Found 37 inspections:

# 162101486182
Unscheduled inspection
Start date: 2021-12-21, end date: —, duration: 8
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the process of reconstruction of the capital construction facility of building materials, the results of such works with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2, 3 and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 08/19/2021 case No.19-04-2021/0006. The objectives of this audit are: prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out the reconstruction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this review is (select the appropriate one): compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 162101339993
Unscheduled inspection
Start date: 2021-11-16, end date: —, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works, the construction materials used in the process of reconstruction of the capital construction facility, and the results of such work with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 08/19/2021 case No. 19-04-2021/0006. The objectives of this audit are: prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out the reconstruction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.;


# 162101243733
Unscheduled inspection
Start date: 2021-10-26, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162100846881
Unscheduled inspection
Start date: 2021-09-21, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162100529955
Unscheduled inspection
Start date: 2021-08-24, end date: —, duration:
Authority:
Purpose of inspection:


# 162100360238
Unscheduled inspection
Start date: 2021-07-27, end date: —, duration:
Authority:
Purpose of inspection:


# 162100314760
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration:
Authority:
Purpose of inspection:


# 162100303287
Unscheduled inspection
Start date: 2021-06-22, end date: —, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the process of reconstruction of the capital construction facility of building materials, the results of such works with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2, 3 and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 04/15/2021 case No. 19-04-2021/0001. The objectives of this audit are: prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out the reconstruction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this audit is compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 162100302951
Unscheduled inspection
Start date: 2021-06-22, end date: —, duration:
Authority:
Purpose of inspection:


# 162100193979
Unscheduled inspection
Start date: 2021-05-11, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the process of reconstruction of the capital construction facility of building materials, the results of such works with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2, 3 and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 04/15/2021 case No. 19-04-2021/0001. The objectives of this audit are: prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out the reconstruction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this audit is compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 162100243932
Unscheduled inspection
Start date: 2021-05-27, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162100066589
Unscheduled inspection
Start date: 2021-03-16, end date: 2021-04-12, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: protection of the rights and interests of employees


# 162005253662
Unscheduled inspection
Start date: 2020-12-01, end date: 2020-12-04, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of fulfillment of the instruction dated 26102020 1312044901, the deadline for which expired on 26112020, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations of compliance by the developer, the customer, the person carrying out reconstruction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations and other regulatory documents performed during the construction of a capital construction facility. legal acts and project documentationthe subject of this audit is to select the necessary fulfillment of the instructions of the state control bodies, supervision bodies of municipal control


# 162005178368
Unscheduled inspection
Start date: 2020-10-19, end date: —, duration:
Authority:
Purpose of inspection:


# 162005199312
Unscheduled inspection
Start date: 2020-10-26, end date: 2020-10-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the reconstruction of the capital construction facility comply with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program from 2010-2020 case 131120200055 The objectives of this inspection are to prevent, identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, the person carrying out the reconstruction on the basis of a contract with the developer or the customer of the work performed during the construction of the capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 162004486830
Unscheduled inspection
Start date: 2020-08-19, end date: —, duration:
Authority:
Purpose of inspection:


# 162004436454
Unscheduled inspection
Start date: 2020-06-22, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162004410143
Unscheduled inspection
Start date: 2020-05-19, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162004394582
Unscheduled inspection
Start date: 2020-04-15, end date: 2020-04-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program from 03022020 case 190420200004 The objectives of this inspection are to prevent as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 162004353208
Unscheduled inspection
Start date: 2020-03-17, end date: 2020-03-31, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program from 03022020 case 190420200004 The objectives of this inspection are to prevent as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 002004402011
Unscheduled inspection
Start date: 2020-02-10, end date: 2020-02-21, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to verify that a legal entity has eliminated a previously identified violation of the mandatory requirements specified in paragraphs 123 of Regulation No. 25072019 432159184


# 161903980991
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-12-13, duration:
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: protection of the rights and interests of employees


