Found 15 inspections:

# 342101534594
Unscheduled inspection
Start date: 2021-12-16, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 342101534542
Unscheduled inspection
Start date: 2021-12-16, end date: —, duration:
Authority:
Purpose of inspection:


# 342101210201
Unscheduled inspection
Start date: 2021-10-22, end date: —, duration:
Authority:
Purpose of inspection:


# 342101164303
Unscheduled inspection
Start date: 2021-09-28, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a) this inspection is carried out in accordance with the inspection program received by the representative of the developer, Stroyinterier LLC, in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and project documentation; b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations, and project documentation. 7. The subject of this audit is compliance with mandatory requirements regarding: a) compliance of the work performed and the construction materials and products used during the construction, reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the Code). documentation (including changes made to the working documentation that are part of such project documentation in accordance with Part 1.3 of Article 52 of the Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Code); b) building permit requirements; c) the requirements established by parts 2 and 3.1 of Article 52 of the Code; d) the requirements established by part 4 of Article 52 of the Code to ensure the conservation of the capital construction facility; e) requirements for the procedure for carrying out construction control established by the Code and other regulatory legal acts.


# 342101164296
Unscheduled inspection
Start date: 2021-09-28, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a) this inspection is carried out in accordance with the inspection program received by the representative of the developer, Stroyinterier LLC, in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and project documentation; b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations, and project documentation. 7. The subject of this audit is compliance with mandatory requirements regarding: a) compliance of the work performed and the construction materials and products used during the construction, reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the Code). documentation (including changes made to the working documentation that are part of such project documentation in accordance with Part 1.3 of Article 52 of the Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Code); b) building permit requirements; c) the requirements established by parts 2 and 3.1 of Article 52 of the Code; d) the requirements established by part 4 of Article 52 of the Code to ensure the conservation of the capital construction facility; e) requirements for the procedure for carrying out construction control established by the Code and other regulatory legal acts.


# 342100384414
Unscheduled inspection
Start date: 2021-07-26, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a) this inspection is carried out in accordance with the inspection program received by the representative of the developer, Investvolgstroy LLC, in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation and project documentation; b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation. 7. The subject of this audit is compliance with mandatory requirements regarding: 1) compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the GsK RF) (including changes made to working documentation and which, in accordance with Part 1.3 of Article 52 of the GsK RF, are part of such project documentation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the GsK RF); 2) building permit requirements; 3) the requirements established by Parts 2 and 3.1 of Article 52 of the Civil Code of the Russian Federation; 4) the requirements established by part 4 of Article 52 of the Civil Code of the Russian Federation to ensure the conservation of the capital construction facility; 5) requirements to the procedure for the implementation of construction control established by the GSK of the Russian Federation and other regulatory legal acts.


# 342000310520
Unscheduled inspection
Start date: 2021-06-16, end date: 2021-03-16, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a) this inspection is carried out in accordance with the inspection program received by a representative of the developer, Stroyinterier LLC, in order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation, legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, as well as energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources, including technical regulations, and project documentation; b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations, and project documentation. 7. The subject of this audit is compliance with mandatory requirements regarding: a) compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the Code) (subject to changes made to the project documentation in accordance with Parts 3.8 3.9 of Article 49 of the Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and equipment requirements for capital construction facilities accounting for the energy resources used; b) availability of a building permit; c) compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 342100089978
Unscheduled inspection
Start date: 2021-04-01, end date: 2021-04-05, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: This inspection is carried out in accordance with the inspection program received by a representative of the developer, Investvolgstroy LLC, in order to assess the compliance of activities carried out at the facility with the requirements of urban planning legislation of the Russian Federation, fire safety requirements, including technical regulations and project documentation.; The purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation. The subject of this audit is compliance with the mandatory requirements regarding: a) compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the Code) (as amended included in the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of the Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements do not apply) and the requirements for equipping the facility with metering devices for used energy resources; b) the availability of a building permit; c) compliance with the requirements set out in Parts 2.3 and 3.1 of art.52 of the Code.


