# 221800014118
Unscheduled inspection
Start date: 2018-01-18, end date: 2018-01-19, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to verify the implementation of regulation 149GSN from 10112017 to actu240GSN from 10112017, the objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer, including the requirements of technical regulations and project documentation. The subject of this audit is ch2 st54 GrK RF verification of the conformity of work performed and construction materials used during the construction reconstruction of a capital construction facility and as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, compliance with the mandatory requirements for a construction permit and the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation Federal Law No. 30122009 384 FZ "Technical Regulations on the Safety of Buildings and Structures