# 161903003326
Unscheduled inspection
Start date: 2019-08-26, end date: 2019-09-20, duration:
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: protection of the rights and interests of employees


# 001902925099
Unscheduled inspection
Start date: 2019-06-28, end date: 2019-07-25, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: execution of Rostechnadzor Order No. 44 dated 01022019 On Conducting Inspections of Compliance with Mandatory Requirements by Electric Power Industry Entities, Heat Supply Organizations, Heating Grid Organizations and Consumers of Electric Energy in 2019


# 161902532565
Unscheduled inspection
Start date: 2019-02-20, end date: 2019-03-15, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Respublike Tatarstan Tatarstan
Purpose of inspection: monitoring the implementation of paragraphs 1, 3, and 4 of the previously issued instruction of the official authorized to carry out state sanitary and epidemiological supervision dated July 25, 2018. supervision and control over the implementation of mandatory requirements of the legislation of the Russian Federation in the field of ensuring sanitary and epidemiological welfare of the population. compliance with the instructions of state control bodies, supervision bodies, municipal control bodies, municipal control bodies, municipal control bodies, municipal control bodies, municipal control bodies, municipal control bodies, municipal control bodies, municipal control bodies, municipal control bodies, municipal control bodies, municipal control bodies, municipal control bodies, municipal control bodies, municipal control bodies, municipal control bodies, municipal control bodies, municipal control bodies


# 161802081729
Unscheduled inspection
Start date: 2018-11-12, end date: —, duration:
Authority:
Purpose of inspection:


# 161801010981
Unscheduled inspection
Start date: 2018-09-06, end date: 2018-09-12, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules for determining the fact of execution of the order, as well as for the purpose of drawing up an act on the elimination of violations of the order based on the notice received by the Inspectorate from 28082018 6157 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the order from 09082018 1919012601 to 03092018 and the expiration of the order from 09082018 1919012601, the deadline for which expired 03092018, the objectives of this audit are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out the reconstruction on the basis of a contract with the developer or the customer, violations of compliance of the works performed during the construction of the capital construction facility with the requirements of technical regulations other regulatory legal acts and The subject of this audit is the fulfillment of the requirements of the state control bodies, supervision of municipal control bodies.


# 161800646471
Unscheduled inspection
Start date: 2018-08-22, end date: 2018-08-29, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the reconstruction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program dated 28052018 case 191120170038, the objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, the person carrying out reconstruction on the basis of a contract with the developer or the customer, with the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts


# 161800577549
Unscheduled inspection
Start date: 2018-07-30, end date: —, duration:
Authority:
Purpose of inspection:


# 161800577340
Unscheduled inspection
Start date: 2018-07-30, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161800438700
Unscheduled inspection
Start date: 2018-06-07, end date: 2018-06-14, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the process of reconstruction of the capital construction facility of building materials and the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program dated 28052018 case 191120170038, the objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out reconstruction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts


# 161800238939
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-12, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the reconstruction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program dated 05/122017 case 191120170038, the objectives of this inspection are to prevent, identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, the person carrying out the reconstruction on the basis of a contract with the developer or the customer. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts


# 161800238806
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-12, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of fulfillment of the order dated 21022018 1919000801, the deadline for which expired 19032018, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out reconstruction on the basis of a contract with the developer or the customer, violations of compliance with the requirements of technical regulations and other regulations performed during the construction of a capital construction facility. regulatory legal acts and project documentation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 161800069805
Unscheduled inspection
Start date: 2018-02-15, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 16170802980255
Unscheduled inspection
Start date: 2017-12-14, end date: 2017-12-29, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the reconstruction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program dated 05/122017 case 191120170038the objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, the person carrying out reconstruction on the basis of a contract with the developer or the customer, with the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts


# 16160701022303
Unscheduled inspection
Start date: 2016-10-24, end date: 2016-10-31, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: to determine whether the construction materials used during the construction and reconstruction of a capital construction facility comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the program of inspections from 26082016 case 191120160040


# 16160700845002
Unscheduled inspection
Start date: 2016-09-21, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.