Found 5 inspections:

# 782004411993
Unscheduled inspection
Start date: 2020-05-19, end date: 2020-07-10, duration:
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy SanktPeterburga
Purpose of inspection: To establish that this inspection is carried out in order to determine the compliance of the constructed capital construction facility with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used compliance with the requirements of h2 h 3 h 31 st 54 of the Urban Planning Code The tasks of this inspection are prevention as well as identification and suppression of violations committed by the developer the customer the person carrying out construction on the basis of contracts with the developer or the customer for violations of compliance of works performed during the construction reconstruction of capital construction facilities with the requirements of technical regulations other regulatory legal acts and design documentationthe subject of this audit is the arrangement of internal and external engineering networks Installation of equipment Landscaping Verification of the completed capital construction facility for compliance with the requirements of design documentation including the requirements of fire protection measures measures to ensure sanitary and epidemiological well-being of the population environmental protection, energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used


# 781903612442
Unscheduled inspection
Start date: 2019-09-26, end date: 2019-10-18, duration:
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy SanktPeterburga
Purpose of inspection: Compliance of the work and the construction materials used in the construction of the capital construction facility for the installation of enclosing structures 100 as well as the results of such work the performance of the indicators described in the construction permit the tasks of this audit are to prevent the identification and suppression of violations of the legislation on urban planning and design activities committed by the developer the customer as well as the person carrying out construction on the basis of an agreement with the developer or the customer hereinafter the contractor Documentationthe subject of this audit is to determine the compliance of the work performed with the construction materials used in the construction of a capital construction facility, as well as the results of such work, with the requirements of project documentation, the availability of a construction permit, and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 781902748758
Unscheduled inspection
Start date: 2019-05-27, end date: 2019-06-24, duration:
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy SanktPeterburga
Purpose of inspection: Determination of compliance of the performed works used in the process of construction of a capital construction facility of building materials as well as the results of such work with the requirements of design documentation availability of a construction permit compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation Prevention detection and suppression of violations of the legislation on urban planning activities and design documentation Building frame 100 enclosing structures 50


# 781902541969
Unscheduled inspection
Start date: 2019-02-19, end date: 2019-02-27, duration:
Authority: Otdel po voprosam migracii UMVD Rossii po Nevskomu raionu g SanktPeterburga
Purpose of inspection: The audit is carried out in order to verify compliance with the legislation of the Russian Federation in the field of migration. The objectives of this audit are to comply with the requirements of the legislation of the Russian Federation in the field of migration, identify administrative offenses in the field of migration and crimes, bring those responsible for administrative offenses in the field of migration to responsibility, ensure the rights and legitimate interests of foreign citizens and stateless persons, identify and eliminate the causes and conditions conducive to the commission of administrative offenses in the field of migration and crimes


# 781802079406
Unscheduled inspection
Start date: 2018-11-08, end date: 2018-12-05, duration:
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy SanktPeterburga
Purpose of inspection: Compliance of the completed works with the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation Prevention as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance of works performed during construction reconstruction of capital construction facilities with the requirements of technical regulations, other regulatory legal acts and project documentation of zero cycle work foundations basement walls and ceilings


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.