# 342000129409
Unscheduled inspection
Start date: 2021-03-10, end date: 2021-03-16, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a) this inspection is carried out in accordance with the inspection program received by a representative of the developer, Stroyinterier LLC, in order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation, legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, as well as energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources, including technical regulations, and project documentation; b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations, and project documentation. 7. The subject of this audit is compliance with mandatory requirements regarding: a) compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the Code) (subject to changes made to the project documentation in accordance with Parts 3.8 3.9 of Article 49 of the Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and equipment requirements for capital construction facilities accounting for the energy resources used; b) availability of a building permit; c) compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 342000129363
Unscheduled inspection
Start date: 2021-03-10, end date: 2021-03-16, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a) this inspection is carried out in accordance with the inspection program received by a representative of the developer, Stroyinterier LLC, in order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation, legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, as well as energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources, including technical regulations, and project documentation; b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations, and project documentation. 7. The subject of this audit is compliance with mandatory requirements regarding: a) compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the Code) (subject to changes made to the project documentation in accordance with Parts 3.8 3.9 of Article 49 of the Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and equipment requirements for capital construction facilities accounting for the energy resources used; b) availability of a building permit; c) compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 342105301030
Unscheduled inspection
Start date: 2021-01-15, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 342005291664
Unscheduled inspection
Start date: 2020-12-10, end date: 2020-12-17, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: but the real test is conducted in accordance with the program checks received by the representative of the developer OOO "'er" with the purpose of conformity assessment activities undertaken at the Facility requirements of planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection requirements of fire safety and sanitary and epidemiological welfare of the population as well as the requirements of the energy efficiency requirements of equipment of a capital construction object metering devices of energy resources including technical regulations and project documentation b the purpose of this check is to prevent the detection and suppression of violations of laws of the Russian Federation including technical regulations and project documentation 7 the Subject of this review is to comply with the mandatory requirements and the compliance of contractors and construction materials used in the construction process of reconstruction of capital construction object and the results of such work requirements approved in accordance with paragraphs 152 and 153 of 15 of article 48 of the town planning code further, the Code project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of the Code and the information model, or if the formation and maintenance of information models are required in accordance with the requirements of this Code, including the requirements of energy efficiency with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resources b permit construction in the implementation of the requirements provided for by parts 2 3 and 31 of article 52 of the town planning code of the Russian Federation


# 342005291652
Unscheduled inspection
Start date: 2020-12-10, end date: 2020-12-17, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: but the real test is conducted in accordance with the program checks received by the representative of the developer OOO "'er" with the purpose of conformity assessment activities undertaken at the Facility requirements of planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection requirements of fire safety and sanitary and epidemiological welfare of the population as well as the requirements of the energy efficiency requirements of equipment of a capital construction object metering devices of energy resources including technical regulations and project documentation b the purpose of this check is to prevent the detection and suppression of violations of laws of the Russian Federation including technical regulations and project documentation 7 the Subject of this review is to comply with the mandatory requirements and the compliance of contractors and construction materials used in the construction process of reconstruction of capital construction object and the results of such work requirements approved in accordance with paragraphs 152 and 153 of 15 of article 48 of the town planning code further, the Code project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of the Code and the information model, or if the formation and maintenance of information models are required in accordance with the requirements of this Code, including the requirements of energy efficiency with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resources b permit construction in the implementation of the requirements provided for by parts 2 3 and 31 of article 52 of the town planning code of the Russian Federation


# 342005186486
Unscheduled inspection
Start date: 2020-10-28, end date: 2020-10-30, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In accordance with the inspection program in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, fire safety requirements, including technical regulations and design documentation, the objective of this inspection is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe purpose of this inspection is to comply with mandatory requirements regarding the compliance of work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work meet the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation hereinafter referred to as the Code, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of the Code and or the information model if the formation and the maintenance of an information model is mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the facility with metering devices for energy resources used and the availability of a construction permit to comply with the requirements established by HH 23 and 31 ct52 of the Code


# 342004531153
Unscheduled inspection
Start date: 2020-08-19, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.