start date: 2017-08-01, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701791424
Unscheduled inspection
Start date: 2017-07-13, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701734536
Unscheduled inspection
Start date: 2017-06-23, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701734474
Unscheduled inspection
Start date: 2017-06-23, end date: —, duration:
Authority:
Purpose of inspection:


# 00170701669919
Unscheduled inspection
Start date: 2017-05-31, end date: 2017-06-28, duration:
Authority: Komitet goroda Moskvy po obespecheniyu realizacii investicionnyh proektov v stroitelstve i kontrolyu v oblasti dolevogo stroitelstva
Purpose of inspection: Control over the activities of Remstroytrest LLC related to the attraction and expenditure of funds from participants in shared-equity construction control over compliance with the provisions established by Federal Law No. 30122004 214 FZ


# 77170701558334
Unscheduled inspection
Start date: 2017-04-24, end date: 2017-05-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701500433
Unscheduled inspection
Start date: 2017-04-24, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701443394
Unscheduled inspection
Start date: 2017-03-10, end date: 2017-03-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701500366
Unscheduled inspection
Start date: 2017-03-30, end date: 2017-03-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701500318
Unscheduled inspection
Start date: 2017-03-30, end date: 2017-03-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701435972
Unscheduled inspection
Start date: 2017-03-07, end date: 2017-03-14, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor, compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701367166
Unscheduled inspection
Start date: 2017-02-08, end date: 2017-02-10, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701305605
Unscheduled inspection
Start date: 2017-01-17, end date: 2017-01-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701305601
Unscheduled inspection
Start date: 2017-01-17, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77170701327984
Unscheduled inspection
Start date: 2017-01-26, end date: 2017-01-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701327954
Unscheduled inspection
Start date: 2017-01-26, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.