# 562100798298
Unscheduled inspection
Start date: 2021-09-21, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: - this inspection is carried out for the purpose of: the implementation of regional state construction supervision in connection with the receipt of a notice of completion of the capital construction facility;
- the objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban planning activities, project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer (including taking into account changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the Code, are part of such project documentation) (hereinafter referred to as project documentation).
- The subject of this audit is compliance with:
1) compliance of the work performed and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved design documentation;
2) requirements for a construction permit;
3) the requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation;
4) requirements for the procedure for the implementation of construction control established by the Urban Planning Code of the Russian Federation and other regulatory legal acts
# 562100459756
Unscheduled inspection
Start date: 2021-08-26, end date: —, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: - this inspection is carried out for the purpose of: carrying out regional state construction supervision on the basis of the inspection program approved on 07.07.2021, as well as on the basis of the notice of the beginning of construction dated 07.07.2021 No. 1.
- the objectives of this inspection are: identification and suppression of violations of the requirements of project documentation, legislation on urban development (Part 2 of Article 51, Part 2, 3.1, 6 of Article 52, part 2, 4 of Article 53 of the Urban Planning Code of the Russian Federation).
-the subject of this audit is: compliance of the work performed and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (including taking into account the changes made to the working documentation and which are in accordance with Part 1.3 Article 52 of this Code as part of such project documentation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code); requirements for a construction permit; requirements established by parts 2 and 3.1 of Article 52 of this Code; requirements for the procedure for carrying out construction control, established by this Code, other regulatory legal acts; No. 1,2 of the inspection program dated 07/09/2021 – (preparatory work and other measures for the organization of construction; earthworks).
# 562100459648
Unscheduled inspection
Start date: 2021-08-26, end date: —, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: - this inspection is carried out for the purpose of: implementation of regional state construction supervision on the basis of the inspection program approved on 04/19/2021.
- the objectives of this inspection are: identification and suppression of violations of the requirements of project documentation, legislation on urban development (Part 2 of Article 51, Part 2, 3.1, 6 of Article 52, Part 2, 4 of Article 53 of the Urban Planning Code of the Russian Federation).
-the subject of this audit is: compliance of the work performed and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of art. 48 of the Urban Planning Code of the Russian Federation (including taking into account changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of this Code, are part of such project documentation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code); requirements for a construction permit; requirements established by parts 2 and 3.1 of Article 52 of this Code; requirements to the procedure for the implementation of construction control established by this Code and other regulatory legal acts; (item No. 3,4,5 of the inspection program dated 04/19/2021 – (installation of load-bearing and enclosing structures (masonry of external and internal walls, installation of staircase elements, lintels of openings, ceilings) of the 1st – 3rd floors; external and internal networks (water supply, sewerage, electricity; heating and ventilation; roofing).
# 562100306118
Unscheduled inspection
Start date: 2021-07-01, end date: —, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: - this inspection is carried out for the purpose of: implementation of regional state construction supervision on the basis of the inspection program approved on 04/19/2021 and on the basis of the notice of the beginning of construction dated 04/14/2021 No. 1.
- the objectives of this inspection are: identification and suppression of violations of the requirements of project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with devices accounting for the energy resources used, legislation on urban planning (Part 2 of Article 51, Part 2, 3, 3.1, 6 of Article 52, part 2, 4 of Article 53 of the Urban Planning Code of the Russian Federation).
-the subject of this audit is: compliance with the mandatory requirements of urban planning legislation; compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of art. 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation), including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for energy resources used (item No. 1,2 of the inspection program dated 04/19/2021 – (preparatory work and other measures for the organization of construction; installation of foundations, walls of technical underground), and also, compliance with the deadlines for sending a notice by the developer about the start of construction of a capital construction facility, compliance with urban planning legislation (part 2 of Article 51, Part 2, 3, 3.1, 5, 6 of Article 52, part 2, 4 of Article 53, part 1 of Article 55 of the Urban Planning Code of the Russian Federation).
# 562004498145
Unscheduled inspection
Start date: 2020-08-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 562004439388
Unscheduled inspection
Start date: 2020-06-25, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:
# 561904068703
Unscheduled inspection
Start date: 2019-12-19, end date: 2019-12-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision on the basis of the inspection program approved by 25092019 The objectives of this inspection are to identify and suppress violations of the requirements of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used legislation on urban development h 2 st 51 h 2 3 31 6 st 52 h 2 4 st 53 of the Urban Planning Code of the Russian Federation The subject of this audit is the compliance of the completed works and the construction materials used during the construction of the capital construction facility with the results of such work with the requirements of project documentation code 061905 positive conclusion of the examination of project documentation from 09092019 562120239422019 including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for used energy resources compliance with urban planning legislation h 2 st 51 h 2 3 31 6 st 52 h 2 4 st 53 of the Urban Planning Code of the Russian Federation p 12 inspection programs preparatory period earthworks installation of strip foundations floors on otm 0300
# 561903732260
Unscheduled inspection
Start date: 2019-10-03, end date: 2019-10-09, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision on the basis of a notice from the developer dated 20092019 1 on the start of construction of a capital construction facility. The objectives of this inspection are to identify and suppress violations of the requirements of legislation on urban development h 2 st 51 h 2 3 31 5 6 st 52 h 2 4 st 53 h 1 st 55 of the Urban Planning Code of the Russian Federation the purpose of this check is to comply with the deadlines for sending a notice by the developer about the start of construction of a capital construction facility compliance with urban planning legislation h 2 st 51 h 2 3 31 5 6 st 52 h 2 4 st 53 h 1 st 55 of the Urban Planning Code of the Russian Federation
# 56150601449770
Unscheduled inspection
Start date: 2015-12-21, end date: 2015-12-29, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Orenburgskoi oblasti
Purpose of inspection: control over the execution of the licensing authority's regulation 18911 of 091115